ID Date Author Categorydown Type Module Target/Number Subject Text Attachments
  2072   Thursday, February 27, 2020, 10:37 David WangSafe Module ParkingStandard OperationTM2 Start of SMP vacuum pump.TM2 in SMP with old SiC #39 target on it.
SMP vacuum pump is started. 
  
  2076   Wednesday, March 04, 2020, 14:30 David WangSafe Module ParkingStandard OperationTM2 Remove of TM2 from SMP to SHC.Frank and I removed TM2 from SMP to SHC.
The move is successful. 
  
  2094   Wednesday, May 20, 2020, 13:30 David WangSafe Module ParkingMaintenance  Silo area radio active waste clean up. Sorted and packed one 55 gallon drum with
low contamination and active stuffs which
are placed around silo area in the past.
  
  2101   Thursday, June 11, 2020, 12:36 David WangSafe Module ParkingRepairTM3 TM3 containment box and service tray field measurement. At 15cm distance: Containment box   
  2109   Tuesday, June 23, 2020, 10:56 David WangSafe Module ParkingStandard Operation  SMP annual service. Dan and I did the SMP annual  maintenance
service today. Lid open/close , vessel rotation
and limit switch check, lubricate chains,
  
  2125   Thursday, July 16, 2020, 10:20 Adam NewsomeSafe Module ParkingMaintenance  SMP: Annual Electrical InspectionAn electrical systems check was performed
on the SMP by Adam Newsome and Travis Cave.
Overall, there were no issues to
  
  2179   Tuesday, January 19, 2021, 11:32 Travis CaveSafe Module ParkingStandard OperationTM2Nb#9Module move TM#2 with Nb#9 was moved from ITW
to SHC and then with no target it was moved
from the SHC to the SMP.
  
  2186   Wednesday, February 10, 2021, 13:30 David WangSafe Module ParkingStandard Operation  TM2 and TM4 electrical check without targets. TM2 at SMP under vacuum. TM4 at silo. 
Frank and I did the tests. Everything is
fine on TM4 check.  On TM2,  all
 TM2_and_TM4_electrical_check_without_target.pdf 
  2231   Wednesday, July 07, 2021, 11:59 Adam NewsomeSafe Module ParkingMaintenance  Annual Electrical and Mechanical InspectionAn annual electrical and mechanical inspection
was performed on the SMP today by Adam Newsome,
Dan McDonald, and Jason Zhang as per Work
 Capture.PNGPXL_20210707_162143876.jpgPXL_20210707_162918257.jpg 
  2342   Thursday, June 30, 2022, 14:28 Nadia JorgensonSafe Module ParkingStandard Operation  Annual Inspection of Safe Module Parking - Electrical  
An annual electrical
  
  2343   Monday, July 04, 2022, 11:44 Nadia JorgensonSafe Module ParkingStandard Operation  Annual Inspection of Safe Module Parking - Mechanical  
An
 SMP_Missing_Washers_1.jpgSMP_Missing_Washers_2.jpgSMP_Missing_shims.jpg 
  2403   Tuesday, January 10, 2023, 10:15 Frank SongSafe Module ParkingStandard OperationTM2UCx40 removedTM2 electrical check with no target attached on SW silo TM2 with no target on SW silo be
electrical checked right after module moving.
 TM2_electrical_check_without_UCx40_on_SW_silo.png 
  2438   Thursday, May 04, 2023, 07:14 David WangSafe Module ParkingStandard OperationTM4  SMP vacuum pumpimg down is stopped. SMP  vacuum pumping down is stopped.
SMP and TM4 venting to atmosphere will be
started soon. 
  
  2462   Wednesday, June 21, 2023, 14:39 Adam NewsomeSafe Module ParkingMaintenance  Annual electrical and mechanical inspection of Safe Module ParkingAn annual electrical and mechanical inspection
was performed on the  SMP today by Adam Newsome,
Travis Cave, Eric Lahe, Maico Dalla Valle,
 PXL_20230621_210144119.MP.jpgPXL_20230621_210546559.jpgPXL_20230621_210146892.jpg 
  2534   Friday, January 26, 2024, 11:53 David WangSafe Module ParkingStandard OperationTM4 Tm4 has been moved to SMP.TM4 has been moved to SMP. The move is
smooth. I started SMP vacuum pump. The TM4
and SMP vessel is under vacuum now. 
  
  2535   Friday, January 26, 2024, 11:57 David WangSafe Module ParkingStandard OperationTM4 TM4 coil1, 2, and HS electrical check at SMP after module moving.TM4 coil1, 2 and HS are all OL at 250V
at SMP after module move. This week, Chad
and Carl fixed short issue on coil1, 2 and
  
  2637   Wednesday, July 10, 2024, 09:55 Adam NewsomeSafe Module ParkingMaintenance   Annual electrical and mechanical inspection of Safe Module Parking An annual electrical and mechanical inspection
was performed on the   SMP today by Adam
Newsome, Travis Cave, Riley Sykes, Maico
 PXL_20240710_160636341.jpgPXL_20240710_160506424.jpg 
  2639   Friday, July 12, 2024, 08:51 Riley SykesSafe Module ParkingMaintenance  SMP chain guard SS washers were added to all slotted
holes on SMP chainguard cover plate
  
  2745   Thursday, January 09, 2025, 11:46 David WangSafe Module ParkingStandard OperationTM4No targetSMP is under vacuum for TM4 storage during shut down.  SMP:MP1 is started with SMP BV1 is
opened. SMP is under vacuum for TM4 storage
during shut down.
  
  2762   Monday, February 03, 2025, 13:04 David WangSafe Module ParkingMaintenance  ITW/ITW 24VDC electrical connectors for TP BVs MRO.ITW/ITW 24VDC electrical connectors for
TP BVs MRO has been done.  
  