1680
|
Wednesday, January 17, 2018, 13:54 |
David Wang | Conditioning Station | Standard Operation | TM3 | | Start TM3 turbo pumps at TCS. |
TM3 turbo-pumps are started at TCS. We will keep pumps running until next Wednesday. |
1681
|
Monday, January 22, 2018, 07:47 |
David Wang | Conditioning Station | Standard Operation | TM3 | | Restarted TM3 vacuum sysytem after site power bump |
All TCS and TM3 vacuum pumps are started successfully. |
1783
|
Friday, September 14, 2018, 09:39 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | no target | Module move |
TM#3 with no target has been moved from the north east silo to the conditioning station. |
1792
|
Tuesday, September 25, 2018, 07:54 |
David Wang | Conditioning Station | Repair | TM3 | | TM3 is connected for HV test at TCS. |
water loops are by passed on top. All bias, EE, and EL are tied together. Started water system. |
1795
|
Wednesday, September 26, 2018, 07:14 |
David Wang | Conditioning Station | Repair | TM3 | | TM3 HV test at TCS. |
I did a HV test on TM3 at TCS yesterday. HV Ramp up speed: 1KV per 5 minutes when below 30KV,1KV per 10 minutes from 30-36KV. There is no major spark below36 KV . I could see lots small and big vacuum response on IG1 and PNG2 when conditioning from 30-36 KV, especially when closing to 36 KV. However, At 36.4 KV, There is a big continuous spark occurred. It could not be stopped until I lowed the HV to 14KV. I have to ramp up from 14 KV again. This behavior on TM3 HV test is same as before we saw. The module can not pass 36KV at present condition. During the test., EL is tied to 60KV bias. The HV cover on TM3 top is installed. And, Service tray cover plate is installed on TM3. |
1796
|
Thursday, September 27, 2018, 13:58 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | no target | Module move |
TM#3 has been moved from the conditioning station to the centre east silo. This will be its new home after the silo switcher-roo. |
1894
|
Monday, March 18, 2019, 07:25 |
David Wang | Conditioning Station | Maintenance | TM3 | | TCS vacuum pumps have been stopped. |
The TCS will be vented soon for TM2 move. |
1972
|
Thursday, August 29, 2019, 12:54 |
Adam Newsome | South Hot-Cell | Standard Operation | TM3 | | TM3 Move |
TM3 has been moved from the Middle-East silo to the South Hot Cell. |
1973
|
Tuesday, September 03, 2019, 10:48 |
Adam Newsome | South Hot-Cell | Standard Operation | TM3 | | TM3 Move |
TM3 has been moved from the South Hot-Cell to the Middle-East silo. |
2014
|
Friday, October 25, 2019, 06:43 |
David Wang | Safe Module Parking | Development | TM3 | | SMP vacuum |
TM3 was moved into SMP Oct 25 morning. After two nights pumping down, SMP CG1 read 30mtorr this morning. The pump is stopped. SMP will be vented soon for TM3 moving back to silo. |
2044
|
Thursday, January 09, 2020, 13:49 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | no target | Module move |
TM#3 has been moved from the south west silo to the conditioning station. |
2045
|
Thursday, January 09, 2020, 14:14 |
David Wang | Conditioning Station | Standard Operation | TM3 | | Start of TCS roughing pump for TM3. |
I started TCS roughing pump. TM3 TP1 and TP2 will be started tomorrow morning. |
2048
|
Tuesday, January 14, 2020, 10:12 |
David Wang | Conditioning Station | Standard Operation | TM3 | | Helium spray leak check on TCS. |
Using a long pole with a probe to spray helium on TCS vacuum seals and joints which are installed in TCS service pit. No response has been found on leak detector during leak check. TCS is leak free. |
2049
|
Tuesday, January 14, 2020, 10:19 |
David Wang | Conditioning Station | Standard Operation | TM3 | | TCS vacuum system is switched off. |
TM3 TP1 and TP2 work fine in past 4 days. During operation, The current draw on pumps were 0.7A to 0.8 A. TM3 will be moved back to silo tomorrow. |
2050
|
Thursday, January 16, 2020, 09:37 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | no target | Module move |
TM#3 has been moved from the conditioning station to the centre east silo. |
2101
|
Thursday, June 11, 2020, 12:36 |
David Wang | Safe Module Parking | Repair | TM3 | | TM3 containment box and service tray field measurement. |
At 15cm distance: Containment box window 21msv maximum. Service tray 8.0msv maximum.
At 0.5 meter distance 360degree rotation: containment box high 10msv, low 4.3msv.
Maximum 170 to 180 counts(44-2) on swipes taking from service cap inside.
0 to 20 counts(44-2) on air sample at 0.5 meter to containment box window panel.
80 counts(44-2) on air sample taking from service cap inside. The contamination level in service cap is low.
|
2122
|
Tuesday, July 07, 2020, 09:16 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | no target | Module move |
TM#3 has been moved from the silo to the conditioning station, where David and Frank will start on the gutting of the module. |
2124
|
Monday, July 13, 2020, 10:01 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | no target | Module move |
TM#3 has been moved from the conditioning station to the silo.
|
2152
|
Wednesday, September 30, 2020, 09:54 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | no target | Module move |
TM#3 is now in the south hot cell. |
2170
|
Wednesday, November 25, 2020, 09:05 |
Adam Newsome | South Hot-Cell | Standard Operation | TM3 | | Module Move |
TM3 has been moved from the Silo to the South Hot Cell. |