  655   Monday, May 05, 2014, 13:05 David WangITERepairTM3 ITE target module flange seal has been replaced.

ITE target module flange seal has been replaced.The flan surface and the o-ring groove have been cleaned with Acetone before the new seal is installed. See attached picture.

Attachment 1: 004.JPG
004.JPG
Attachment 2: 008.JPG
008.JPG
Attachment 3: 008.JPG
008.JPG
Attachment 4: 007.JPG
007.JPG
  656   Monday, May 05, 2014, 13:11 David WangITERepairTM3  ITE Entrance module has been disconnected.

ITE entrance module has been disconnected and the lifting yoke is installed for module move. See attached pictures.

Attachment 1: 011.JPG
011.JPG
Attachment 2: 025.JPG
025.JPG
Attachment 3: 033.JPG
033.JPG
Attachment 4: 035.JPG
035.JPG
Attachment 5: 032.JPG
032.JPG
  658   Wednesday, May 07, 2014, 10:08 David WangITERepairTM3 ITE entrance module flange seal had been replaced.

ITE entrance module flange seal had been replaced yesterday.The flange and the seal groove were cleaned with Acetone before the new seal is installed. See pictures

Attachment 1: 001.JPG
001.JPG
Attachment 2: 002.JPG
002.JPG
Attachment 3: 003.JPG
003.JPG
Attachment 4: 004.JPG
004.JPG
Attachment 5: 005.JPG
005.JPG
Attachment 6: 006.JPG
006.JPG
Attachment 7: 007.JPG
007.JPG
  659   Wednesday, May 07, 2014, 10:15 David WangITERepairTM3 ITE TM3, entrance module and BL2A3 window flange seals leak check..

ITE TM3, entrance module, and 2A3 window flange seals have been leak checked this morning after 2 new seals replacement.The LD base leak rate was 0.0xE-9 atm.cc/sec,  base pressure was 0.0 XE-4 Torr. I sprayed lots helium around the TM3, entrance module and 2A3 flange seals. No any response had been found on LD during the  spraying. All three flanges are sealed perfectly now.

  660   Wednesday, May 14, 2014, 19:01 Grant MinorITEMaintenanceTM3 HV short inspection at ITE

Friedhelm Ames commented to me that there appears to be a short between High Voltage and Ground at TM3 at ITE.

Friedhelm, Anders and I initiated a survey by Andrew from RPG, and entered the Target Hall at approximately 5pm to visually assess the HV cover at the MAA.  There was no clear indication of a problem.  We opted to wait for David to return as we weren't sure exactly what we were looking for.

Friedhelm and Anders confirmed in the Electrical Room that the short is in the Target Hall.

  661   Thursday, May 15, 2014, 14:38 David WangITERepairTM3TM3Bias short on ITE

Anders and I opened the HV cover in ITE and did  a visual check inside ITE HV  cover and top of TM3.Bill was with us and took the pictures. There was nothing obviously wrong when we opened the HV cover in ITE. We disconnected TM3 high current cables from ITE. Then we did an electrical check on TM3.The TM3 was good and passed megga test (465Mohm at 500V). The module was good and was separated electrically from the ITE at that moment. Then, we went back to electrical room and measured the resistance between bias and ground with ground bar opened and power supply disconnect. It was still shorted at that moment .We thought the short is located inside HV chase between electrical room and ITE. Then, we went back to ITE again and reconnected TM3 back to ITE. We wiped two blue nylon insulators between bias and ground, and no obviously spark track or dirty on them. We put HV cover back in ITE locked area, and went back to electrical room again.We decided to do a final electrical check there. We thought the short should be still there and we just want to confirm it . But this time the short  is gone. Everything goes back to normal.   The short disappeared and We test bias to 5KV and the current looks normal now.  

  684   Tuesday, June 24, 2014, 11:12 Travis CaveSouth Hot-CellStandard OperationTM3TiC#4module move

TM#4 with TiC#4 has been moved from the east target station to the south hot cell.

  686   Tuesday, June 24, 2014, 11:58 Travis CaveSouth Hot-CellStandard OperationTM3TiC#4Electrical check

Electrical check of the TiC#4 on TM#3 post beam at the south hot cell, see attached PDF for details

Attachment 1: TM3_TiC4_elec_chk_SHC_postbeam.PDF
TM3_TiC4_elec_chk_SHC_postbeam.PDF
  687   Tuesday, June 24, 2014, 15:14 Anders MjosSouth Hot-CellStandard OperationTM3TiC#4Conductor insulator broken close to right TGHT terminal

When the Containment Box was opened today by Chad for a target change, we found the conductor insulator block B (ITD0054) to be broken close to the right TGHT terminal. Chad was nevertheless able to remove the target. See DocuShare and attached file for photos.

An attempt to replace the insulator will be made tomorrow with a spare.

A small sticky piece, likely off plastic material, was found next to the left main source tray insulator. The piece was removed from the Containment Box. See link above and attachment for photos.

Attachment 1: TiC#4_Broken_Insulator.pdf
TiC#4_Broken_Insulator.pdf
  688   Tuesday, June 24, 2014, 15:45 Anders MjosSouth Hot-CellStandard OperationTM3TiC#4Ground Electrode and Extraction Electrode dirty after last run

See attached pdf and DocuShare for more photos. It may be possible to clean some of it from the Ground Electrode.

