Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
RH-ISAC
Not logged in
List
Message ID:
1489
Entry time:
Wednesday, April 12, 2017, 07:26
Author:
David Wang
Category:
Conditioning Station
Type:
Standard Operation
Module:
TM2
Target/Number:
Subject:
TM2 and TCS vacuum system has been connected.
Roughing down overnight. Turbo pumps are started this morning. Everything looks good so far.
ELOG V2.9.2-2455