ID Date Author Category Type Moduledown Target/Number Subject Text Attachments
  655   Monday, May 05, 2014, 13:05 David WangITERepairTM3 ITE target module flange seal has been replaced.ITE target module flange seal has been
replaced.The flan surface and the o-ring
groove have been cleaned with Acetone before
 004.JPG008.JPG008.JPG007.JPG 
  656   Monday, May 05, 2014, 13:11 David WangITERepairTM3  ITE Entrance module has been disconnected.ITE entrance module has been disconnected
and the lifting yoke is installed for module
move. See attached pictures.
 011.JPG025.JPG033.JPG035.JPG032.JPG 
  658   Wednesday, May 07, 2014, 10:08 David WangITERepairTM3 ITE entrance module flange seal had been replaced.ITE entrance module flange seal had been
replaced yesterday.The flange and the seal
groove were cleaned with Acetone before the
 7x 
  659   Wednesday, May 07, 2014, 10:15 David WangITERepairTM3 ITE TM3, entrance module and BL2A3 window flange seals leak check..ITE TM3, entrance module, and 2A3 window
flange seals have been leak checked this
morning after 2 new seals replacement.The
  
  660   Wednesday, May 14, 2014, 19:01 Grant MinorITEMaintenanceTM3 HV short inspection at ITEFriedhelm Ames commented to me that there
appears to be a short between High Voltage
and Ground at TM3 at ITE.
  
  661   Thursday, May 15, 2014, 14:38 David WangITERepairTM3TM3Bias short on ITEAnders and I opened the HV cover in ITE
and did  a visual check inside ITE HV 
cover and top of TM3.Bill was with us and
  
  684   Tuesday, June 24, 2014, 11:12 Travis CaveSouth Hot-CellStandard OperationTM3TiC#4module moveTM#4 with TiC#4 has been moved from the
east target station to the south hot cell.
  
  686   Tuesday, June 24, 2014, 11:58 Travis CaveSouth Hot-CellStandard OperationTM3TiC#4Electrical checkElectrical check of the TiC#4 on TM#3 post
beam at the south hot cell, see attached
PDF for details
 TM3_TiC4_elec_chk_SHC_postbeam.PDF 
  687   Tuesday, June 24, 2014, 15:14 Anders MjosSouth Hot-CellStandard OperationTM3TiC#4Conductor insulator broken close to right TGHT terminalWhen the Containment Box was opened today
by Chad for a target change, we found the
conductor insulator block B (ITD0054) to
 TiC#4_Broken_Insulator.pdf 
  688   Tuesday, June 24, 2014, 15:45 Anders MjosSouth Hot-CellStandard OperationTM3TiC#4Ground Electrode and Extraction Electrode dirty after last runSee attached pdf and DocuShare for
more photos. It may be possible to clean
some of it from the Ground Electrode.
 TiC#4_Dirty_GND_and_EE_electrodes.pdf 
  689   Wednesday, June 25, 2014, 12:49 Anders MjosSouth Hot-CellStandard OperationTM3TiC#4Conductor insulator broken close to right TGHT terminal

    

       
            
 ITD0052C_revB.pdf 
  690   Wednesday, June 25, 2014, 12:55 Anders MjosSouth Hot-CellStandard OperationTM3TiC#4Object - possibly cable tie found in Containment Box See attached PDF. The object is not
accessible with only the front panel removed.
Photos on DocuShare.
 TiC#4_Cable_Tie.pdf 
  691   Wednesday, June 25, 2014, 13:46 Travis CaveSouth Hot-CellRepairTM3no targetElectrical checkElectrical check of TM#3 after the insulator
repair. See attached PDF for details.
 TM3electestsinsulrepair.PDF 
  692   Thursday, June 26, 2014, 10:57 David WangSouth Hot-CellStandard OperationTM3 Leak check on TM3 HS water line with new target. installed.Chad and I leak checked the TM3 HS water
line with new target installed.  No
leak has been found during the check. Leak
  
  693   Thursday, June 26, 2014, 11:15 Travis CaveSouth Hot-CellStandard OperationTM3SiC#30Electrical checkElectrical check of the TM#3 with SiC#30
attached. Also an electrical check of TM#3
after the cleaning of ground electrode with
 TM3_SiC30_elecSHC.PDFTM3_elecchkaftclean.PDF 
  694   Thursday, June 26, 2014, 14:18 Travis CaveConditioning StationStandard OperationTM3SiC#30module moveTM#3 with SiC#30 has been moved from the
south hot cell to the conditioning station.
  
  695   Friday, June 27, 2014, 10:16 David WangConditioning StationStandard OperationTM3  TM3 HS water lines helium pressure test. at CSTM3 HS water line helium pressure test
is done at CS. 70 psi helium , 3 minutes.Base
LR 0.0xE-9 atm.cc/sec, base pressure 0.0xE-4
  
  696   Friday, June 27, 2014, 11:26 Anders MjosSouth Hot-CellStandard OperationTM3 Ground Electrode Cleaned

    

       
            
 TM3_GND_Electrode_Cleaning.pdf 
  697   Wednesday, July 02, 2014, 09:02 Travis CaveITEStandard OperationTM3SiC#30module moveTM#3 with SiC#30 has been moved from the
conditioning station to the east target station.
  
  699   Monday, July 07, 2014, 14:45 Grant MinorITEMaintenanceTM3SiC #30FEBIAD gas line checkThere were some problems this morning with
provision of FEBIAD gas to the the target
at ITE.  It was suspected that the gas
 ITE_Febiad_Gas_Line_Check_7July2014_arrows.jpg 