ID Date Author Category Type Module Target/Number Subject
  1848   Tuesday, January 08, 2019, 08:49 David WangITWStandard OperationTM2 TP1 TP1 have been disconnected in ITW

Started argon venting of ITW now.

  1847   Friday, January 04, 2019, 14:38 Isaac EarleNorth Hot-CellDevelopment  NHC cameras tested

The NHC module support flange cameras (4 total) as well as the NHCSA camera were tested today and confirmed to be working properly.  All cameras were angled and focused properly, and displaying clearly on the monitors in the ISAC RH Control Room.  Photos of the control room monitors are attached below.

 

NHC_flange_East_and_West_views.JPG

 

NHC_flange_North_and_South_views.JPG

 

 Camera_view_through_operator_viewing_window.JPG

  1846   Friday, January 04, 2019, 08:48 David WangITWStandard OperationTM2 TM2 has been disconnected in ITW.

TP1, TP2 are still connected for next week leak check. All water lines in TM2 are purged with 80 psi air, each for 5 minutes.

TP1 and TP2 had been disconnected. TM2 with UCx 25  disconnection checklist, See attachment.

Attachment 1: UCx25_TM2_disconnection_checklist.pdf
UCx25_TM2_disconnection_checklist.pdf UCx25_TM2_disconnection_checklist.pdf
  1845   Thursday, January 03, 2019, 13:41 David WangCraneRepair  Target hall crane PLC issue.

Target hall crane did not work properly after power outage during Christmas time. The only movement could be operated is crane rotation. Power is supplied crane. The control board on N-S, E-W and up-down movement showed  F51 error code which is tripped limit.. All these clues pointed to a PLC control problem.  Don dale was asked for help. He used the crane control PLC program on an old computer  in RH control room reset the PLC system. Everything works fine after his reset.

  1844   Thursday, January 03, 2019, 13:30 David WangITWRepair  ITH:MP1

ITH:MP1 inlet pressure showed 10torr after power outage during holiday. All ITE/W turbo-pumps were tripped because of it. Removed one shielding block above the vacuum station. Visually checked oil level  and condition in pump. oil level is high. oil color is dark. no oil  leak .  Installed a local convectron gauge on pump inlet. After pumping down, It shows pump is good.  Tightened  all KF 25 and 50 clamps on pump inlet side. Reconnected pump to system. Everything works fine so far. All ITW / E turbo pumps are started now.

  1843   Wednesday, January 02, 2019, 10:26 Anders MjosConditioning StationStandard Operation  Restarrted TP1S

Found pumps off after the holidays. Restarted roughing pump and TP1S

  1842   Wednesday, December 19, 2018, 14:41 Anders MjosConditioning StationStandard Operation No targetInstalled Shield Block on TCS

Frank and Anders installed lid on TCS and started vacuum system yesterday. To run over the Holidays. Retrieved dose badge from operational storage area. Measured field to be ~ 10 mSv/h at ~9am. Beam went off about 8:30am.

  1841   Tuesday, December 18, 2018, 11:13 Isaac EarleNorth Hot-CellDevelopment  NHC manipulator slave-end swap, RH test, and various other work

The following North Hot Cell work was completed over the last week under work permit I2018-12-12-1:


 

Thurs Dec 13th:

  • Prepared master side according to removal manual (noticed screwing in the right side locking screw was not as smooth to go in as normal; left side was smooth like normal)
  • Removed manipulator roof block and set down in yellow frame (required some stacked wood to prevent light from bottoming out)
  • Removed steel side plates in NHC manipulator hatch
  • Removed the slave end (SN: 9764) – noticed “Right Elevation/Twist Coupler” off of vertical by around 30 degrees
  • Wrist elevation of removed slave end was not locked, lifted it slightly and this brought the coupler to the vertical position and it locked with a click
  • Suspected the thru-tube also would be misaligned, confirmed by inspecting visually in hot cell (Unsure why this misalignment occurred considering we followed the removal procedure properly.  One theory is that when we accidentally left the timing screw in the master side handle cable drum last time it may have caused things to get a little out of alignment)

 

Friday Dec 14th:

