ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
Text |
|
313
|
Tuesday, April 23, 2013, 11:19 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | N/A | HV Test All common | A HV test was conducted yesterday
on TM3. There was no target and all items
were tied to common or ground. The conductivity |
|
314
|
Tuesday, April 23, 2013, 13:48 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | N/A | EL testing | This morning the Einzel Lens was tested
on TM3 as the intention is to reuse this
piece of equipment. The EL was able to achieve |
|
315
|
Tuesday, April 23, 2013, 15:52 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | N/A | Further HV Testing | Further HV testing was completed
today from ~2:00 until 3:00. The resistivity
of the water was 11.7 - 12.7 Mohm. The EE |
|
316
|
Tuesday, April 23, 2013, 15:59 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | N/A | Systems off | Both the Cooling Package and
Vacuum have been turned off in preparation
for the module move tomorrow |
|
317
|
Tuesday, April 23, 2013, 16:11 |
Bevan Moss | Conditioning Station | Maintenance | TM3 | N/A | Chiller Fault 2 | During Testing it was noticed that
Fault 2 was indicated and one of the compressors
would not run. Fault 2 does not indicate |
|
319
|
Wednesday, April 24, 2013, 10:14 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | no target | module move | TM#3 has been moved from the conditioning
station to the south hot cell, move went
well. |
|
321
|
Wednesday, April 24, 2013, 11:48 |
chad fisher | South Hot-Cell | Repair | TM3 | | TM3 Source Tray Removal | Work on TM3 source tray removal started
at 10:40 am today.
The containment box has been removed, |
|
322
|
Wednesday, April 24, 2013, 14:09 |
chad fisher | South Hot-Cell | Repair | TM3 | | TM3 Refurbishment E.O.D. | Optics tray has been removed from module.
Waterblock jig installation has commenced.
Of note, jig installation on TM3 has proven |
|
323
|
Friday, April 26, 2013, 11:20 |
chad fisher | South Hot-Cell | Repair | TM3 | | Water Block Jig (back half) | The back half of the water block jig (services
tray side) has been sucessfully located onto
the module. |
|
324
|
Friday, April 26, 2013, 14:31 |
chad fisher | South Hot-Cell | Repair | TM3 | | TM3 refurb E.O.D. | Service tray side of the waterblock jig
is installed and all locking tabs enagaed
save the heat shield circuit. Locking tab |
|
325
|
Monday, April 29, 2013, 15:58 |
Bevan Moss | South Hot-Cell | Repair | TM3 | | Source Tray Removal | Chad removed the source tray from TM3 today,
see attached picture (video was also taken).
There was some interference between the window |
|
326
|
Tuesday, April 30, 2013, 07:47 |
chad fisher | South Hot-Cell | Repair | TM3 | | TM3 Source Tray Removal | The source tray has sucessfully been removed
from TM3.
I will put a report in the TM3 rev |
|
327
|
Tuesday, April 30, 2013, 07:51 |
chad fisher | South Hot-Cell | Repair | TM3 | | Coil line flow check | David and I checked circuits p and q (the
water cooled coil ciruit) for flow this morning
as, with the source tray still in the module, |
|
328
|
Thursday, May 02, 2013, 10:09 |
chad fisher | South Hot-Cell | Repair | TM3 | | Service tray water block leak check | David and I preformed a helium leak check
on the service tray waterblocks and verify
that no damage had been done during jig installation. |
|
329
|
Friday, May 03, 2013, 09:53 |
chad fisher | South Hot-Cell | Repair | TM3 | | 9 pin connector wiring | With the aid of nic new manipulator snap
fingers made by Maico the peek cable ties
restraining the 9 pin connector wiring to |
|
330
|
Monday, May 06, 2013, 15:45 |
Bevan Moss | Conditioning Station | Repair | TM3 | | 55 pin connector removed | Travis and I removed the 55 pin connector
from the service cap today. The feed through
was left in place as a new design for the |
|
332
|
Wednesday, May 08, 2013, 10:12 |
chad fisher | South Hot-Cell | Repair | TM3 | | TM3 9 pin wiring removal | The 9 pin wiring has successfully been
removed from TM3. |
|
333
|
Wednesday, May 08, 2013, 13:48 |
chad fisher | South Hot-Cell | Repair | TM3 | | IMG wiring check | Checks of the wiring for the IMG are complete
and have passed. |
|
335
|
Thursday, May 09, 2013, 14:23 |
chad fisher | South Hot-Cell | Repair | TM3 | | Water Block Jig Removal | The source tray side of the water block
jig has been removed in preparation for moving
the module to the conditioning station |
|
336
|
Friday, May 10, 2013, 09:26 |
chad fisher | South Hot-Cell | Repair | TM3 | | Containment box reinstalled | the containment box has been reinstalled
onto TM3. After electrical checks it is ready
to move to the conditioning station...for |
|