596
|
Tuesday, February 11, 2014, 13:56 |
chad fisher | South Hot-Cell | Repair | TM2 | | waterblock cleaning | New cleaning and polishing pads have been
inserted onto the hot cell as well as rubber
bungs and a new blank off. |
|
597
|
Thursday, February 13, 2014, 09:24 |
David Wang | South Hot-Cell | Repair | TM2 | | Leak check TM2 tube heater (+) water line with rubber insert blocked WB in SHC | Chad and I did the Leak checked TM2
tube heater (+) water line with rubber
insert plugged water block on " D" |
|
598
|
Thursday, February 13, 2014, 13:30 |
David Wang | South Hot-Cell | Repair | TM2 | | pressure test on TM2 tube heater +(D) water line. | Chad and I did the pressure test on TM2tube
heater+(D) water line at SHC with shop
air.We tested from 30psi to 80psi on both |
|
599
|
Thursday, February 13, 2014, 14:15 |
David Wang | South Hot-Cell | Repair | TM2 | | pressure test on TM2 tube heater +(D) water line. |
|
|
600
|
Thursday, February 13, 2014, 14:23 |
David Wang | South Hot-Cell | Repair | TM2 | | Leak check on TM2 tube heater (+) water line with blank off(elastic seal) installed on WB. | Chad and I did the leak check on TM2 tube
heater (+) water line with blank off(
+ elastic o ring seal) installed on "D" |
|
601
|
Monday, February 17, 2014, 09:32 |
David Wang | Conditioning Station | Repair | TM2 | | helium pressure test on TM2 tube heater +(D) water line. | I did the helium pressure test on Tube
heater+ line this morning. The vacuum on
CS and TM2 are very good. The base lake rate |
6x |
602
|
Tuesday, February 18, 2014, 11:26 |
David Wang | Conditioning Station | Repair | TM2 | | I stopped turbo pumps and disconnected vacuum system on TM 2 and CS | I stopped turbo pumps and disconnected
vacuum system on TM2 and CS. The TM2 will
be moved to SHC for C seal installation on |
|
603
|
Thursday, February 20, 2014, 09:45 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | no target | module move | TM#2 has been moved from the conditioning
station to the south hot cell. |
|
604
|
Thursday, February 20, 2014, 11:04 |
chad fisher | South Hot-Cell | Repair | TM2 | | Readying TM2 for C-Seal Leak Check | Containment box has been removed and water
block jig installed. |
|
605
|
Monday, February 24, 2014, 11:05 |
chad fisher | South Hot-Cell | Repair | TM2 | | Circuit D blank off | The blank off with the o-ring has been
removed, manipulator fixed, circuit D water
block sealinhg surfaces cleaned and blank |
|
606
|
Monday, February 24, 2014, 12:09 |
chad fisher | South Hot-Cell | Repair | TM2 | | C-seal blank off test | Circuit D has passed the vacuum leak check.
Jig has been removed and containment box
re-installed for move to conditioning station. |
|
607
|
Monday, February 24, 2014, 13:52 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | module move | TM#2 moved from the south hot cell to the
conditioning station. |
|
608
|
Tuesday, February 25, 2014, 06:53 |
David Wang | South Hot-Cell | Repair | TM2 | | Leak check on TM2 tube heater (+) water line with blank off(C-seal) installed on WB. | Chad and I did the leak check on
TM2 tube heater (+) water line with
blank off and C-seal installed on |
|
609
|
Tuesday, February 25, 2014, 10:00 |
David Wang | Conditioning Station | Repair | TM2 | | helium pressure test on TM2 tube heater (+) water line with blank off(C-seal) installed on WB. | I did the helium pressure test
on TM2 tube heater (+) water line with
blank off(C-seal) installed on water |
10x |
611
|
Wednesday, March 05, 2014, 10:07 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | no target | module move | TM#2 with no target or source tray has
been moved from the conditioning station
to the north east silo. TM#1 with no target |
|
713
|
Thursday, July 24, 2014, 09:10 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | module move | TM#2 has been moved to the hot cell from
the north east silo. |
|
714
|
Thursday, July 24, 2014, 18:21 |
Grant Minor | South Hot-Cell | Repair | TM2 | No target / no source tray | Leak check on TM2 ionizer tube cooling lines C and D - module side | Target Ionizer tube cooling lines "C"
and "D" in Target Module 2 were
both leak checked at the Hot Cell. |
|
715
|
Monday, July 28, 2014, 09:29 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | no target | module move | TM#2 has been moved from the south hot
cell to the conditioning station. |
|
716
|
Monday, July 28, 2014, 14:37 |
David Wang | Conditioning Station | Development | TM2 | | helium pressure test on TM2 tube heater +(D)and -(C)water lines. |
TM2 installed in Conditioning
Station
Varian Leak detector
connected directly to Target Module 2 |
7x |
717
|
Monday, July 28, 2014, 14:45 |
David Wang | Conditioning Station | Development | TM2 | | turned off TM2 and CS turbo pumps. | I turned off TM2 and CS turbo-pumps. TM2
will be moved from CS to silo tomorrow morning. |
|