  • Un-did the right side locking screw on the master
  • Then could turn coupler on the thru-tube to the vertical position from within the hot cell
  • Re-locked the right side locking screw (this time it went in smoothly)
  • With all couplers on thru-tube vertical we then installed the replacement slave (SN: 9352) as per instructions
  • For future slave end changes should use some sort of long chain or sling instead of having the auxiliary crane hook block within the hatch (some sort of T-hook type lift feature replacing the bail may work better as well)
  • Evaluated the manipulator: seemed to be working normally, Chad tested plugged in LED lamp plug and also opened and closed the work table hatch
  • Noticed Z motion tape on slave end loose when fully extended in Z (nice and tight when retracted) – this seems to be normal
  • Confirmed manipulators can reach all surfaces of the table
  • Then tested remote handling of LED light fixtures from the Target Hall using pole tools through the manipulator roof hatch
    • Started with both LED light plugs un-plugged
    • Used 9’ standard beam lines RH pole tool (this worked fine, but 10-12’ would be better)
    • Curved hook end attachment
    • First lifted cables out of all cable tray sections (the wall mounted Panduit)
    • Then removed the East light fixture assembly (IRH1800) - lifted from designated lift loop (IRH1796) – This went smoothly
    • Hoisted up into the Target Hall, then lowered back down to re-install
    • To reinstall had to hook the assembly at a lower point due to flex of the pole from the weight of the assembly (hooked just below the ballast for installation).  Using this method reinstalling the fixture went smoothly.  I will update the design to move the designated lift point (or add an additional one) at this location.
    • Once the light fixture was on the bracket, replaced the cables in the cable tray using the pole tool.  The final section on the east wall before the outlets was a little tricky, but by viewing and reaching from the north-west corner of the hatch it was do-able
    • Confirmed visually that remote removal and installation of the west fixture can be done using the same procedure as the east
  • Replaced lamp block (stored lifting hardware for hatch side plates above block, below hatch cover)

  

Monday Dec 17th:

  • Left side slave-end boot was installed as per manual instructions.  It was done with two people inside the cell this time which went much smoother than just one last time (the boot was not installed on the slave prior to moving it into the hot cell because we wanted to inspect the tape and cables after installation and the boot would prevent that)
  • The condition of both boots was checked. Both appear to be in new condition with no signs of degradation.  The material seems pliable and strong.
  • Chad Fisher, ISAC Hot Cell Operator, checked the light level from the cold side of the hot cell and confirmed that it is acceptable.  However, without the operator level LED lighting it was too dim.

 

 Tuesday Dec 18th:

  • Lift bails for both manipulator slave ends set to farthest north position which results in face that mates with thru-tube to be close to vertical when hanging from lift bail
  • Work table, stairs, entrance floor area, pre-filter assembly, tool port, window cover, and hot side service connection panel vacuumed and wet wiped to remove dirt and dust.
  • NHC inlet damper (located in Target Hall) adjusted to set NHC depression to around 1.05”wc (the NHC damper is currently not responding to the NVCS and needs to be investigated and repaired by Controls Group and/or Mechanical Services)

 

  1840   Tuesday, December 11, 2018, 14:35 Anders MjosITEStandard OperationTM4UC#26Block move

Blocks were moved from ITW to ITE by Frank and David. ITE water flow to dump was re-opened (ITW remains open). A dose badge was installed in the operation storage area. Dose rates were measured to ~10 mSv/h at 1pm. Beam went off approximately 8:30am (with a short period of 2uA ending at 11am).

  1839   Monday, December 10, 2018, 15:31 Isaac EarleNorth Hot-CellDevelopment  NHC remote connection testing with manipulators

 The following tests have been successfully completed using the NHC manipulators:

  • Ventilation pre-filter (mounted on the NHC/TCS partition wall) removed and re-installed using the manipulators
  • Electrical plugs (two total) for operator-level LED lighting located on east wall of cell interior plugged in, and un-plugged using the manipulators
  • Electrical plug inserted into and removed from each of the 120V outlets (four total) located in front of the viewing window using the manipulators
  • All diagnostic service connections removed and reinstalled using the manipulators (six total, see IRH1765)
  • All Staubli air and gas connections removed and reinstalled using the manipulators (five total, see IRH1749)

 

These tests were performed at various different times over the last several months by Isaac Earle and/or Chad Fisher.

