Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC, Page 51 of 138  Not logged in ELOG logo
ID Date Author Category Type Module Target/Numberdown Subject Text Attachments
  2334   Tuesday, June 21, 2022, 18:30 Frank SongITWStandard OperationTM2SiC#43 FebiadModule Connection TM2 with Febiad Target SiC #43 was
connected in ITW. NOTE: the number of TARGET
in attached picture should be #43. 
 TM2_with_sic_42_connected_in_ITW.jpg 
  2346   Tuesday, July 19, 2022, 11:47 Frank SongITWStandard OperationTM2SiC#43 FebiadTM2 with SiC#43 disconnected in ITW  the module was disconnected in pit
and moved to NHC.
 TM2_with_SiC43_disconnection_in_ITW.jpg 
  2347   Tuesday, July 19, 2022, 11:53 Frank SongNorth Hot-CellStandard OperationTM2SiC#43 Febiadelectrical check A electrical check was done at NHC,
see the pic attached with please.
 e_check_for_TM2_with_SiC43_Febiad.jpg 
  2351   Thursday, July 28, 2022, 10:47 Travis CaveSpent Target VaultStandard Operation SiC#43Spent Target Move The spent target SiC#43 was moved
from the north hot cell in pail #272 and
place in 5A of the spent target vault. See
 Target_Index_2022-07-28.pdf 
  2332   Tuesday, June 21, 2022, 15:36 Matthew GareauNorth Hot-CellRepairTM2SiC#42, SiC#43multipin guide pin issues While removing the SiC#42
it became apparent that the multipin guide
  
  2337   Wednesday, June 22, 2022, 09:14 David WangSouth Hot-CellStandard OperationTM2SiC#42 and SiC#43. Three of TM2 moves related to SiC#42 to SiC #43 target switching job. Monday morning June 20th: TM2 with SiC
# 42 was moved from ITW to NHC.
Monday afternoon: TM2 with no target
  
  2327   Monday, June 06, 2022, 14:15 Frank SongSouth Hot-CellStandard OperationTM2SiC#42TM2 FEBIAD with Target and No external Connections An electrical check was done at SHC
for TM2 with FEBIAD SiC #42 Target. 
 TM2_with_FEBIAD_SiC_42_electrical_check.jpg 
  2328   Tuesday, June 07, 2022, 14:15 Frank SongITE/ITWStandard OperationTM2SiC#42Module Connection TM2 with Febiad target SiC#42 was
connected in ITW.
 TM2_with_sic_42_connected_in_ITW.jpg 
  2329   Thursday, June 09, 2022, 09:47 Matthew GareauSouth Hot-CellRepairTM2SiC#42containment box repair, Einzle lens, multi pinOn June 2 2022, while attempting to install
target SiC#42 a gasket fell off the water
line. I attempted to remove the target to
  
  2330   Monday, June 20, 2022, 11:00 Frank SongNorth Hot-CellRepairTM2SiC#42Failed Sic#42 electrical measurement at NHC An electrical check was done at NHC,
see attachment pls.
 Failed_Sic#42_electrical_measurement_at_NHC.jpg 
  2345   Wednesday, July 06, 2022, 10:30 Travis CaveSpent Target VaultStandard Operation SiC#42Spent Target Move The spent SiC#42 was moved from the
north hot cell to the spent target vault,
it was placed in pail #271 and put in spot
 Target_Index_2022-07-06.pdf 
  2244   Wednesday, September 15, 2021, 08:39 Travis CaveITEStandard OperationTM4SiC#41Module moveTM#4 with SiC#41 has been moved from the
NHC to ITE.
  
  2255   Monday, October 04, 2021, 10:52 Travis CaveNorth Hot-CellStandard OperationTM4SiC#41Module move TM#2 moved from ITE to NHC SiC#41
removed and then moved back to ITE.
  
  2259   Wednesday, October 13, 2021, 11:54 Travis CaveNorth Hot-CellStandard Operation SiC#41Spent Target Move The spent SiC#41 target has been
placed in pail #260 and placed in spot 5B
of that spent target vault. See attached
 Target_Index_2021-10-13.pdf 
  2243   Tuesday, September 14, 2021, 09:18 Travis CaveSouth Hot-CellRepairTM4SiC#40Module moveTM#4 with SiC#40 has been moved from the east
target station to the south hot cell.
  
  2034   Friday, November 29, 2019, 11:03 Travis CaveSouth Hot-CellStandard OperationTM2SiC#39Module move TM#2 with the SiC#39 target has been
moved from the south hot cell to the east
target station.
  
  2071   Thursday, February 27, 2020, 09:50 Travis CaveSafe Module ParkingStandard OperationTM2SiC#39Module move TM#2 with SiC#39 has been moved from
the east station to the smp.
  
  2270   Thursday, November 18, 2021, 09:47 Travis CaveSpent Target VaultStandard Operation SiC#38 and UC#29Spent Target Move The spent targets SiC#38 and UC#29
have been removed from the spent target vault
and placed into the mini storage. See attached
 Target_Index_2021-11-18.pdfTarget_Index_2021-11-18_mini_vault.pdf 
  2033   Friday, November 29, 2019, 11:02 Travis CaveSouth Hot-CellStandard OperationTM2SiC#38 SiC#39Electrical Check Results from the electrical check
with the old SiC#38 target and the new SiC#39.
 Elec_chk_SiC#38_SHC_post_beam_TM2_11-26-2019.pdfElec_chk_SiC#39_SHC_TM2_11-29-2019.pdf 
  2025   Thursday, November 07, 2019, 08:56 David WangConditioning StationStandard OperationTM2SiC#38TM2 in TCS.Helium pressure leak check on TM2 HS line
at TCS is done. No leak. Also, Helium are
sprayed to gas line adapter and fittings.
  
ELOG V2.9.2-2455