1876
|
Tuesday, February 26, 2019, 08:51 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 containment box | The containment box has been reinstalled
onto TM2 in prepatation for testing in the
conditioning station. |
|
|
1819
|
Wednesday, November 07, 2018, 09:50 |
Anders Mjos | ITW | Standard Operation | TM2 | UC#25 | TM2 connected in ITW | TM2 was connected yesterday by Frank and
Anders. The West side panel with IG1S on
Exit Module 2 was replaced with a new SST |
|
|
1037
|
Thursday, August 13, 2015, 17:17 |
David Wang | Conditioning Station | Repair | TM2 | Dummy target | TM2 at CS | TM2 has been moved to CS. All turbo-pumps
have been started. The pumping down is good
so far. I connected the leak detector |
|
|
1040
|
Wednesday, August 19, 2015, 14:52 |
David Wang | Conditioning Station | Repair | TM2 | | TM2 at CS | During the TM2 HV test at CS, It failed.
In order to confirm there is no any water
leak inside the module after the heaters |
|
|
813
|
Friday, December 05, 2014, 07:47 |
David Wang | Conditioning Station | Development | TM2 | | TM2 at CS | The pumping down on TM2 at CS was good
overnight. However, the back up line pressure
is still too high for LD to get to 0.0-E-9atm.cc/sec |
|
|
2186
|
Wednesday, February 10, 2021, 13:30 |
David Wang | Safe Module Parking | Standard Operation | | | TM2 and TM4 electrical check without targets. | TM2 at SMP under vacuum. TM4 at silo.
Frank and I did the tests. Everything is
fine on TM4 check. On TM2, all |
|
|
1404
|
Wednesday, November 23, 2016, 16:21 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TM2 and TCS vacuum system has been connected. | All vacuum pumps have been started. Air
ballast 50seconds on roughing pump. Everything
is good so far. |
|
|
1489
|
Wednesday, April 12, 2017, 07:26 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TM2 and TCS vacuum system has been connected. | Roughing down overnight. Turbo pumps are
started this morning. Everything looks good
so far. |
|
|
1552
|
Wednesday, June 07, 2017, 13:34 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TM2 and TCS vacuum system has been connected. | I started all turbo pumps. |
|
|
1209
|
Wednesday, April 13, 2016, 10:46 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TM2 and TCS vacuum system has been connected. | TCS is under roughing now. |
|
|
1210
|
Wednesday, April 13, 2016, 10:46 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TM2 and TCS vacuum system has been connected. | TCS is under roughing now.
2016-04-14, Started TCS and TM2 turbo-pumps
yesterday afternoon. Overnight pumping down |
|
|
1230
|
Wednesday, May 11, 2016, 13:16 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TM2 and TCS vacuum system has been connected. | TM2 and TCS vacuum system has been connected.
I started all turbo pumps. Everything is
good so far. |
|
|
1727
|
Wednesday, May 30, 2018, 09:55 |
David Wang | Conditioning Station | Repair | TM2 | | TM2 and TCS vacuum pumps are switched off. | I switched off TM2 and TCS vacuum pumps.
The TCS and TM2 will be under vacuum without
pumping. |
|
|
1175
|
Monday, March 21, 2016, 11:30 |
David Wang | Conditioning Station | Repair | TM2 | | TM2 and TCS vacuum pumps are stopped | I stopped TM2 and TCS vacuum pumps. It
will be vented and disconnected this afternoon
for tomorrow moving. |
|
|
1242
|
Tuesday, May 24, 2016, 10:39 |
David Wang | Conditioning Station | Standard Operation | TM2 | Ta#48 | TM2 and TCS turbo-pumps have been switched off this morning. | The TCS and TM2 are still under vacuum
without venting |
|
|
2133
|
Tuesday, August 18, 2020, 09:06 |
David Wang | ITW | Standard Operation | TM2 | | TM2 and ITW entrance module have been disconnected in ITW | Tm2 and itw entrance module have been disconnected
in ITW. I will attach disconnection checklist
later. |
|
|
1052
|
Wednesday, August 26, 2015, 14:30 |
David Wang | Conditioning Station | Standard Operation | TM2 | ZrC | TM2 and Cs vacuum sysyem has been connected at CS. | Turbo-pumps are started . The pumping down
is good so far. |
|
|
1100
|
Wednesday, October 14, 2015, 12:48 |
David Wang | South Hot-Cell | Standard Operation | TM2 | ZrC#7 | TM2 ZrC#7 after run electrical check at SHC. | I did an electrical check on TM2 with ZrC
#7 on it. The EE is short to 60KV bias. See
attachment |
|
|
910
|
Tuesday, May 05, 2015, 10:57 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Wiring | Old wiring was removed yesterday, new wiring
run thru the vacuum chase. Old IMG gauge
removed today, new cable trays installed |
|
|
950
|
Wednesday, June 17, 2015, 14:21 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Waterblock Clean Polish | Fiberglass that fell out yesterday was
put back in place (as well as possible).
Cleaning took place this morning |
|