  1588   Monday, July 31, 2017, 09:44 Travis CaveConditioning StationStandard OperationTM3no targetModule move TM#3 has been moved back to the NE
silo from the conditioning station.
  
  1611   Friday, September 08, 2017, 11:20 Travis CaveConditioning StationStandard OperationTM3no targetModule move TM#3 has been moved from the north
east silo to the conditioning station.
  
  1612   Friday, September 08, 2017, 14:08 David WangConditioning StationRepairTM3 TCS and TM3 TM3 is located at TCS and it is pumping
down now. TCS water system has been started. 
All TCS water lines for TM3 module internal
  
  1613   Wednesday, September 13, 2017, 10:05 David WangConditioning StationRepairTM3 Switch off TCS water system and vacuumsPreparing vent the TCS/TM3. We will remove
TM3 service tray cover plate  after
venting.
  
  1614   Wednesday, September 13, 2017, 16:05 David WangConditioning StationRepairTM3 remove Tm3 service tray cover plateTM3 service tray cover plate has been removed.
It is bagged and placed to TH b2 level south
wall beside the silo.
  
  1615   Wednesday, September 13, 2017, 16:13 David WangConditioning StationRepairTM3 TCS turbo pumps are started. TCS and TM3 all vacuum pumps are started.
Everything is fine.
  
  1616   Friday, September 15, 2017, 14:12 Travis CaveConditioning StationStandard OperationTM3no targetModule move TM#3 has been moved back to the silo
from the conditioning station.
  
  1680   Wednesday, January 17, 2018, 13:54 David WangConditioning StationStandard OperationTM3 Start TM3 turbo pumps at TCS. TM3 turbo-pumps are started at TCS. We
will keep pumps running until next Wednesday.
  
  1681   Monday, January 22, 2018, 07:47 David WangConditioning StationStandard OperationTM3 Restarted TM3 vacuum sysytem after site power bumpAll TCS and TM3  vacuum pumps are
started successfully.
  
  1783   Friday, September 14, 2018, 09:39 Travis CaveConditioning StationStandard OperationTM3no targetModule move TM#3 with no target has been moved
from the north east silo to the conditioning
station.
  
  1792   Tuesday, September 25, 2018, 07:54 David WangConditioning StationRepairTM3 TM3 is connected for HV test at TCS.water loops are by passed on top. All bias,
EE, and  EL are tied together. Started
water system.
  
  1795   Wednesday, September 26, 2018, 07:14 David WangConditioning StationRepairTM3 TM3 HV test at TCS.I did a HV test on TM3 at TCS yesterday.
HV Ramp up speed: 1KV per 5 minutes when
below 30KV,1KV per 10 minutes from 30-36KV.
  
  1796   Thursday, September 27, 2018, 13:58 Travis CaveConditioning StationStandard OperationTM3no targetModule move TM#3 has been moved from the conditioning
station to the centre east silo. This will
be its new home after the silo switcher-roo.
  
  1894   Monday, March 18, 2019, 07:25 David WangConditioning StationMaintenanceTM3 TCS vacuum pumps have been stopped. The TCS will be vented soon for TM2
move.
  
  1972   Thursday, August 29, 2019, 12:54 Adam NewsomeSouth Hot-CellStandard OperationTM3 TM3 MoveTM3 has been moved from the Middle-East
silo to the South Hot Cell.
  
  1973   Tuesday, September 03, 2019, 10:48 Adam NewsomeSouth Hot-CellStandard OperationTM3 TM3 MoveTM3 has been moved from the South Hot-Cell
to the Middle-East silo. 
  
  2014   Friday, October 25, 2019, 06:43 David WangSafe Module ParkingDevelopmentTM3 SMP vacuumTM3 was moved into SMP Oct 25 morning. 
After two nights pumping down, SMP CG1 read
30mtorr this morning.  The pump is stopped.
  
  2044   Thursday, January 09, 2020, 13:49 Travis CaveConditioning StationStandard OperationTM3no targetModule move TM#3 has been moved from the south
west silo to the conditioning station.
  
  2045   Thursday, January 09, 2020, 14:14 David WangConditioning StationStandard OperationTM3 Start of TCS roughing pump for TM3.I started TCS roughing pump. TM3 TP1 and
TP2 will be started tomorrow morning. 
  
  2048   Tuesday, January 14, 2020, 10:12 David WangConditioning StationStandard OperationTM3 Helium spray leak check on TCS.Using a long pole with a probe to spray
helium on TCS vacuum seals and joints which
are installed in  TCS service pit. No
  