  1838   Friday, December 07, 2018, 10:37 chad fisherNorth Hot-CellRepair  Ariel connector test

Completed testing of connectors for Ariel using the north hot cell.

Video can be found on docushare; document 161909

  1837   Friday, December 07, 2018, 08:47 chad fisherNorth Hot-CellRepair  North hot cell spare slave repair

The tong cable on the spare north hot cell slave has been repaired. Slave came from the factory with the tong cables straddling one of the pulleys they are suppose to run through.

 

 

Attachment 1: 20181207_083906.jpg
20181207_083906.jpg
  1836   Tuesday, December 04, 2018, 12:36 David WangITEStandard OperationTM4UCx 26.TM4 has been connected in ITE/ Checklist.

TM4 has been connected in ITE. See attachment for connection checklist

Attachment 1: UCx26_TM4_connection_checklist.pdf
UCx26_TM4_connection_checklist.pdf UCx26_TM4_connection_checklist.pdf UCx26_TM4_connection_checklist.pdf
  1835   Tuesday, December 04, 2018, 10:26 Travis CaveITEStandard OperationTM4UC#26Module move

 TM#4 with UC#26 has been moved from the conditioning station to the east target station.

  1834   Friday, November 30, 2018, 10:28 Travis CaveSpent Target VaultStandard Operation Ta#57Spent Target Move

 The spent Ta#57 target has been moved from the south hot cell to the spent target storage it was placed in pail 174 and placed in spot 8C in the vault. See attached PDF for details.

Attachment 1: Target_Index_2018-11-30.pdf
Target_Index_2018-11-30.pdf Target_Index_2018-11-30.pdf
  1833   Thursday, November 29, 2018, 06:38 David WangSouth Hot-CellStandard OperationTM4 Leak check TM4 UCx 26 at SHC.

Chad and I did a leak check on TM4 HS line with UCx 26# installed . Base LR 0.0X E-9 atm.cc/sec. Base pressure 0.0XE-4 torr.  No response on leak detector during leak check.

  1832   Wednesday, November 28, 2018, 13:38 Travis CaveConditioning StationStandard OperationTM4UC#26Module move

 TM#4 with UC#26 has been moved from the south hot cell to the conditioning station.

  1831   Wednesday, November 28, 2018, 11:31 Travis CaveSouth Hot-CellStandard OperationTM4Ta#57 and UC#26Electrical Check

 Electrical check of TM#4 with the old Ta#57, no target and with new IG-LIS UC#26 target. See attached PDF for details.

Attachment 1: Elec_Chk_Ta57_Post_Beam_SHC_11-28-28.pdf
Elec_Chk_Ta57_Post_Beam_SHC_11-28-28.pdf
Attachment 2: Elec_Chk_TM4_no_tgt_SHC_11-28-18.pdf
Elec_Chk_TM4_no_tgt_SHC_11-28-18.pdf
Attachment 3: Elec_Chk_UC26_SHC_11-28-18.pdf
Elec_Chk_UC26_SHC_11-28-18.pdf
Attachment 4: Elec_Chk_UC26_IGLIS_part_SHC_11-28-18.pdf
Elec_Chk_UC26_IGLIS_part_SHC_11-28-18.pdf
  1830   Wednesday, November 28, 2018, 07:04 David WangITEDevelopmentTM4LpTa 56New high current flexible cables inspection after LpTa#56 beam run.

Inspected new high current flexible cables during TM4 disconnection. The new cables and adapters work fine.

Attachment 1: new_flexibble_cable_in_ITE_after_Ta#56_run_001.JPG
new_flexibble_cable_in_ITE_after_Ta#56_run_001.JPG
Attachment 2: new_flexibble_cable_in_ITE_after_Ta#56_run_004.JPG
new_flexibble_cable_in_ITE_after_Ta#56_run_004.JPG
  1829   Wednesday, November 28, 2018, 06:39 David WangConditioning StationStandard Operation  Disconnection checklist LpTa #56

TM4 was disconnected in ITE. Checklist list in attachment.

Attachment 1: LpTa#56_disconnection_checklist.pdf