  ID Date Author Category Type Module Target/Number Subjectdown Text Attachments
  2509   Wednesday, December 13, 2023, 11:42 Adam NewsomeSouth Hot-CellStandard OperationTM3 TM3 Move - TCS TO SHCTM3 has been moved from the target conditioning
station to the south hot cell. 
  
  2507   Tuesday, November 28, 2023, 12:58 Adam NewsomeSouth Hot-CellStandard OperationTM3 TM3 Move - Silo to SHCTM3 was moved from the Silo to South Hot
Cell. 
  
  2510   Friday, December 15, 2023, 11:07 Adam NewsomeConditioning StationStandard OperationTM3 TM3 Move - SHC to TCSTM3 was moved from the SHC to the TCS (no
target installed). 
  
  2551   Friday, March 15, 2024, 10:04 Adam NewsomeSouth Hot-CellStandard OperationTM3 TM3 Move - SHC to NE SiloTM3 was moved from SHC to NE silo. Cable
tray was recently installed. 
  
  1972   Thursday, August 29, 2019, 12:54 Adam NewsomeSouth Hot-CellStandard OperationTM3 TM3 MoveTM3 has been moved from the Middle-East
silo to the South Hot Cell.
  
  1973   Tuesday, September 03, 2019, 10:48 Adam NewsomeSouth Hot-CellStandard OperationTM3 TM3 MoveTM3 has been moved from the South Hot-Cell
to the Middle-East silo. 
  
  2171   Monday, December 07, 2020, 12:20 Adam NewsomeConditioning StationDevelopmentTM3 TM3 MoveTM3 has been moved from
the South Hot Cell to the
Conditioning Station. No containment box.
  
  2172   Thursday, December 10, 2020, 15:07 Adam NewsomeSouth Hot-CellDevelopmentTM3 TM3 MoveTM3 was remotely moved from the conditioning
station to the South Hot Cell. No containment
box.
  
  2175   Monday, January 04, 2021, 12:13 Adam NewsomeConditioning StationDevelopmentTM3 TM3 MoveTM3 was remotely moved from the
South Hot Cell to the conditioning station.
No containment box.
  
  1514   Sunday, April 30, 2017, 20:57 Aurelia LaxdalSouth Hot-CellRepairTM3no targetTM3 May 1-15, 2017 Tentative Schedule at the SHC and TCSPlease see attachment for TM3 May 1-15,
2017 Tentative Schedule at the SHC and TCS.
 May_2107_TM3_Schedule_at_the_South_Hot_Cell_and_TCS.docx 
  1494   Thursday, April 13, 2017, 10:32 chad fisherSouth Hot-CellRepairTM3 TM3 Lower Service Tray Video InspectionA video inspection of the lower service
tray was performed this morning. Camera was
inserted upwards into the service tray/service
  
  1508   Wednesday, April 26, 2017, 16:52 Aurelia LaxdalSouth Hot-CellRepairTM3 TM3 Lower Service Tray Video Inspection


   
        
            
 FiberGlassInST.tiff 
  1493   Wednesday, April 12, 2017, 16:39 Aurelia LaxdalSouth Hot-CellRepairTM3no targetTM3 Inspection at the South Hot CellFound spark signs on TM3's containment
on the side of the water blocks. They may
be OLD or/and NEW sparking signs, but this
 DSC_0886.JPGDSC_0883.JPG 
  1520   Tuesday, May 02, 2017, 18:33 Aurelia LaxdalSouth Hot-CellRepairTM3no targetTM3 HV tests at atmosphere for Each Line(s) after the Fiber Glass removal May 2, 2017Today a HV test at atmosphere was performed
for Each Line(s), while floating the other
lines. THIS TEST AT ATMOSPHERE IS THE FIRST
  
  1512   Thursday, April 27, 2017, 19:59 Aurelia LaxdalSouth Hot-CellRepairTM3no targetTM3 HV tests at atmosphere for Each Line(s) April 27, 2017Today a HV test at atmosphere was performed
for Each Line(s), while floating the other
lines.
  
  1509   Wednesday, April 26, 2017, 17:37 Aurelia LaxdalSouth Hot-CellRepairTM3no targetTM3 HV tests at atmosphere Pictures from April 19-21, 2017
Please see the first two pictures
of the HV test at atmosphere done on April
 DSC_0950.JPGDSC_0899.JPGSparkMarkEETM3.jpg 
  1795   Wednesday, September 26, 2018, 07:14 David WangConditioning StationRepairTM3 TM3 HV test at TCS.I did a HV test on TM3 at TCS yesterday.
HV Ramp up speed: 1KV per 5 minutes when
below 30KV,1KV per 10 minutes from 30-36KV.
  
  1525   Friday, May 05, 2017, 19:36 Aurelia LaxdalConditioning StationRepairTM3no targetTM3 HV test at TCS up to 65kVToday TM3 HV conditioning went up to 65kV.
I'll leave it here over night. ISAC OPS have
instructions to keep an alarm on the HV,
  
  1522   Thursday, May 04, 2017, 19:10 Aurelia LaxdalConditioning StationRepairTM3no targetTM3 HV test at TCS up to 50kVToday TM3 was conditioned up to 50kV. At
50kV sparking started and to go higher in
voltage it needs more conditioning time.
  
  1975   Wednesday, September 04, 2019, 13:53 chad fisherSouth Hot-CellRepairTM4 TM3 CB to TM4The TM3 containment box has been installed
onto TM4. No issues, leak checked ok.
 
  