  2101   Thursday, June 11, 2020, 12:36 David WangSafe Module ParkingRepairTM3 TM3 containment box and service tray field measurement.
At 15cm distance: Containment box window 21msv maximum. Service tray 8.0msv maximum.
At 0.5 meter distance 360degree rotation: containment box high 10msv, low 4.3msv.
Maximum 170 to 180 counts(44-2) on swipes taking from service cap inside.
0 to 20 counts(44-2) on air sample at 0.5 meter to containment box window panel.
80 counts(44-2) on air sample taking from service cap inside.  The contamination level in service cap is low.

 

  1745   Friday, June 29, 2018, 10:15 chad fisherSouth Hot-CellStandard OperationTM2 TM2 work and target install

On Thursday, June 29th the containment box of TM2 was removed and the optics tray re-installed and reconnected. The box was then re-installed.

Friday the window waterlines were leak checked, Nb target installed (with new fasteners, high current torqued to 130 in*lbs) target leak and electrical checked and containment box cover installed with new fasteners.

  2253   Monday, October 04, 2021, 09:33 Frank SongNorth Hot-CellStandard OperationTM2C#3TM2 with target connection test

 the test was done when TM2 sit on NHC.

Attachment 1: IMG_3710.jpg
IMG_3710.jpg
  2402   Monday, January 09, 2023, 14:19 Frank SongITWStandard OperationTM2UCx#40TM2 with UCx40 disconnection in ITW

 TM2 with target UCx40 was disconnected in ITW and moved to NHC.

Attachment 1: TM2_with_UCx40_disconnection_in_ITW.png
TM2_with_UCx40_disconnection_in_ITW.png
  2658   Tuesday, August 13, 2024, 14:23 David WangITEStandard OperationTM3Ta#67.TM2 with Ta#target has been moved from SHC to ITE.

TM2 with Ta#target has been moved from SHC to ITE. the move is smooth.

  2346   Tuesday, July 19, 2022, 11:47 Frank SongITWStandard OperationTM2SiC#43 FebiadTM2 with SiC#43 disconnected in ITW

 the module was disconnected in pit and moved to NHC.

Attachment 1: TM2_with_SiC43_disconnection_in_ITW.jpg
TM2_with_SiC43_disconnection_in_ITW.jpg
  1789   Friday, September 21, 2018, 10:07 David WangITWStandard OperationTM2SiC nanoTM2 with SiC nano target was has been connected in ITW.

Tm2 with SiC nano has been connected in ITW. See attachment for checklist

Attachment 1: TM2_with_SiC_nano_connection_in_ITW..pdf
TM2_with_SiC_nano_connection_in_ITW..pdf TM2_with_SiC_nano_connection_in_ITW..pdf TM2_with_SiC_nano_connection_in_ITW..pdf
  1893   Monday, March 18, 2019, 07:23 David WangConditioning StationRepairTM2 TM2 window line helium test

New seals with a blank off cap are installed on TM2 window line water block.   The seals are checked at TCS with 70 psi helium for 5 minutes with LD at 0.0xE-9atm/cc.sec. No response on LD during test. Seals are good.

  1726   Wednesday, May 30, 2018, 09:51 David WangConditioning StationRepairTM2 TM2 water lines helium pressure test at TCS.

I did a helium pressure test on TM2 water lines at TCS. We will remove the TM2 source tray soon so this test is a reference check for future new source. The result:

Helium 70 psi, 2 minutes to each circiut. Leak detector  base LR.0.0x e-9atm.cc/sec, base pressure  0.0x e-4torr

Ta+(A)  0.0x e-9atm.cc/sec

Ta-(B)  0.0x e-9atm.cc/sec

Tu-(C) 7.8x e-7 atm.cc/sec

Tu+(D) 3.5x e-7 atm.cc/sec

Coil 2(PU) 0.0x e-9atm.cc/sec

Coil 1(RU) 0.0x e-9atm.cc/sec

EE 8.2 x e-9atm.cc/sec

MSP 0.0x e-9atm.cc/sec

Containment box window  0.0 xe-9atm.cc/sec

HS  no target and opened. No test.

All water lines on module side in TM2  should be in good condition according to this test . The leak response we found on B and C lines are from water block seals mostly.           

