  RH-ISAC, Page 41 of 141  Not logged in ELOG logo
  ID Date Author Category Type Module Target/Numberdown Subject Text Attachments
  1658   Thursday, November 09, 2017, 10:39 Anders MjosConditioning StationStandard OperationTM2Ta#55Conditioning Ta#55Thursday, November 09, 2017, 10:40: BIAS
/ EL to 30 / 15 kV. 400 uA on BIAS
Bias was stable for 1 hour. Handed
  
  1661   Tuesday, November 14, 2017, 10:01 Travis CaveITWStandard OperationTM2Ta#55Module move TM#2 with Ta#55 has been moved from
the conditioning station to the west target
station. The field was measured on the access
  
  1662   Tuesday, November 14, 2017, 14:34 David WangITWStandard OperationTM2Ta#55TM2 has been connected in ITW.TM2 has been connected in ITW. All turbo-pumps
are started. Everything works fine.
  
  1686   Tuesday, February 13, 2018, 13:56 Anders MjosITWStandard OperationTM2Ta#55Target module disconnectedTM disconnected by David and Yasmine Feb
8th. One of the water couplings were leaking
for a short while when disconnected. NCR
  
  1698   Monday, April 09, 2018, 09:57 Travis CaveSouth Hot-CellStandard OperationTM2Ta#55Module move TM#2 with Ta#55 has been moved from
the west target station to the south hot
cell.
  
  1700   Monday, April 16, 2018, 14:51 Travis CaveSpent Target VaultStandard Operation Ta#55Spent Target Move Ta#55 has been moved from the south
hot cell to the spent target vault. It was
30.4mSv/hr upon removal from the hotcell,
  
  1659   Monday, November 13, 2017, 13:39 Travis CaveSouth Hot-CellStandard OperationTM2Ta#54 and #55Electrical Check The results of the various electrical
check done on the target module on November
7th and 8th of 2017. Checks were done with
 TM2-Ta54-_Electrical_Check_SHC_Post_Beam.pdfTM2-no_target-_Electrical_Check_SHC_Nov_2017.pdfTM2-Ta55_Electrical_Check_SHC.pdf 
  1626   Tuesday, September 26, 2017, 14:27 Travis CaveSouth Hot-CellStandard OperationTM2Ta#54Electrical CheckElectrical check of TM#2 with Ta#54 at
the south hot cell. See attached PDF for
details.
 TM2_Ta54_elec_chk_SHC.PDF 
  1627   Wednesday, September 27, 2017, 08:00 chad fisherSouth Hot-CellStandard OperationTM2Ta#54Ta#54 installedContainment box has been replaced onto
TM2, interior of containment box vacuumed,
and Ta#54 installed with new fasteners (high
  
  1628   Wednesday, September 27, 2017, 09:02 Travis CaveConditioning StationStandard OperationTM2Ta#54Module move TM#2 with Ta#54 has been moved from
the south hot cell to the conditioning station.
  
  1632   Thursday, September 28, 2017, 17:44 Anders MjosConditioning StationStandard OperationTM2Ta#54Conditioning Ta#54Thursday, September 28, 2017
Cooling water not yet connected to
TM.
 Ta#54.docxTa#54_BIAS_current_vs_voltage.xlsx 
  1633   Tuesday, October 03, 2017, 09:29 Travis CaveITWStandard OperationTM2Ta#54Module move TM#2 with Ta#54 has been moved from
the conditioning station to the west target
station.
  
  1654   Tuesday, November 07, 2017, 10:11 Travis CaveSouth Hot-CellStandard OperationTM2Ta#54Module move TM#2 with Ta#54 has been moved from
the west target station to the south hot
cell.
  
  1660   Monday, November 13, 2017, 13:50 Travis CaveSpent Target VaultStandard Operation Ta#54Spent Target Move The spent Ta#54 target has been moved
from the south hot cell to the spent target
vault. It was placed in Pail #157 and put
 Target_Index_2017-11-13.pdf 
  1595   Tuesday, August 08, 2017, 13:26 Travis CaveITWStandard OperationTM2Ta#53module movedTM#2 with Ta#53 has been moved from the
conditioning station to the west target station.
  
  1598   Tuesday, August 15, 2017, 09:30 Anders MjosITWStandard OperationTM2Ta#53TM2 radiation fields

    

       
            
  
  1618   Tuesday, September 19, 2017, 13:53 Travis CaveSouth Hot-CellStandard OperationTM2Ta#53Module move TM#2 with Ta#53 has been moved from
the west target station to the south hot
cell.
  
  1620   Thursday, September 21, 2017, 10:48 Travis CaveSouth Hot-CellStandard OperationTM2Ta#53Electrical CheckElectrical checks of TM#2 with Ta#53 and
also with out a target.
 TM2_Ta53_elec_chk_shc.PDFTM2_Ta53_elec_chk_post_beam_shc.PDFTM2_notgt_elec_chk_shc_09202017.PDF 
  1630   Thursday, September 28, 2017, 11:59 Travis CaveSpent Target VaultStandard Operation Ta#53Spent Target moveThe spent Ta#53 has been moved to the spent
target vault. See attached file for details.
 Vault_Storage_September_28_2017.pdf 
  2267   Monday, November 15, 2021, 12:00 Travis CaveSpent Target VaultStandard Operation Ta#53Repacking of the target. Ta#53 was repacked and placed in
the mini vault it was changed from pail#164
to pail#262. See attached PDF for further
 Target_Index_2021-11-15.pdfTarget_Index_2021-11-15_mini_vault.pdf 