Wednesday, May 22, 2019, 08:33, Travis Cave, Conditioning Station, Standard Operation, TM1, no target, Module move
|
TM#1 has been moved from the north west silo to the conditioning station for the day it will be moved back to the silo tomorrow morning. |
Friday, May 17, 2019, 16:46, Adam Newsome, Safe Module Parking, Development, , , SMP Controls Installation Update
|
The following controls-related items were installed for the SMP project:
- Cable tray |
Friday, May 17, 2019, 10:47, Travis Cave, ITE, Standard Operation, TM2, Ta#58, Module move
|
TM#2 with Ta#58 has been moved from the south hot cell to the east target station. |
Thursday, May 16, 2019, 14:35, Travis Cave, South Hot-Cell, Standard Operation, TM2, Ta#58, Electrical Check
|
Results of the electrical check of TM#2 without target and with the new Ta#58 target. |
Thursday, May 16, 2019, 12:31, chad fisher, South Hot-Cell, Standard Operation, TM2, Ta#58, Ta #58 installed
|
Ta #58 has been installed onto TM2. All new silver plated high current fasteners. All torqued to 130 in lbs. |
Wednesday, May 15, 2019, 16:06, Isaac Earle, Safe Module Parking, Development, , , SMP module support flange installed and leak checked
|
The SMP module support flange sub-assembly (IRH1755) was installed today according to drawing IRH1683. Dow Corning 111 sealing compound was used
to keep the o-ring adhered to the lower groove during transportation and installation. The TCS shield plug (IRH1646) was then installed on the SMP
module flange which has vacuum connections for leak checking. Vacuum was pulled on the SMP vessel using the Varian 979 leak detector. After |
Monday, May 13, 2019, 11:22, David Wang, ITW, Repair, , , ITW entrance module has been connnected.
|
Entrance module has been connected back to ITW. Everything is normal. |
Monday, May 13, 2019, 09:55, Travis Cave, ITW, Standard Operation, , , Entrance module move
|
The West Entrance module has been moved from the south hot cell to the west target station. |
Friday, May 10, 2019, 10:23, chad fisher, South Hot-Cell, Repair, , , West Entrance module wire scanner replacement
|
West entrance module - visible broken or disconnected wire visible on old/existing wire scanner. Wire scanner removed, new one installed. |
Wednesday, May 08, 2019, 10:29, Travis Cave, South Hot-Cell, Standard Operation, , , Entrance module move
|
The entrance module has been moved from the west station to the south hot cell. |
Thursday, May 02, 2019, 09:37, Travis Cave, Spent Target Vault, Standard Operation, , UC#26, Spent Target Move
|
The spent UC#26 target was moved from the south hot cell to the spent target vault. It was place in pail #209 and put in spot 1A in the vault and
was 2.42mSv/hr upon removal from the south hot cell. |
Wednesday, May 01, 2019, 10:45, Travis Cave, South Hot-Cell, Standard Operation, TM4, no target, Electrical Check
|
Electrical check of the TM#4 with no target attached at the south hot cell before being moved to the south west silo. |
Wednesday, May 01, 2019, 09:34, Travis Cave, South Hot-Cell, Standard Operation, TM4, no target, Module move
|
TM#4 has now been moved to the south west silo. |
Wednesday, May 01, 2019, 07:49, chad fisher, South Hot-Cell, Standard Operation, TM4, UC#26, UC#26 removal
|
UC#26 has been removed from TM4. |
Tuesday, April 30, 2019, 11:19, Travis Cave, South Hot-Cell, Standard Operation, TM4, UC#26, Electrical Check
|
Electrical check of TM#4 with UC#26 post beam at the south hot cell. See attached. |
Tuesday, April 30, 2019, 08:59, Travis Cave, South Hot-Cell, Standard Operation, TM4, UC#26, Module move
|
TM#4 with UC#26 has been moved from ITE to the south hot cell. |
Monday, April 29, 2019, 09:32, Travis Cave, Spent Target Vault, Standard Operation, , SiC#31,32 and UC#19,20,21, Spent targets moved to mini vault.
|
The following targets have been moved from the spent target vault to the mini vault:
#127 - SiC#31 (front)
#132 - SiC#32 |
Monday, April 29, 2019, 07:56, chad fisher, South Hot-Cell, Development, , , Pail transfers
|
Two pail transfers took place April 25th.
Ta#47 transfered from pail 137 to pail 201. existing plastic bag from 137 showed many areas of typical age/rad damage related failure.
|
Thursday, April 18, 2019, 10:04, Travis Cave, South Hot-Cell, Maintenance, , Ta#50, SiC#34, Ta#46, Ta#47, and Ta#45, Target transfer from old pail to new pail.
|
Targets Ta#50 and SiC#34 have been transferred from their old pails to new ones. Ta#50 was done on April 12th 2019 it was moved from pail #148
to pail #200 and a new field measurement was done and found to be 3.57mSv/hr. SiC#34 was done on April 18th 2019 it was moved from pail #143 to pail #
206 and a new field measurement was done and found to be 2.20mSv/hr. Both measurements were done by the RAM that is mounted at the south hot cell. |
Wednesday, April 17, 2019, 12:03, chad fisher, South Hot-Cell, Repair, , , Manipulator repair
|
Broken handle cable of east manipulator has been replaced and manipulator is operational again. |
|