Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1975     Entry time: Wednesday, September 04, 2019, 13:53
Author: chad fisher 
Category: South Hot-Cell 
Type: Repair 
Module: TM4 
Target/Number:  
Subject: TM3 CB to TM4 

The TM3 containment box has been installed onto TM4. No issues, leak checked ok.

 

ELOG V2.9.2-2455