  1876   Tuesday, February 26, 2019, 08:51 chad fisherSouth Hot-CellRepairTM2 TM2 containment boxThe containment box has been reinstalled
onto TM2 in prepatation for testing in the
conditioning station.
  
  1819   Wednesday, November 07, 2018, 09:50 Anders MjosITWStandard OperationTM2UC#25TM2 connected in ITWTM2 was connected yesterday by Frank and
Anders. The West side panel with IG1S on
Exit Module 2 was replaced with a new SST
  
  1037   Thursday, August 13, 2015, 17:17 David WangConditioning StationRepairTM2Dummy targetTM2 at CSTM2 has been moved to CS. All turbo-pumps
have been started. The pumping down is good
so far.  I connected the leak detector
  
  1040   Wednesday, August 19, 2015, 14:52 David WangConditioning StationRepairTM2 TM2 at CSDuring the TM2 HV test at CS, It failed.
In order to confirm there is no any water
leak inside the module after the heaters
  
  813   Friday, December 05, 2014, 07:47 David WangConditioning StationDevelopmentTM2 TM2 at CSThe pumping down on TM2 at CS was good
overnight. However, the back up line pressure
is still too high for LD to get to 0.0-E-9atm.cc/sec
  
  2186   Wednesday, February 10, 2021, 13:30 David WangSafe Module ParkingStandard Operation  TM2 and TM4 electrical check without targets. TM2 at SMP under vacuum. TM4 at silo. 
Frank and I did the tests. Everything is
fine on TM4 check.  On TM2,  all
 TM2_and_TM4_electrical_check_without_target.pdf 
  1404   Wednesday, November 23, 2016, 16:21 David WangConditioning StationStandard OperationTM2 TM2 and TCS vacuum system has been connected.All vacuum pumps have been started. Air
ballast 50seconds on roughing pump. Everything
is good  so far.
  
  1489   Wednesday, April 12, 2017, 07:26 David WangConditioning StationStandard OperationTM2 TM2 and TCS vacuum system has been connected.Roughing down overnight. Turbo pumps are
started this morning. Everything looks good
so far.
  
  1552   Wednesday, June 07, 2017, 13:34 David WangConditioning StationStandard OperationTM2 TM2 and TCS vacuum system has been connected.I started all turbo pumps.   
  1209   Wednesday, April 13, 2016, 10:46 David WangConditioning StationStandard OperationTM2 TM2 and TCS vacuum system has been connected. TCS is under roughing now.   
  1210   Wednesday, April 13, 2016, 10:46 David WangConditioning StationStandard OperationTM2 TM2 and TCS vacuum system has been connected. TCS is under roughing now.
2016-04-14, Started TCS and TM2 turbo-pumps
yesterday afternoon. Overnight pumping down
  
  1230   Wednesday, May 11, 2016, 13:16 David WangConditioning StationStandard OperationTM2 TM2 and TCS vacuum system has been connected.TM2 and TCS vacuum system has been connected.
I started all turbo pumps. Everything is
good so far.
  
  1727   Wednesday, May 30, 2018, 09:55 David WangConditioning StationRepairTM2 TM2 and TCS vacuum pumps are switched off.I switched off TM2 and TCS vacuum pumps.
The TCS and TM2 will be under vacuum without
pumping.
  
  1175   Monday, March 21, 2016, 11:30 David WangConditioning StationRepairTM2 TM2 and TCS vacuum pumps are stoppedI stopped TM2 and TCS vacuum pumps. It
will be vented and disconnected this afternoon
for tomorrow  moving.   
  
  1242   Tuesday, May 24, 2016, 10:39 David WangConditioning StationStandard OperationTM2Ta#48TM2 and TCS turbo-pumps have been switched off this morning.The TCS and TM2 are still under vacuum
without venting
  
  2133   Tuesday, August 18, 2020, 09:06 David WangITWStandard OperationTM2 TM2 and ITW entrance module have been disconnected in ITWTm2 and itw entrance module have been disconnected
in ITW. I will attach disconnection checklist
later. 
  
  1052   Wednesday, August 26, 2015, 14:30 David WangConditioning StationStandard OperationTM2ZrCTM2 and Cs vacuum sysyem has been connected at CS.Turbo-pumps are started . The pumping down
is good so far.
  
  1100   Wednesday, October 14, 2015, 12:48 David WangSouth Hot-CellStandard OperationTM2ZrC#7TM2 ZrC#7 after run electrical check at SHC.I did an electrical check on TM2 with ZrC
#7 on it. The EE is short to 60KV bias. See
attachment
 ZrC_#7_after_run_electrical_check.pdf 
  910   Tuesday, May 05, 2015, 10:57 chad fisherSouth Hot-CellRepairTM2 TM2 WiringOld wiring was removed yesterday, new wiring
run thru the vacuum chase. Old IMG gauge
removed today, new cable trays installed
 TM2_New_Wiring_20150504_13.jpgTM2_Wiring_20150505_10.jpg 
  950   Wednesday, June 17, 2015, 14:21 chad fisherSouth Hot-CellRepairTM2 TM2 Waterblock Clean PolishFiberglass that fell out yesterday was
put back in place (as well as possible).
Cleaning took place this morning
 20150617_080236_1.jpg20150617_081538_1.jpg20150617_083830.jpg 