Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1489     Entry time: Wednesday, April 12, 2017, 07:26
Author: David Wang 
Category: Conditioning Station 
Type: Standard Operation 
Module: TM2 
Target/Number:  
Subject: TM2 and TCS vacuum system has been connected. 

Roughing down overnight. Turbo pumps are started this morning. Everything looks good so far.

ELOG V2.9.2-2455