  ID Date Author Category Type Moduledown Target/Number Subject Text Attachments
  2791   Wednesday, April 23, 2025, 14:08 Adam NewsomeNorth Hot-CellStandard OperationTM4 TM4 Module MoveTM4 was moved from Safe Module Parking
to the North Hot Cell today. 
  
  2792   Thursday, April 24, 2025, 11:13 Frank SongNorth Hot-CellStandard OperationTM4UCx#48electrical check/leak check TM4 with new target UCx#48 installed
was E/L checked on the top of NHC, see attachment
uploaded with pls.
 TM4_electric_and_leak_checked_after_UCx#48_IG-LIS_installed_in_NHC_2025-04-23.pdf 
  2794   Thursday, April 24, 2025, 12:53 Aaron TamNorth Hot-CellStandard OperationTM4UC#48UC#48 IGLIS Install onto TM4C. Fisher, A. Schmidt, A. Tam
UC#48 Handover satisfactory

    Target taken out of glovebox
 Misaligned_target_leg.jpg86b48e1a-3507-4650-864b-841e638ab62e.jpg 
  2797   Thursday, May 01, 2025, 09:33 Travis CaveITEStandard OperationTM4UC#48Module move TM#4 with UC#48 went from the conditioning
station  to the east target station.
  
  2800   Tuesday, May 06, 2025, 09:18 Frank SongITEStandard OperationTM4UCx#48Module Connection TM4 with first target UC#48 of this
year has been connected in ITE. see attachment
please.
 TM4_with_UC#48_connection_in_ITE_2025-05-01.pdf 
  2806   Wednesday, May 14, 2025, 09:45 Frank Song5 Shielding BlocksStandard OperationTM4UC#48 IGLISshielding blocks transfer 5 shielding blocks have been transferred
to ITE from storage area, the WP#I2025-05-14-2.
  
  2812   Tuesday, June 17, 2025, 11:32 Adam NewsomeNorth Hot-CellStandard OperationTM4UC#48Module moveTM#4 with UC#48 was moved from the East
target station to the North Hot Cell for
target exchange. 
  
  2813   Tuesday, June 17, 2025, 11:58 Frank SongITEStandard OperationTM4UC#48module disconnection TM4 with spent target UC#48 was disconnected
ang moved from ITE to NHC. see attachment
pls.
 TM4_with_spent_target_UC#48_disconnection_2025-06-17.pdf 
  2814   Tuesday, June 17, 2025, 12:59 Frank SongNorth Hot-CellStandard OperationTM4C#5electrical check/leak check TM4 with new target number C#5 installed
had been leak/electric checked on NHC flange
in TH. see pic attached with pls.
 TM4_electric_and_leak_check_after_C#5_installed_2025-06-17.pdf 
  2815   Wednesday, June 18, 2025, 09:28 Travis CaveConditioning StationStandard OperationTM4C#5Module move TM#4 with C#5 moved from the NHC
to the conditioning station.
  
  129   Wednesday, June 20, 2012, 11:39 Grant MinorSouth Hot-CellDevelopmentTM3N/ATM3 Planned Activites at South Hot Cell Jun 20 to 29 2012

Normal
0




false
false
false
  
  130   Thursday, June 21, 2012, 14:00 Travis CaveSouth Hot-CellRepairTM3no targetmodule moveTM#3 has been moved from the south west
silo to the south hot cell for the start
of its second refurb/repair. The fields of
  
  131   Thursday, June 21, 2012, 14:30 chad fisherSouth Hot-CellRepairTM3N/ATM3 Refurbishment StartStarted refurb of TM3.
Planned activities:
Inspection
  
  132   Thursday, June 21, 2012, 14:33 chad fisherSouth Hot-CellRepairTM3N/APictures TM3 June 21stHere are the pictures from today...there
is video too but it is not uploaded yet.
 8x 
  133   Monday, June 25, 2012, 07:53 chad fisherSouth Hot-CellRepairTM3N/ATM3 Refurb. WorkOn Friday, June 22 the following work was
carried out.

    Further inspection of
  
  135   Tuesday, June 26, 2012, 14:10 David WangSouth Hot-CellRepairTM3 TM3 heat shield and window circuits leak check is done.Chad and i did a leak check on TM3 heat
shield and window circuits.Both circuits
are pumped easily down to the bottom leak
  
  297   Monday, April 15, 2013, 11:00 chad fisherSouth Hot-CellStandard OperationTM3 Items for TM3 dummy target installationNew gaskets and fasteners have been inserted
into the south hot cell in preparation for
installing the dummy target onto TM3 tomorrow.
  
  298   Tuesday, April 16, 2013, 11:10 Travis CaveSouth Hot-CellStandard OperationTM3no targetmodule moveTM#3 has been moved from the NE Silo to
the south hot cell, move went well.
  
  299   Tuesday, April 16, 2013, 11:20 chad fisherSouth Hot-CellRepairTM3 TM3 Referb. startFront containment box cover has been removed
and heat shield circuit blank offs removed
in preparation for installation of dummy
 IMG_3523.JPGIMG_3524.JPG 
  300   Wednesday, April 17, 2013, 09:02 chad fisherSouth Hot-CellRepairTM3 TM3 ready for conditioning stationThe heat shield circuit blank offs have
been re-installed and front cover replaced.
TM3 is ready to move to the conditioning
  