1928
|
Wednesday, May 22, 2019, 11:52 |
David Wang | Conditioning Station | Maintenance | TM1 | | TM1 inpsection. |
TM1 shielding plates and their holding bolts are inspected. No corrosion. TM1 is located at TCS now. Both TP1 and TP2 are started. |
1927
|
Wednesday, May 22, 2019, 11:50 |
David Wang | ITE | Standard Operation | TM4 | | TM2 has been connected in ITE. |
TM2 has been connected in ITE. high active water system and vacuum pumps are started. The pumping down on TM2 and ITE is good so far.
See attachment for connection checklist. |
1926
|
Wednesday, May 22, 2019, 08:33 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | no target | Module move |
TM#1 has been moved from the north west silo to the conditioning station for the day it will be moved back to the silo tomorrow morning. |
1925
|
Friday, May 17, 2019, 16:46 |
Adam Newsome | Safe Module Parking | Development | | | SMP Controls Installation Update |
The following controls-related items were installed for the SMP project:
- Cable tray
- Main control panel
- Motor starter box
- Wiring from limit switches and rotation motor to main control panel
- Air fittings at supply (quick disconnect)
- Main air supply hose from supply to control panel (quick disconnect)
- Air tubing from lid control valve at control panel to lid cylinders
Air fittings stem off existing air supply lines on the South wall, below a manual shutoff valve. A quick disconnect was installed. When SMP is not in use, manual shutoff valve should be left off.
Main control panel and motor starter box were mounted on the North wall. Wire duct runs from the main control panel to the grated floor. Cabling/air runs underneath the mezzanine platform, along existing and new cable tray, to the SMP.
Cable tray was installed on the South wall, from the corner to the SMP module. A cutout was made to accommodate for existing tubing. An additional ~1 ft. of tray will be added to the end, near the corner, at a future time.
Remainder of installation work to be done before commissioning:
- Mount and install new Opto-22 module
- Chain new Opto-22 module to existing one (power, comms) below mezzanine on North wall |
1924
|
Friday, May 17, 2019, 10:47 |
Travis Cave | ITE | Standard Operation | TM2 | Ta#58 | Module move |
TM#2 with Ta#58 has been moved from the south hot cell to the east target station. |
1923
|
Thursday, May 16, 2019, 14:35 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Ta#58 | Electrical Check |
Results of the electrical check of TM#2 without target and with the new Ta#58 target. |
1922
|
Thursday, May 16, 2019, 12:31 |
chad fisher | South Hot-Cell | Standard Operation | TM2 | Ta#58 | Ta #58 installed |
Ta #58 has been installed onto TM2. All new silver plated high current fasteners. All torqued to 130 in lbs. |
1921
|
Wednesday, May 15, 2019, 16:06 |
Isaac Earle | Safe Module Parking | Development | | | SMP module support flange installed and leak checked |
The SMP module support flange sub-assembly (IRH1755) was installed today according to drawing IRH1683. Dow Corning 111 sealing compound was used to keep the o-ring adhered to the lower groove during transportation and installation. The TCS shield plug (IRH1646) was then installed on the SMP module flange which has vacuum connections for leak checking. Vacuum was pulled on the SMP vessel using the Varian 979 leak detector. After approximately 3.5 hours of pumping the test port pressure was at 2.4E-2 Torr and leak rate was 7.9E-8atm*cc/s. Helium was configured with the regulator set at 10psi and flow rate of >10 bubbles per second in Windex and then applied slowly around the perimeter of the vacuum flange (IRH1686) and it's mating components on both the top and the bottom. There was no response on the leak detector indicating the seals on both sides of the module flange are leak tight.
|
1920
|
Monday, May 13, 2019, 11:22 |
David Wang | ITW | Repair | | | ITW entrance module has been connnected. |
Entrance module has been connected back to ITW. Everything is normal. |
1919
|
Monday, May 13, 2019, 09:55 |
Travis Cave | ITW | Standard Operation | | | Entrance module move |
The West Entrance module has been moved from the south hot cell to the west target station. |
1918
|
Friday, May 10, 2019, 10:23 |
chad fisher | South Hot-Cell | Repair | | | West Entrance module wire scanner replacement |
West entrance module - visible broken or disconnected wire visible on old/existing wire scanner. Wire scanner removed, new one installed. |
1917
|
Wednesday, May 08, 2019, 10:29 |
Travis Cave | South Hot-Cell | Standard Operation | | | Entrance module move |
The entrance module has been moved from the west station to the south hot cell. |
1916
|
Thursday, May 02, 2019, 09:37 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#26 | Spent Target Move |
The spent UC#26 target was moved from the south hot cell to the spent target vault. It was place in pail #209 and put in spot 1A in the vault and was 2.42mSv/hr upon removal from the south hot cell. |
1915
|
Wednesday, May 01, 2019, 10:45 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | Electrical Check |
Electrical check of the TM#4 with no target attached at the south hot cell before being moved to the south west silo. |
1914
|
Wednesday, May 01, 2019, 09:34 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | Module move |
TM#4 has now been moved to the south west silo. |
1913
|
Wednesday, May 01, 2019, 07:49 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | UC#26 | UC#26 removal |
UC#26 has been removed from TM4. |
1912
|
Tuesday, April 30, 2019, 11:19 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#26 | Electrical Check |
Electrical check of TM#4 with UC#26 post beam at the south hot cell. See attached. |
1911
|
Tuesday, April 30, 2019, 08:59 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#26 | Module move |
TM#4 with UC#26 has been moved from ITE to the south hot cell. |
1910
|
Monday, April 29, 2019, 09:32 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#31,32 and UC#19,20,21 | Spent targets moved to mini vault. |
The following targets have been moved from the spent target vault to the mini vault:
#127 - SiC#31 (front)
#132 - SiC#32
#145 - UC#19
#150 - UC#20
#159 - UC#21 (back) |
1909
|
Monday, April 29, 2019, 07:56 |
chad fisher | South Hot-Cell | Development | | | Pail transfers |
Two pail transfers took place April 25th.
Ta#47 transfered from pail 137 to pail 201. existing plastic bag from 137 showed many areas of typical age/rad damage related failure.
Ta#45 in pail 124 was transfered to pail 202. Pail 124 also contained the shutter and "roof mounted" img gauge from TM2 that were removed in 2015 in addition to a bunch of fasteners, heat shrink tubing (from lock lever rings from an previous methods of spent target packaging) etc. The original plastic bag in pail 124 had completely failed and shredded and flaky. The shutter and extraction electrode from Ta#47 were put in pail 202 with Ta#45...cabling of the shutter being completely intertwined with the target. |