2791
|
Wednesday, April 23, 2025, 14:08 |
Adam Newsome | North Hot-Cell | Standard Operation | TM4 | | TM4 Module Move | TM4 was moved from Safe Module Parking
to the North Hot Cell today. |
|
2792
|
Thursday, April 24, 2025, 11:13 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | UCx#48 | electrical check/leak check | TM4 with new target UCx#48 installed
was E/L checked on the top of NHC, see attachment
uploaded with pls. |
|
2794
|
Thursday, April 24, 2025, 12:53 |
Aaron Tam | North Hot-Cell | Standard Operation | TM4 | UC#48 | UC#48 IGLIS Install onto TM4 | C. Fisher, A. Schmidt, A. Tam
UC#48 Handover satisfactory
Target taken out of glovebox |
 |
2797
|
Thursday, May 01, 2025, 09:33 |
Travis Cave | ITE | Standard Operation | TM4 | UC#48 | Module move | TM#4 with UC#48 went from the conditioning
station to the east target station. |
|
2800
|
Tuesday, May 06, 2025, 09:18 |
Frank Song | ITE | Standard Operation | TM4 | UCx#48 | Module Connection | TM4 with first target UC#48 of this
year has been connected in ITE. see attachment
please. |
|
2806
|
Wednesday, May 14, 2025, 09:45 |
Frank Song | 5 Shielding Blocks | Standard Operation | TM4 | UC#48 IGLIS | shielding blocks transfer | 5 shielding blocks have been transferred
to ITE from storage area, the WP#I2025-05-14-2. |
|
2812
|
Tuesday, June 17, 2025, 11:32 |
Adam Newsome | North Hot-Cell | Standard Operation | TM4 | UC#48 | Module move | TM#4 with UC#48 was moved from the East
target station to the North Hot Cell for
target exchange. |
|
2813
|
Tuesday, June 17, 2025, 11:58 |
Frank Song | ITE | Standard Operation | TM4 | UC#48 | module disconnection | TM4 with spent target UC#48 was disconnected
ang moved from ITE to NHC. see attachment
pls. |
|
2814
|
Tuesday, June 17, 2025, 12:59 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | C#5 | electrical check/leak check | TM4 with new target number C#5 installed
had been leak/electric checked on NHC flange
in TH. see pic attached with pls. |
|
129
|
Wednesday, June 20, 2012, 11:39 |
Grant Minor | South Hot-Cell | Development | TM3 | N/A | TM3 Planned Activites at South Hot Cell Jun 20 to 29 2012 |
Normal
0
false
false
false
|
|
130
|
Thursday, June 21, 2012, 14:00 |
Travis Cave | South Hot-Cell | Repair | TM3 | no target | module move | TM#3 has been moved from the south west
silo to the south hot cell for the start
of its second refurb/repair. The fields of |
|
131
|
Thursday, June 21, 2012, 14:30 |
chad fisher | South Hot-Cell | Repair | TM3 | N/A | TM3 Refurbishment Start | Started refurb of TM3.
Planned activities:
Inspection |
|
132
|
Thursday, June 21, 2012, 14:33 |
chad fisher | South Hot-Cell | Repair | TM3 | N/A | Pictures TM3 June 21st | Here are the pictures from today...there
is video too but it is not uploaded yet. |
8x |
133
|
Monday, June 25, 2012, 07:53 |
chad fisher | South Hot-Cell | Repair | TM3 | N/A | TM3 Refurb. Work | On Friday, June 22 the following work was
carried out.
Further inspection of |
|
135
|
Tuesday, June 26, 2012, 14:10 |
David Wang | South Hot-Cell | Repair | TM3 | | TM3 heat shield and window circuits leak check is done. | Chad and i did a leak check on TM3 heat
shield and window circuits.Both circuits
are pumped easily down to the bottom leak |
|
297
|
Monday, April 15, 2013, 11:00 |
chad fisher | South Hot-Cell | Standard Operation | TM3 | | Items for TM3 dummy target installation | New gaskets and fasteners have been inserted
into the south hot cell in preparation for
installing the dummy target onto TM3 tomorrow. |
|
298
|
Tuesday, April 16, 2013, 11:10 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | no target | module move | TM#3 has been moved from the NE Silo to
the south hot cell, move went well. |
|
299
|
Tuesday, April 16, 2013, 11:20 |
chad fisher | South Hot-Cell | Repair | TM3 | | TM3 Referb. start | Front containment box cover has been removed
and heat shield circuit blank offs removed
in preparation for installation of dummy |
 |
300
|
Wednesday, April 17, 2013, 09:02 |
chad fisher | South Hot-Cell | Repair | TM3 | | TM3 ready for conditioning station | The heat shield circuit blank offs have
been re-installed and front cover replaced.
TM3 is ready to move to the conditioning |
|
301
|
Wednesday, April 17, 2013, 09:26 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | no target | Electrical check | Electrical check was performed on TM#3
with no target nothing was wrong was found,
but our megger does not go above 1000 volts |
 |