ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
|
1733
|
Friday, June 08, 2018, 11:36 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Source Tray Removal Progress |
The containment box has been removed from TM2, the Enzel lens and steerers disconnected and optics tray removal has commenced. |
Attachment 1: TM2_06082018.jpg
|
|
|
1732
|
Friday, June 08, 2018, 10:22 |
Anders Mjos | ITE | Standard Operation | TM4 | UC#22 | Module move |
Travis Cave wrote: |
TM#4 ,with UC#22, was moved from the south hot cell to the east target station. Upon lowering the module down it made contact with the IMC, At that point the module was removed and placed back in the south hot cell. The IMC was inspected and problem corrected and the module was moved back to the east target station without a problem.
|
The IMC (ITA0160) appears to have a dent in it from the contact with the Target Module. The pressure on the IMC was found to be about negative ~3 mmHg and was increased to ~20 mmHg to attempt to retract the IMC further away from the TM. This pressure is similar to the pressure used at the Conditioning Station. The bellows appears not to be symmetrically compressed. It should be inspected again and pressure checked and monitored for upcoming module moves. |
Attachment 1: IMC.png
|
|
|
1731
|
Thursday, June 07, 2018, 11:37 |
Travis Cave | ITE | Standard Operation | TM4 | UC#22 | Module move |
TM#4 ,with UC#22, was moved from the south hot cell to the east target station. Upon lowering the module down it made contact with the IMC, At that point the module was removed and placed back in the south hot cell. The IMC was inspected and problem corrected and the module was moved back to the east target station without a problem. |
|
1730
|
Thursday, June 07, 2018, 11:33 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#22 | Electrical Check |
The results of TM#4 with UC#22 electrical check. See attached PDF. |
Attachment 1: TM4_UC22_Electrical_Check_South_Hot_Cell.pdf
|
|
|
1729
|
Monday, June 04, 2018, 13:27 |
chad fisher | South Hot-Cell | Repair | TM4 | | Window Loop and Shield |
The tray with window waterline loop and EF Shield has been installed into TM4. |
Attachment 1: jhgf.jpg
|
|
|
1728
|
Thursday, May 31, 2018, 14:22 |
chad fisher | South Hot-Cell | Repair | TM4 | | Loop and beam shield |
Tray with loop and beam shield has been inserted into the hot cell to be installed on TM4 . |
|
1727
|
Wednesday, May 30, 2018, 09:55 |
David Wang | Conditioning Station | Repair | TM2 | | TM2 and TCS vacuum pumps are switched off. |
I switched off TM2 and TCS vacuum pumps. The TCS and TM2 will be under vacuum without pumping. |
|
1726
|
Wednesday, May 30, 2018, 09:51 |
David Wang | Conditioning Station | Repair | TM2 | | TM2 water lines helium pressure test at TCS. |
I did a helium pressure test on TM2 water lines at TCS. We will remove the TM2 source tray soon so this test is a reference check for future new source. The result:
Helium 70 psi, 2 minutes to each circiut. Leak detector base LR.0.0x e-9atm.cc/sec, base pressure 0.0x e-4torr
Ta+(A) 0.0x e-9atm.cc/sec
Ta-(B) 0.0x e-9atm.cc/sec
Tu-(C) 7.8x e-7 atm.cc/sec
Tu+(D) 3.5x e-7 atm.cc/sec
Coil 2(PU) 0.0x e-9atm.cc/sec
Coil 1(RU) 0.0x e-9atm.cc/sec
EE 8.2 x e-9atm.cc/sec
MSP 0.0x e-9atm.cc/sec
Containment box window 0.0 xe-9atm.cc/sec
HS no target and opened. No test.
All water lines on module side in TM2 should be in good condition according to this test . The leak response we found on B and C lines are from water block seals mostly. |
|
1725
|
Monday, May 28, 2018, 14:06 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#37 | Spent Target Move |
SiC#37 has been moved from the South Hot Cell to the Spent Target Vault. It was placed in Pail #165 and put in spot 3B of the vault and it measured 25.8mSv/hr upon removal from the hot cell. See the attached PDF for details |
Attachment 1: Target_Index_2018-05-28.pdf
|
|
|
1724
|
Friday, May 25, 2018, 11:41 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | Module move |
TM#2 has been moved from the south hot cell to the conditioning station. |
|
1723
|
Thursday, May 24, 2018, 15:19 |
Keith C Ng | Assembly/Bench Test | Repair | TM2 | | tm 2 source tray build |
Attached alignment check notes after brazing and fabrication.
First page lower half shows establishment of baseline using master jig
Second page top half shows the alignment of the target mounting plate jig and the steerer cone aperture.
