1658
|
Thursday, November 09, 2017, 10:39 |
Anders Mjos | Conditioning Station | Standard Operation | TM2 | Ta#55 | Conditioning Ta#55 | Thursday, November 09, 2017, 10:40: BIAS
/ EL to 30 / 15 kV. 400 uA on BIAS
Bias was stable for 1 hour. Handed |
|
|
1661
|
Tuesday, November 14, 2017, 10:01 |
Travis Cave | ITW | Standard Operation | TM2 | Ta#55 | Module move | TM#2 with Ta#55 has been moved from
the conditioning station to the west target
station. The field was measured on the access |
|
|
1662
|
Tuesday, November 14, 2017, 14:34 |
David Wang | ITW | Standard Operation | TM2 | Ta#55 | TM2 has been connected in ITW. | TM2 has been connected in ITW. All turbo-pumps
are started. Everything works fine. |
|
|
1686
|
Tuesday, February 13, 2018, 13:56 |
Anders Mjos | ITW | Standard Operation | TM2 | Ta#55 | Target module disconnected | TM disconnected by David and Yasmine Feb
8th. One of the water couplings were leaking
for a short while when disconnected. NCR |
|
|
1698
|
Monday, April 09, 2018, 09:57 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Ta#55 | Module move | TM#2 with Ta#55 has been moved from
the west target station to the south hot
cell. |
|
|
1700
|
Monday, April 16, 2018, 14:51 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#55 | Spent Target Move | Ta#55 has been moved from the south
hot cell to the spent target vault. It was
30.4mSv/hr upon removal from the hotcell, |
|
|
1659
|
Monday, November 13, 2017, 13:39 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Ta#54 and #55 | Electrical Check | The results of the various electrical
check done on the target module on November
7th and 8th of 2017. Checks were done with |
  |
|
1626
|
Tuesday, September 26, 2017, 14:27 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Ta#54 | Electrical Check | Electrical check of TM#2 with Ta#54 at
the south hot cell. See attached PDF for
details. |
|
|
1627
|
Wednesday, September 27, 2017, 08:00 |
chad fisher | South Hot-Cell | Standard Operation | TM2 | Ta#54 | Ta#54 installed | Containment box has been replaced onto
TM2, interior of containment box vacuumed,
and Ta#54 installed with new fasteners (high |
|
|
1628
|
Wednesday, September 27, 2017, 09:02 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | Ta#54 | Module move | TM#2 with Ta#54 has been moved from
the south hot cell to the conditioning station. |
|
|
1632
|
Thursday, September 28, 2017, 17:44 |
Anders Mjos | Conditioning Station | Standard Operation | TM2 | Ta#54 | Conditioning Ta#54 | Thursday, September 28, 2017
Cooling water not yet connected to
TM. |
 |
|
1633
|
Tuesday, October 03, 2017, 09:29 |
Travis Cave | ITW | Standard Operation | TM2 | Ta#54 | Module move | TM#2 with Ta#54 has been moved from
the conditioning station to the west target
station. |
|
|
1654
|
Tuesday, November 07, 2017, 10:11 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Ta#54 | Module move | TM#2 with Ta#54 has been moved from
the west target station to the south hot
cell. |
|
|
1660
|
Monday, November 13, 2017, 13:50 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#54 | Spent Target Move | The spent Ta#54 target has been moved
from the south hot cell to the spent target
vault. It was placed in Pail #157 and put |
|
|
1595
|
Tuesday, August 08, 2017, 13:26 |
Travis Cave | ITW | Standard Operation | TM2 | Ta#53 | module moved | TM#2 with Ta#53 has been moved from the
conditioning station to the west target station. |
|
|
1598
|
Tuesday, August 15, 2017, 09:30 |
Anders Mjos | ITW | Standard Operation | TM2 | Ta#53 | TM2 radiation fields |
|
|
|
1618
|
Tuesday, September 19, 2017, 13:53 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Ta#53 | Module move | TM#2 with Ta#53 has been moved from
the west target station to the south hot
cell. |
|
|
1620
|
Thursday, September 21, 2017, 10:48 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Ta#53 | Electrical Check | Electrical checks of TM#2 with Ta#53 and
also with out a target. |
  |
|
1630
|
Thursday, September 28, 2017, 11:59 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#53 | Spent Target move | The spent Ta#53 has been moved to the spent
target vault. See attached file for details. |
|
|
2267
|
Monday, November 15, 2021, 12:00 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#53 | Repacking of the target. | Ta#53 was repacked and placed in
the mini vault it was changed from pail#164
to pail#262. See attached PDF for further |
 |