Attachment 1: TiC#4_Dirty_GND_and_EE_electrodes.pdf
TiC#4_Dirty_GND_and_EE_electrodes.pdf
  689   Wednesday, June 25, 2014, 12:49 Anders MjosSouth Hot-CellStandard OperationTM3TiC#4Conductor insulator broken close to right TGHT terminal

Anders Mjos wrote:

When the Containment Box was opened today by Chad for a target change, we found the conductor insulator block B (ITD0054) to be broken close to the right TGHT terminal. Chad was nevertheless able to remove the target. See DocuShare and attached file for photos.

An attempt to replace the insulator will be made tomorrow with a spare.

A small sticky piece, likely off plastic material, was found next to the left main source tray insulator. The piece was removed from the Containment Box. See link above and attachment for photos.

 The two insulators ITD0053 and ITD0054 was replaced this morning by Chad. Photos on DocuShare. All bolts torqued with torque wrench see attached PDF for values.

Attachment 1: ITD0052C_revB.pdf
ITD0052C_revB.pdf
  690   Wednesday, June 25, 2014, 12:55 Anders MjosSouth Hot-CellStandard OperationTM3TiC#4Object - possibly cable tie found in Containment Box

 See attached PDF. The object is not accessible with only the front panel removed. Photos on DocuShare.

Attachment 1: TiC#4_Cable_Tie.pdf
TiC#4_Cable_Tie.pdf
  691   Wednesday, June 25, 2014, 13:46 Travis CaveSouth Hot-CellRepairTM3no targetElectrical check

Electrical check of TM#3 after the insulator repair. See attached PDF for details.

Attachment 1: TM3electestsinsulrepair.PDF
TM3electestsinsulrepair.PDF
  692   Thursday, June 26, 2014, 10:57 David WangSouth Hot-CellStandard OperationTM3 Leak check on TM3 HS water line with new target. installed.

Chad and I leak checked the TM3 HS water line with new target installed.  No leak has been found during the check. Leak detector base LR 0.0xE-9 atm.cc/sec, base pressure 0.0xE-4 torr. The line will be helium pressurized at CS later.

  693   Thursday, June 26, 2014, 11:15 Travis CaveSouth Hot-CellStandard OperationTM3SiC#30Electrical check

Electrical check of the TM#3 with SiC#30 attached. Also an electrical check of TM#3 after the cleaning of ground electrode with no target attached.

Attachment 1: TM3_SiC30_elecSHC.PDF
TM3_SiC30_elecSHC.PDF
Attachment 2: TM3_elecchkaftclean.PDF
TM3_elecchkaftclean.PDF
  694   Thursday, June 26, 2014, 14:18 Travis CaveConditioning StationStandard OperationTM3SiC#30module move

TM#3 with SiC#30 has been moved from the south hot cell to the conditioning station.

  695   Friday, June 27, 2014, 10:16 David WangConditioning StationStandard OperationTM3  TM3 HS water lines helium pressure test. at CS

TM3 HS water line helium pressure test is done at CS. 70 psi helium , 3 minutes.Base LR 0.0xE-9 atm.cc/sec, base pressure 0.0xE-4 torr.  No response. The line is leak free.

  696   Friday, June 27, 2014, 11:26 Anders MjosSouth Hot-CellStandard OperationTM3 Ground Electrode Cleaned

Anders Mjos wrote:

See attached pdf and DocuShare for more photos. It may be possible to clean some of it from the Ground Electrode.

 Chad cleaned the GND electrode yesterday June 26th - see attached PDF. Photos on DocuShare.

Attachment 1: TM3_GND_Electrode_Cleaning.pdf
TM3_GND_Electrode_Cleaning.pdf
  697   Wednesday, July 02, 2014, 09:02 Travis CaveITEStandard OperationTM3SiC#30module move

TM#3 with SiC#30 has been moved from the conditioning station to the east target station.

  699   Monday, July 07, 2014, 14:45 Grant MinorITEMaintenanceTM3SiC #30FEBIAD gas line check

There were some problems this morning with provision of FEBIAD gas to the the target at ITE.  It was suspected that the gas line was improperly connected to the module, or that the valves at the module were not opened.

Remote Handling was asked to open the HV cover on TM3 at ITE and check the connection of the FEBIAD gas line.  Grant Minor, Maico Dalla Valle, Dan McDonald, and Anders Mjos entered the Target Hall before lunch on Work Permit I2014-07-07-1.

Maico entered ITE with suit and respirator, disengaged / disconnected the interlocks and removed the HV cover.  He inspected the FEBIAD gas line and found that it was properly connected, and that the valves were both open.  The gas line is shown in the attached image, with both valves marked in red.

Grant and Anders went into the electrical room to examine the supply gas bottle and supply circuit, and found that the supply gas pressure to the regulating valve was low.  It was concluded that the problem was not at the Target Module / Target Station.

Grant returned to the Target Station and instructed Maico to replace the HV cover.  After this was done, Grant confirmed with Jon Aoki over the phone that the interlock switch signals were both reading "OK".

Friedhelm Ames made an entry in today's ISAC Ops e-log regarding the supply pressure to the regulating valve.

ISAC E-log

 

Attachment 1: ITE_Febiad_Gas_Line_Check_7July2014_arrows.jpg
ITE_Febiad_Gas_Line_Check_7July2014_arrows.jpg