  1863   Monday, January 28, 2019, 10:41 David WangConditioning StationRepairTM2 TM2 water lines helium pressure test at TCS

leak detector base LR: 0.0Xe-9atm.cc/sec. helium 70 psi. test time : 3 minutes for each circuit.The results in atm.cc/sec are Ta+(A):1.8  XE-8. TA-(B):0.0xE-9. Tu-(C):1.2XE-7. TU+(D):1.6XE-7. Coil 2 (PQ):0.0XE-9. Coil 1 (RU):0.0XE-9. MSP:2.2XE-7. EE:1.0XE-7. HS:N/A. Window:5.8XE-9

  1211   Thursday, April 14, 2016, 09:46 Anders MjosConditioning StationStandard OperationTM2 TM2 water leak test

 Thursday, April 14, 2016, 07:50: RGA on


Friday, April 15, 2016, 08:09 : Ratio between water and air is higher than normal (indicating possible air leak). See attachment. 3.5 more H2O than N2.  (Ratio in TM3 Nov 2015 was 82:1)


 

A leak was found on the o-ring between the module flange and TCS. This could be fixed by cleaning the o-ring and sealing surface. The Window line is not closed and was accidentally pressurized with He on April 25


Tuesday, April 26, 2016, 08:47: David started the water package.


Wednesday, April 27, 2016, 08:15: Switched off chiller / water cooling.

Wednesday, April 27, 2016, 14:41: Switched chiller / water cooling back on.

Attachment 1: 2016-04-15_RGA.png
2016-04-15_RGA.png
  2603   Thursday, May 30, 2024, 11:08 David WangConditioning StationStandard OperationTM2 TM2 was moved from silo to TCS yesterday morning.

TM2 was moved from silo to TCS yesterday morning. The move is smooth.    TCS vacuum system was started after. TCS and TM2 pumping down is ok so far.

  2079   Friday, March 06, 2020, 09:51 David WangSouth Hot-CellStandard OperationTM2 TM2 was moved from SHC to SMP yesterday.

TM2 was moved from SHC to SMP yesterday.  The move is successful. TM2 is located at SMP. There is no hot target on module so SMP vacuum is not started.

  1427   Tuesday, January 24, 2017, 15:32 David WangITWStandard OperationTM2 TM2 was moved from ITW to SHC this morning.

The move is smooth. Yasmine and Travis did the move.

  1590   Wednesday, August 02, 2017, 15:09 David WangITWStandard OperationTM2 TM2 was disconnencted in ITW yesterday.

Tm2 was disconnected in ITW yesterday. ITW EL cable crimp ring was broken. John Chow replaced this ring this afternoon.

  1788   Friday, September 21, 2018, 10:06 David WangITWStandard OperationTM2UCx23TM2 was disconnected in ITW.

TM2 was disconnected in ITW this Tuesday. See attachment for checklist.

Attachment 1: TM2_UCx_23#_disconnection_in_ITW..pdf
TM2_UCx_23#_disconnection_in_ITW..pdf TM2_UCx_23#_disconnection_in_ITW..pdf
  1806   Tuesday, October 23, 2018, 10:45 David WangITWStandard OperationTM2SiC nanoTM2 was disconnected in ITW.

TM2(SiC nano) has been disconnected in ITW. See attachment

Attachment 1: TM2_SiC_nano_disconnection_in_ITW.pdf
TM2_SiC_nano_disconnection_in_ITW.pdf TM2_SiC_nano_disconnection_in_ITW.pdf
  1331   Wednesday, August 24, 2016, 10:41 David WangITWStandard OperationTM2 TM2 was disconnected in ITW yesterday.

TM2 was disconnected in ITW yesterday and moved to SHC.

  1370   Wednesday, October 12, 2016, 10:00 David WangITWStandard OperationTM2 TM2 was disconnected at ITW

TM2 was disconnected at ITW. 3 water circuits in ITW gave been looped to keep 75 GPM water flow to ITW. HS line was purged at HS. RPG got the water sample.

  1041   Thursday, August 20, 2015, 09:38 David WangConditioning StationRepairTM2 TM2 was disconnected at CS

TM2 was disconnected at CS. Travis and I did  electrical check before the venting. After,The module was vented and moved to SHC. The moving is smooth.