Second page bottom half shows alignment of the master target jig. Master target jig needed the 9 pin and heat shield locating features removed to seat the target correctly.
Overall, source tray assembly sits .006" high on average (min .003", max .010"), .003" to the left with respect to ion beam axis. |
Attachment 1: 20180524_alignmentcheckresults.pdf
|
|
|
1722
|
Thursday, May 24, 2018, 14:04 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | Modules moved |
TM#4 has been moved from the south hot cell to the east target station, and TM#2 has been moved from the south silo to the south hot cell. |
|
1721
|
Thursday, May 24, 2018, 10:02 |
Anders Mjos | ITE | Development | TM4 | Empty | Module move ventilation test |
The new module move ventilation procedure was successfully tested (ITM:MP2). ITM:CM4 did not drop below 6 in during the test. |
|
1720
|
Wednesday, May 23, 2018, 10:40 |
chad fisher | South Hot-Cell | Repair | TM4 | | Optics Tray Removal |
The optics tray has been removed from TM4.
|
Attachment 1: 20180523_103405.jpg
|
|
Attachment 2: 20180523_103435.jpg
|
|
Attachment 3: 20180523_103440.jpg
|
|
|
1719
|
Wednesday, May 23, 2018, 09:48 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | Module move |
TM#4 with no target and no containment box has been moved from the conditioning station to the south hot cell. |
|
1718
|
Tuesday, May 22, 2018, 10:02 |
Anders Mjos | Conditioning Station | Repair | | | Water leak from TK1 over the weekend |
Link to e-log,
Link to efault
Tank level down from 76 to 55 in on TK1
Valve replaced by Curtis today |
Attachment 1: 2018-05-22_TCS_TK1_water_leak.png
|
|
Attachment 2: Broken_Valve.jpg
|
|
Attachment 3: 2018-05-22_TCS_TK1_water_leak_archiver.png
|
|
|
1717
|
Friday, May 18, 2018, 09:34 |
David Wang | Conditioning Station | Repair | TM4 | | water leak on TM4 Tube heater - B line confirmed. |
At 8:50 AM today, I applied water to TM4 tube heater - (B) line at TCS. All high vacuum gauges got response on this action. Water is leaking through B line on TM4.
It should be D line . David 2018-06-05 |
Attachment 1: TM4_2018-05-18_Water_Leak.docx
|
|
1716
|
Thursday, May 17, 2018, 13:17 |
Travis Cave | ITW | Standard Operation | | | Entrance module move |
The west entrance module has been moved from the silo to the west target station. |
|
1715
|
Thursday, May 17, 2018, 11:30 |
Anders Mjos | Conditioning Station | Maintenance | TM4 | | HV test/conditioning of damaged source tray |
BIAS only. Water lines looped on top. Containment box off.
Thursday, May 17, 2018, 11:20: Vacuum 7.2E-7 Torr
Thursday, May 17, 2018, 11:30: 10 kV
Thursday, May 17, 2018, 11:42: 20 kV
Thursday, May 17, 2018, 12:14: 25 kV
Thursday, May 17, 2018, 12:35: 30 kV
Thursday, May 17, 2018, 16:13: 35 kV
Thursday, May 17, 2018, 17:339: 37.5 kV
Thursday, May 17, 2018, 17:40: vacuum 6.8E-7 Torr
Thursday, May 17, 2018, 18:13: BIAS off. |
Attachment 1: TM4_2018-05-18_Water_Leak.docx
|
|
1714
|
Tuesday, May 15, 2018, 10:21 |
David Wang | Conditioning Station | Standard Operation | TM4 | | Tm4 water circles helium pressur test result |
Helium pressure test on TM4 water lines is done this morning. 70 psi helim , 1 minutes time to each circle. The result:
A(oven+): 0.00xE-9 atm.cc/sec
B(Oven -): 8.1Xe-7 atm.cc/sec
C(tube -): 0.00xE-9 atm.cc/sec
D(tube+): 1.0xE-5 atm.cc/sec
PQ(coil 2): capped on top. water lines were removed because of leak
RU(Coil1): 0.00xE-9 atm.cc/sec
EE: 0.00xE-9 atm.cc/sec
MSP: 0.00xE-9 atm.cc/sec
HS: No target, capped on top. It was fine on last target check in 2017 Oct.
window: Capped on top. Containment box is not installed.
The leak check on D line caused the IG1 small response during test.
B and D circle are double checked. The reasults are same.
D line leak is in E-5 atm.cc/sec range. It is possible to locate it by using helium spray method in SHC. The containment box is not on so it should be easy to do it.
Switch on IGA gauge at TCS and apply helium and water at certain psi to check the IGA response may give us more information on these leaks.
All lines were test in last year shut down. They were good.
|