Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2281     Entry time: Tuesday, November 30, 2021, 12:51
Author: David Wang 
Category: ITE 
Type: Standard Operation 
Module: TM4 
Target/Number: Ta#63. 
Subject: Tm4 has been connected in ITE.  

TM4 has been connected in ITE. See attachment for checklist.

Attachment 1: from_my_cellphone_2598_647.jpg  2.685 MB  | Show | Hide all
Attachment 2: from_my_cellphone_2598_648.jpg  2.538 MB  | Show | Hide all
Attachment 3: from_my_cellphone_2598_649.jpg  2.645 MB  | Show | Hide all
Attachment 4: from_my_cellphone_2598_650.jpg  2.441 MB  | Show | Hide all
ELOG V2.9.2-2455