ID Date Authordown Category Type Module Target/Number Subject
  1644   Wednesday, October 18, 2017, 10:45 Travis CaveSouth Hot-CellStandard OperationTM4SiC#37Electrical Check

 The results of the electrical check of TM#4 with SiC#37, see attached PDF.

Attachment 1: TM4_SIC37_elec_chk_SHC.pdf
TM4_SIC37_elec_chk_SHC.pdf
  1645   Wednesday, October 18, 2017, 10:46 Travis CaveConditioning StationStandard OperationTM4SiC#37Module move

 TM#4 with SiC#37 has been moved from the south hot cell to the conditioning station.

  1650   Monday, October 23, 2017, 13:38 Travis CaveSpent Target VaultStandard Operation UC#21Spent Target move

The spent UC#21 has been moved from the south hot cell to the spent target vault. See attached for details

Attachment 1: Vault_Storage_October_23_2017.pdf
Vault_Storage_October_23_2017.pdf Vault_Storage_October_23_2017.pdf Vault_Storage_October_23_2017.pdf Vault_Storage_October_23_2017.pdf
  1651   Tuesday, October 24, 2017, 11:58 Travis CaveITEStandard OperationTM4SiC#37Module move

 TM#4 with SiC#37 has been moved from the conditioning station to the east target station. A measurement was taken on TM#4 as it was being removed from the conditioning station, the location was on the side of the service tray access panel approx one metre away and the cover fully exposed, the reading was 750uSV/hr.

  1653   Thursday, October 26, 2017, 13:20 Travis CaveSpent Target VaultStandard Operation SiC#30,ZrC#7,Ta#44,TiC#4, and Ta#41Targets moved to mini storage

SiC#30,ZrC#7,Ta#44,TiC#4, and Ta#41 have been moved from the spent target storage to the mini storage. See attached PDF for details of the orders of the pails in the mini vault.

Attachment 1: Mini_Vault_Storage_October_26_2017.pdf
Mini_Vault_Storage_October_26_2017.pdf Mini_Vault_Storage_October_26_2017.pdf Mini_Vault_Storage_October_26_2017.pdf Mini_Vault_Storage_October_26_2017.pdf
  1654   Tuesday, November 07, 2017, 10:11 Travis CaveSouth Hot-CellStandard OperationTM2Ta#54Module move

 TM#2 with Ta#54 has been moved from the west target station to the south hot cell.

  1659   Monday, November 13, 2017, 13:39 Travis CaveSouth Hot-CellStandard OperationTM2Ta#54 and #55Electrical Check

 The results of the various electrical check done on the target module on November 7th and 8th of 2017. Checks were done with the old Ta#54 target without a target and finally with the new Ta#55 target. See the attached PDF for results.

Attachment 1: TM2-Ta54-_Electrical_Check_SHC_Post_Beam.pdf
TM2-Ta54-_Electrical_Check_SHC_Post_Beam.pdf
Attachment 2: TM2-no_target-_Electrical_Check_SHC_Nov_2017.pdf
TM2-no_target-_Electrical_Check_SHC_Nov_2017.pdf
Attachment 3: TM2-Ta55_Electrical_Check_SHC.pdf
TM2-Ta55_Electrical_Check_SHC.pdf
  1660   Monday, November 13, 2017, 13:50 Travis CaveSpent Target VaultStandard Operation Ta#54Spent Target Move

 The spent Ta#54 target has been moved from the south hot cell to the spent target vault. It was placed in Pail #157 and put in spot #5B of the vault.

Attachment 1: Target_Index_2017-11-13.pdf
Target_Index_2017-11-13.pdf
  1661   Tuesday, November 14, 2017, 10:01 Travis CaveITWStandard OperationTM2Ta#55Module move

 TM#2 with Ta#55 has been moved from the conditioning station to the west target station. The field was measured on the access panel to the service chase and the field was found to be 430uSv/hr at one meter from the module.

  1690   Monday, March 05, 2018, 13:47 Travis CaveSpent Target VaultRepair ManySpent Target Assay

 The spent target assay was aborted today after the first target was finished due to the very old computer that controls the camera and the vault door effectively died. The vault door had to be closed using the emergency door closing winch which worked so it passed that test.

  1695   Friday, March 23, 2018, 09:34 Travis CaveSpent Target VaultStandard Operation ManySpent Target Assay

 All targets in the ISAC Spent Target Vault have been either assayed and had field measurement done on them or just measurement if to hot to assay.

Attachment 1: Target_Index_2018-03-23.pdf
Target_Index_2018-03-23.pdf
  1698   Monday, April 09, 2018, 09:57 Travis CaveSouth Hot-CellStandard OperationTM2Ta#55Module move

 TM#2 with Ta#55 has been moved from the west target station to the south hot cell.

  1699   Tuesday, April 10, 2018, 10:43 Travis CaveSouth Hot-CellStandard OperationTM4no targetModule move

 TM#2 has been moved from the south hot cell to the south west silo.

  1700   Monday, April 16, 2018, 14:51 Travis CaveSpent Target VaultStandard Operation Ta#55Spent Target Move

 Ta#55 has been moved from the south hot cell to the spent target vault. It was 30.4mSv/hr upon removal from the hotcell, placed in pail #161 and put in spot 7A of the vault.

  1702   Thursday, April 19, 2018, 10:27 Travis CaveITWMaintenance  Entrance module move

 The west entrance module has been moved from the west target station to the silo.

  1706   Tuesday, May 01, 2018, 11:12 Travis CaveITEStandard OperationTM4SiC#37Module move

 TM#4 with SiC#37 has been moved from the East Target Station to the South Hot cell.

  1707   Tuesday, May 01, 2018, 13:40 Travis CaveSouth Hot-CellStandard OperationTM4SiC#37Electrical Check

 Electrical check of TM#4 with SiC#37 attached post beam. A short was found between the Einzel Lens and Chassis. See attached PDF for details.

Attachment 1: TM4_electrical_check_SiC37_post_beam.pdf
TM4_electrical_check_SiC37_post_beam.pdf
  1708   Thursday, May 03, 2018, 08:24 Travis CaveSouth Hot-CellStandard OperationTM4no targetElectrical Check

 The results of yesterdays electrical check of TM#4 with no target attached. See the attached PDF for details.

Attachment 1: TM4_Electrical_Check_notarget_May_2_2018.pdf
TM4_Electrical_Check_notarget_May_2_2018.pdf
  1713   Tuesday, May 15, 2018, 07:44 Travis CaveConditioning StationStandard OperationTM4no targetModule move

 TM#4 was moved to the conditioning station from the south hot cell. The module was moved with out the containment box.

  1716   Thursday, May 17, 2018, 13:17 Travis CaveITWStandard Operation  Entrance module move

 The west entrance module has been moved from the silo to the west target station.