|
ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
|
1978
|
Thursday, September 05, 2019, 14:26 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#27 | Electrical Check |
The results of the electrical check of TM#4 with UC#27 attached to it. |
Attachment 1: TM4_elec_chk_with_UC27_at_SHC_Sept_5_2019.pdf
|
|
|
1979
|
Thursday, September 05, 2019, 14:26 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#27 | Electrical Check |
The results of the electrical check of TM#4 with UC#27 attached to it. |
Attachment 1: TM4_elec_chk_with_UC27_at_SHC_Sept_5_2019.pdf
|
|
|
1991
|
Monday, September 30, 2019, 11:36 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | ZrC#8 | Module move |
TM#2 with ZrC#8 has been moved from the east station to the south hot cell. |
|
1992
|
Monday, September 30, 2019, 14:05 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | ZrC#8 | Electrical Check |
Results of the electrical check on TM#2 with ZrC#8 post beam. |
Attachment 1: TM2_elec_chk_ZrC8_post_beam_SHC_09-30-2019.pdf
|
|
|
1994
|
Tuesday, October 01, 2019, 10:22 |
chad fisher | South Hot-Cell | Standard Operation | TM2 | ZrC#8 | ZrC#8 Removed Ta#59 installed |
ZrC#8 has been removed from TM2. Upon removal of the high current tube heater bolts it was noticed that the tube was broken. Also the 9 pin connector has an arc mark (see pictures attached).
Ta#59 has been installed with new fasteners. High current fasteners torqued to 130 in lbs. |
Attachment 1: 20190930_140918[1].jpg
|
|
|
1995
|
Tuesday, October 01, 2019, 14:38 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Ta#59 | Electrical Check |
The results of the electrical check on TM#2 with the Ta#59 target and without before the target was mounted on the module. |
Attachment 1: TM2_no_target_SHC_elec_chk_Oct-1-2019.pdf
|
|
Attachment 2: TM2_Ta59_SHC_elec_chk_Oct-1-2019.pdf
|
|
|
1997
|
Wednesday, October 02, 2019, 08:25 |
chad fisher | South Hot-Cell | Standard Operation | | ZrC#8 | ZrC#8 PIE |
Heat shield has been removed from ZrC#8. |
Attachment 1: 20191002_081653[1].jpg
|
|
|
1999
|
Friday, October 04, 2019, 14:53 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#28 | Module move |
TM#4 with UC#28 has been moved from the south hot cell to the west target station. |
|
2001
|
Friday, October 04, 2019, 16:50 |
David Wang | South Hot-Cell | Standard Operation | TM4 | | UCx 28 target with TM4 SHC leak check and electrical check. |
TM4 HS Leak check result is good . No leak. electrical check after target installation: Bias to chassis 550 Mohm. Coils are shorted each other and shorted to 60 KV bias. ABCD to 60KV bias 500V Megga measurement are 100M at least which is good. EE to bias are OL at 500V. The electrical check result is good. |
|
2004
|
Tuesday, October 08, 2019, 09:02 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#27 and UC#28 | Electrical Check |
Results of the electrical check of TM4 without target and with UC27 and 28 |
Attachment 1: TM_elec_chk_with_UC27_shc_post_beem_Oct-04-2019.pdf
|
|
Attachment 2: TM4_elec_chk__with_UC28_shc_Oct-04-2019.pdf
|
|
Attachment 3: TM4_elec_chk_no_tgt_shc_Oct-04-2019.pdf
|
|
|
2009
|
Tuesday, October 22, 2019, 11:19 |
Adam Newsome | South Hot-Cell | Standard Operation | TM4 | UC# 28 | TM4 Move |
TM4 with UC# 28 target has been moved from ITW to the South Hot Cell. Shield plug installed in ITW. |
|
2012
|
Wednesday, October 23, 2019, 07:58 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | UCx#28 | UCx#28 Removed |
UCx#28 has been removed from TM4. Guard screws on 5(10) pin connector had to be removed to get the connector to un-seat properly for removal. |
|
2021
|
Tuesday, November 05, 2019, 10:19 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Ta#59 | Module move |
TM#2 with Ta#59 has been moved from the ITE to the south hot cell. |
|
2023
|
Tuesday, November 05, 2019, 12:46 |
chad fisher | South Hot-Cell | Standard Operation | TM2 | ta#59 | Ta#59 removed |
Ta#59 has been removed from TM2 and it is now ready for electrical check. |
|
2024
|
Tuesday, November 05, 2019, 14:27 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Ta#59 | Electrical Check |
Results of the electrical check of TM#2 with the old Ta#59 target and target free. |
Attachment 1: Elec_Chk_TM2_with_Ta59_post_beam_SHC_Nov_05_2019.pdf
|
|
Attachment 2: Elec_Chk_TM2_SHC_no_target_Nov_5_2019.pdf
|
|
|
2031
|
Tuesday, November 26, 2019, 10:24 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | SiC#38 | Module move |
TM#2 with SiC#38 has been moved from ITE to the south hot cell. |
|
2033
|
Friday, November 29, 2019, 11:02 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | SiC#38 SiC#39 | Electrical Check |
Results from the electrical check with the old SiC#38 target and the new SiC#39. |
Attachment 1: Elec_chk_SiC#38_SHC_post_beam_TM2_11-26-2019.pdf
|
|
Attachment 2: Elec_chk_SiC#39_SHC_TM2_11-29-2019.pdf
|
|
|
2034
|
Friday, November 29, 2019, 11:03 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | SiC#39 | Module move |
TM#2 with the SiC#39 target has been moved from the south hot cell to the east target station. |
|
2058
|
Tuesday, February 04, 2020, 14:22 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#29 | Module move |
TM#4 with UC#29 has been moved from the west target station to the south hot cell. |
|
2059
|
Wednesday, February 05, 2020, 08:22 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | UCx#29 | UCx#29 removed |
UCx#29 has been removed from TM$ and placed in a pail backfilled with argon until it can be moved to the storage vault. |