  2514   Wednesday, January 03, 2024, 13:55 David WangITWStandard OperationTM2Ta#66Disconnect TM2 in ITW.

TM2 has been disconnected in ITW. All water lines are nitrogen purged. Filled 60 psi argon to all Tm2 water lines for module storage in winter shut down.

Attachment 1: TM2_with_Ta#66_was_disconnected_in_ITW_2024-01-02.pdf
TM2_with_Ta#66_was_disconnected_in_ITW_2024-01-02.pdf TM2_with_Ta#66_was_disconnected_in_ITW_2024-01-02.pdf TM2_with_Ta#66_was_disconnected_in_ITW_2024-01-02.pdf
  2515   Wednesday, January 03, 2024, 14:03 David WangITWStandard OperationTM2Ta#66ITW primary and secondary vacuum vessel leak check and TM2 water lines helium pressure test.

ITW primary and secondary vacuum vessel leak check and TM2 water lines helium pressure test are done today. No major concern. see attachment for small air to vacuum leak we found.  TM2 water lines helium pressure test is fine.   HS and window line leak rate are 1.4Xe-8 atm.cc/sec. all other water lines are below 3.0XE-9atm.cc/sec.

Attachment 1: ITW_2024_shut_down_leak_check.pdf
ITW_2024_shut_down_leak_check.pdf
  2518   Wednesday, January 10, 2024, 11:24 Travis CaveSpent Target VaultStandard Operation Ta#66Spent Target Move

 The spent Ta#66 was moved from the south hot cell to the spent target vault, it was placed in pail#285 and placed in spot 5B of the vault. The target was 46.2mSv/hr when removed from the south hot cell. See the attached PDF for vault details.

Attachment 1: Target_Index_2023-01-10.pdf
Target_Index_2023-01-10.pdf
  2523   Friday, January 12, 2024, 11:25 David WangSouth Hot-CellStandard OperationTM2Ta#66Ta#66 post operation electrical check at SHC

Ta#66 post operation electrical check was done at SHC this Monday. See attachment.

Attachment 1: TM2_Ta66_post__oeration_electrical_check.pdf
TM2_Ta66_post__oeration_electrical_check.pdf
  2524   Wednesday, January 17, 2024, 20:09 Carla BabcockSouth Hot-CellStandard Operation Ta#66Ta#66 post irradiation inspection

On Jan. 9 we did the PIE on Ta#66. Opened the heat shield and removed the EE. The inside of the heat shield was very black with lots of flakes falling off. The target itself looked overheated, and the container looked pretty bad for a Ta target. The outside of the EE looked perfect but after removing it there was a lot of black stuff on the side and we saw that the Re foil was curled up. Jens said during the runtime that he saw something that looked like a wire in the beam path, so maybe this was it.

Attachment 1: 20240109_100926(1).jpg
20240109_100926(1).jpg
Attachment 2: 20240109_101053.jpg
20240109_101053.jpg
Attachment 3: 20240109_102409.jpg
20240109_102409.jpg
  2582   Friday, May 03, 2024, 12:20 Travis CaveSpent Target VaultStandard Operation Ta#66Target repacked

 The Ta#66 target was repacked after the parasitic target was removed it was place in a new pail (#290) and place back in spot 5B of the vault. See attached PDF for further details.

Attachment 1: Target_Index_2024-05-03.pdf
Target_Index_2024-05-03.pdf
  2485   Tuesday, August 29, 2023, 14:32 Frank SongNorth Hot-CellStandard OperationTM4Ta#65electrical check/leak check

 TM4 with new target Ta#65 has been E/L checked at NHCPost.

Attachment 1: TM4_electric_and_leak_check_after_Ta#65_installed_2023-08-29.pdf
TM4_electric_and_leak_check_after_Ta#65_installed_2023-08-29.pdf
  2486   Tuesday, August 29, 2023, 14:32 Frank SongNorth Hot-CellStandard OperationTM4Ta#65electrical check/leak check

 TM4 with new target Ta#65 has been E/L checked at NHCPost.

Attachment 1: TM4_electric_and_leak_check_after_Ta#65_installed_2023-08-29.pdf
TM4_electric_and_leak_check_after_Ta#65_installed_2023-08-29.pdf
  2488   Wednesday, September 06, 2023, 08:07 Frank SongITEStandard OperationTM4Ta#65Module Connection

 TM4 was connected in ITE with new target Ta#65 installed. see attachment in detail.

Attachment 1: TM4_with_Ta#65_connection_in_ITE_2023-09-05.pdf
TM4_with_Ta#65_connection_in_ITE_2023-09-05.pdf TM4_with_Ta#65_connection_in_ITE_2023-09-05.pdf TM4_with_Ta#65_connection_in_ITE_2023-09-05.pdf TM4_with_Ta#65_connection_in_ITE_2023-09-05.pdf
  2498   Tuesday, November 07, 2023, 13:42 Frank SongSouth Hot-CellStandard OperationTM4Ta#65electrical check with the spent target

TM4 with spent target Ta#65 was electrical checked right after being moved to SHC. 

