2504
|
Wednesday, November 22, 2023, 12:24 |
Adam Newsome | Spent Target Vault | Standard Operation | | Ta#65 | Spent Target Move | The spent Ta#65 target was removed from
the south hot cell and placed in the spent
target vault. It was placed in pail #284 |
|
|
2338
|
Thursday, June 23, 2022, 07:11 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | Ta#64 | electrical check | New Target Ta#64 was installed on
TM4. Electrical measurement result is good.
c/w attachment. |
|
|
2340
|
Thursday, June 23, 2022, 13:04 |
David Wang | Conditioning Station | Standard Operation | TM4 | Ta#64 | helium pressure test on TM4 HS line. | With Ta#64 installed , TM4 HS line was
helium pressure tested at TCS. base leak
rate is 0.0XE-9 atm.cc/sec. HS line tested |
|
|
2341
|
Tuesday, June 28, 2022, 14:13 |
Frank Song | ITE | Standard Operation | TM4 | Ta#64 | Module Connection | TM4 with Ta#64 was connected in ITE.
see attachment please. |
|
|
2353
|
Tuesday, August 09, 2022, 12:19 |
Frank Song | ITE | Standard Operation | TM4 | Ta#64 | TM4 with Ta#64 disconnection in ITE | TM4 with Ta#64 has been disconnected
in ITE. |
|
|
2357
|
Thursday, August 18, 2022, 10:13 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#64 | Spent Target Move | The spent Ta#64 target in the north
hot cell has been packaged and placed in
the spent target vault. Pail#273 spot #5C |
|
|
2277
|
Thursday, November 25, 2021, 10:33 |
David Wang | Conditioning Station | Standard Operation | TM4 | Ta#63. | helium pressure test on TM4 HS line at TCS. | Helium pressure test on TM4 HS line at
TCS is done. LD base leak rate 0.0
xE-9 atm.cc/sec. Helium pressure 70psi. HS |
|
|
2280
|
Tuesday, November 30, 2021, 11:03 |
David Wang | ITE | Standard Operation | TM4 | Ta#63. | Remotely remove TM4(Ta#63) from TCS to ITE. | Remotely remove TM4(Ta#63) from TCS to
ITE. The move is smooth and successful. |
|
|
2281
|
Tuesday, November 30, 2021, 12:51 |
David Wang | ITE | Standard Operation | TM4 | Ta#63. | Tm4 has been connected in ITE. | TM4 has been connected in ITE. See attachment
for checklist. |
|
|
2297
|
Thursday, January 20, 2022, 11:09 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#63 | Spent Target Move | The spent Ta#63 has been moved from the north
hot cell to the spent target vault. It was
place in pail#266 and
|
|
|
2232
|
Thursday, July 08, 2021, 11:36 |
David Wang | Conditioning Station | Standard Operation | TM4 | Ta#62 | Remotely remove TM4(Ta#62) from SHC to TCS. | Remotely remove TM4 (ta# 62) from SHC to
TCS. The moving is smooth. |
|
|
2233
|
Thursday, July 08, 2021, 11:45 |
David Wang | South Hot-Cell | Standard Operation | TM4 | Ta#62 | TM4 Ta#62 leak check and lectrical check result at SHC and TCS. | At SHC: HS line no leak . electrical check
result is fine. At TCS: helium pressurized
HS line to 70psi, 3 minutes. LD leak |
|
|
2236
|
Friday, July 30, 2021, 16:19 |
Carla Babcock | ITE | Repair | TM4 | Ta#62 | Electrical issues on Ta62 | TLDR: TBHT
voltage too high and rising too quickly with |
|
|
2247
|
Friday, September 17, 2021, 14:28 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#62 | Spent Target Move | The spent Ta#62 target along with
2A2M19 were placed in pail #256 and placed
in spot 7A of the spent target vault. See |
|
|
2162
|
Thursday, November 05, 2020, 10:48 |
Travis Cave | ITE | Standard Operation | TM4 | Ta#61 | Module move | TM#4 with Ta#61 has been moved from
the south hot cell to the east target station. |
|
|
2177
|
Friday, January 08, 2021, 09:40 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#61 | Module move | TM#4 with Ta#61 has been moved from
the east target station to the south hot
cell. |
|
|
2138
|
Wednesday, August 26, 2020, 09:52 |
David Wang | South Hot-Cell | Standard Operation | TM2 | Ta#60 | Ta#60 target electrical check and leak check at SHC. | Electrical check and leak check at SHC.
NO leak. electrical check ok.
Before target on, A is short to PQ, RU is |
|
|
2139
|
Thursday, August 27, 2020, 08:21 |
David Wang | Conditioning Station | Standard Operation | TM2 | Ta#60 | Helium pressure check on TM2 HS line at TCS. | Helium pressurize on TM2 HS line at TCS
is done. Base LR is 0.0X
E-9 |
|
|
2140
|
Thursday, August 27, 2020, 09:42 |
Anders Mjos | Conditioning Station | Maintenance | TM2 | Ta#60 | Refilled TK2 | Refilled TCS:TK2 from 10 in to 22 in using
the newly installed valve. |
|
|
2144
|
Friday, September 11, 2020, 11:25 |
Travis Cave | ITW | Standard Operation | TM2 | Ta#60 | Module move | Both the west entrance module and
TM#2 with Ta#60 have been moved back into
ITW. |
|