Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
RH-ISAC
Not logged in
List
Message ID:
1987
Entry time:
Wednesday, September 18, 2019, 14:28
Author:
Travis Cave
Category:
Spent Target Vault
Type:
Standard Operation
Module:
Target/Number:
Subject:
Repacking of the targets.
Three of the five targets in the mini storage have been repackaged into the stronger pail.
ELOG V2.9.2-2455