Attachment 1: TM4_with_Spent_Target_Ta#65_electrical_check_on_SHC_2023-11-07.pdf
TM4_with_Spent_Target_Ta#65_electrical_check_on_SHC_2023-11-07.pdf
  2499   Tuesday, November 07, 2023, 13:55 Frank SongITEStandard OperationTM4Ta#65module disconnection

TM4 with spent target Ta#65 was disconnected in ITE and moved to SHC.

Attachment 1: TM4_with_Spent_Target_Ta#65_disconnection_in_ITE_2023-11-07.pdf
TM4_with_Spent_Target_Ta#65_disconnection_in_ITE_2023-11-07.pdf TM4_with_Spent_Target_Ta#65_disconnection_in_ITE_2023-11-07.pdf TM4_with_Spent_Target_Ta#65_disconnection_in_ITE_2023-11-07.pdf
  2504   Wednesday, November 22, 2023, 12:24 Adam NewsomeSpent Target VaultStandard Operation Ta#65Spent Target Move

The spent Ta#65 target was removed from the south hot cell and placed in the spent target vault. It was placed in pail #284 and placed in spot 2B. It was 41 mSv/hr at 1 m upon removal. Target index spreadsheet updated.

  2338   Thursday, June 23, 2022, 07:11 Frank SongNorth Hot-CellStandard OperationTM4Ta#64electrical check

 New Target Ta#64 was installed on TM4. Electrical measurement result is good. c/w attachment.

Attachment 1: Ta#64.jpg
Ta#64.jpg
  2340   Thursday, June 23, 2022, 13:04 David WangConditioning StationStandard OperationTM4Ta#64helium pressure test on TM4 HS line.

With Ta#64 installed , TM4 HS line was helium pressure tested at TCS. base leak rate is 0.0XE-9 atm.cc/sec. HS line tested leak rate is 3x E-7 atm.cc/sec on 5 minutes 50 psi helium testing. Leak check result wasgood at NHC by helium spray method. We decided to apply water to HS and all other water lines still. The vacuum status is closely being watched. So far, TCS pumping down trend is still good. HS line supply water valve was switched on and off couple of times at TCS IG1 1.15 XE-6 range, and no vacuum spike was observed. More information will be logged in during the TM4 and target conditioning stage at TCS. 

  2341   Tuesday, June 28, 2022, 14:13 Frank SongITEStandard OperationTM4Ta#64Module Connection

 TM4 with Ta#64 was connected in ITE. see attachment please.

Attachment 1: tm4_with_Ta#64_connection_in_ITE.jpg
tm4_with_Ta#64_connection_in_ITE.jpg
  2353   Tuesday, August 09, 2022, 12:19 Frank SongITEStandard OperationTM4Ta#64TM4 with Ta#64 disconnection in ITE

 TM4 with Ta#64 has been disconnected in ITE.

Attachment 1: TM4_with_Ta#64_disconnection_in_ITE.jpeg
TM4_with_Ta#64_disconnection_in_ITE.jpeg
  2357   Thursday, August 18, 2022, 10:13 Travis CaveSpent Target VaultStandard Operation Ta#64Spent Target Move

 The spent Ta#64 target in the north hot cell has been packaged and placed in the spent target vault. Pail#273 spot #5C 86.6mSv/hr upon removal from the north hot cell. For detail on the vault see attached PDF.

Attachment 1: Target_Index_2022-08-18.pdf
Target_Index_2022-08-18.pdf
  2277   Thursday, November 25, 2021, 10:33 David WangConditioning StationStandard OperationTM4Ta#63. helium pressure test on TM4 HS line at TCS.

Helium pressure test on TM4 HS line at TCS is done.  LD base leak rate 0.0 xE-9 atm.cc/sec. Helium pressure 70psi. HS line had been helium pressurized for 5 minutes during the test. No response on LD. HS line with Ta#63 is leak free.

  2280   Tuesday, November 30, 2021, 11:03 David WangITEStandard OperationTM4Ta#63.Remotely remove TM4(Ta#63) from TCS to ITE.

Remotely remove TM4(Ta#63) from TCS to ITE. The move is smooth and successful.

  2281   Tuesday, November 30, 2021, 12:51 David WangITEStandard OperationTM4Ta#63.Tm4 has been connected in ITE.

TM4 has been connected in ITE. See attachment for checklist.

Attachment 1: from_my_cellphone_2598_647.jpg
from_my_cellphone_2598_647.jpg
Attachment 2: from_my_cellphone_2598_648.jpg
from_my_cellphone_2598_648.jpg
Attachment 3: from_my_cellphone_2598_649.jpg
from_my_cellphone_2598_649.jpg
Attachment 4: from_my_cellphone_2598_650.jpg
from_my_cellphone_2598_650.jpg