2334
|
Tuesday, June 21, 2022, 18:30 |
Frank Song | ITW | Standard Operation | TM2 | SiC#43 Febiad | Module Connection | TM2 with Febiad Target SiC #43 was
connected in ITW. NOTE: the number of TARGET
in attached picture should be #43. |
|
2346
|
Tuesday, July 19, 2022, 11:47 |
Frank Song | ITW | Standard Operation | TM2 | SiC#43 Febiad | TM2 with SiC#43 disconnected in ITW | the module was disconnected in pit
and moved to NHC. |
|
2347
|
Tuesday, July 19, 2022, 11:53 |
Frank Song | North Hot-Cell | Standard Operation | TM2 | SiC#43 Febiad | electrical check | A electrical check was done at NHC,
see the pic attached with please. |
|
2351
|
Thursday, July 28, 2022, 10:47 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#43 | Spent Target Move | The spent target SiC#43 was moved
from the north hot cell in pail #272 and
place in 5A of the spent target vault. See |
|
2332
|
Tuesday, June 21, 2022, 15:36 |
Matthew Gareau | North Hot-Cell | Repair | TM2 | SiC#42, SiC#43 | multipin guide pin issues | While removing the SiC#42
it became apparent that the multipin guide |
|
2337
|
Wednesday, June 22, 2022, 09:14 |
David Wang | South Hot-Cell | Standard Operation | TM2 | SiC#42 and SiC#43. | Three of TM2 moves related to SiC#42 to SiC #43 target switching job. | Monday morning June 20th: TM2 with SiC
# 42 was moved from ITW to NHC.
Monday afternoon: TM2 with no target |
|
2327
|
Monday, June 06, 2022, 14:15 |
Frank Song | South Hot-Cell | Standard Operation | TM2 | SiC#42 | TM2 FEBIAD with Target and No external Connections | An electrical check was done at SHC
for TM2 with FEBIAD SiC #42 Target. |
|
2328
|
Tuesday, June 07, 2022, 14:15 |
Frank Song | ITE/ITW | Standard Operation | TM2 | SiC#42 | Module Connection | TM2 with Febiad target SiC#42 was
connected in ITW. |
|
2329
|
Thursday, June 09, 2022, 09:47 |
Matthew Gareau | South Hot-Cell | Repair | TM2 | SiC#42 | containment box repair, Einzle lens, multi pin | On June 2 2022, while attempting to install
target SiC#42 a gasket fell off the water
line. I attempted to remove the target to |
|
2330
|
Monday, June 20, 2022, 11:00 |
Frank Song | North Hot-Cell | Repair | TM2 | SiC#42 | Failed Sic#42 electrical measurement at NHC | An electrical check was done at NHC,
see attachment pls. |
|
2345
|
Wednesday, July 06, 2022, 10:30 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#42 | Spent Target Move | The spent SiC#42 was moved from the
north hot cell to the spent target vault,
it was placed in pail #271 and put in spot |
|
2244
|
Wednesday, September 15, 2021, 08:39 |
Travis Cave | ITE | Standard Operation | TM4 | SiC#41 | Module move | TM#4 with SiC#41 has been moved from the
NHC to ITE. |
|
2255
|
Monday, October 04, 2021, 10:52 |
Travis Cave | North Hot-Cell | Standard Operation | TM4 | SiC#41 | Module move | TM#2 moved from ITE to NHC SiC#41
removed and then moved back to ITE. |
|
2259
|
Wednesday, October 13, 2021, 11:54 |
Travis Cave | North Hot-Cell | Standard Operation | | SiC#41 | Spent Target Move | The spent SiC#41 target has been
placed in pail #260 and placed in spot 5B
of that spent target vault. See attached |
|
2243
|
Tuesday, September 14, 2021, 09:18 |
Travis Cave | South Hot-Cell | Repair | TM4 | SiC#40 | Module move | TM#4 with SiC#40 has been moved from the east
target station to the south hot cell. |
|
2034
|
Friday, November 29, 2019, 11:03 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | SiC#39 | Module move | TM#2 with the SiC#39 target has been
moved from the south hot cell to the east
target station. |
|
2071
|
Thursday, February 27, 2020, 09:50 |
Travis Cave | Safe Module Parking | Standard Operation | TM2 | SiC#39 | Module move | TM#2 with SiC#39 has been moved from
the east station to the smp. |
|
2270
|
Thursday, November 18, 2021, 09:47 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#38 and UC#29 | Spent Target Move | The spent targets SiC#38 and UC#29
have been removed from the spent target vault
and placed into the mini storage. See attached |
|
2033
|
Friday, November 29, 2019, 11:02 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | SiC#38 SiC#39 | Electrical Check | Results from the electrical check
with the old SiC#38 target and the new SiC#39. |
|
2025
|
Thursday, November 07, 2019, 08:56 |
David Wang | Conditioning Station | Standard Operation | TM2 | SiC#38 | TM2 in TCS. | Helium pressure leak check on TM2 HS line
at TCS is done. No leak. Also, Helium are
sprayed to gas line adapter and fittings. |
|