Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC, Page 36 of 140  Not logged in ELOG logo
ID Date Author Category Type Module Target/Numberdown Subject Text Attachments
  567   Wednesday, December 04, 2013, 11:05 David WangITWStandard OperationTM4Ta41#I disconnected TM4 in ITWI disconnected TM4 in ITW .The job took
about 20minutes and I got 0.11 msv dose.
  
  119   Wednesday, June 06, 2012, 14:33 David WangSouth Hot-CellStandard OperationTM1Ta38leak check heat shield circuitChad and I did a leak check on heat shield
circuit after target is installed on TM1.The
leak detector pumping down is smooth. The
  
  120   Thursday, June 07, 2012, 11:58 Bevan MossConditioning StationStandard OperationTM1Ta38Module Move from SHC to TCSTM1 was moved from SHC to the TCS. The
mode took roughly 1 hour. During the move
the north east corner of the containment
  
  121   Friday, June 08, 2012, 11:07 David WangConditioning StationStandard OperationTM1Ta38conditioning staion and TM1 is under TP1 and TP2 pumping now.I connected vacuum system to TM1 and conditioning
station and started two turbo pumps yesterday.
The pumping an d vacuum readings  are
  
  123   Friday, June 08, 2012, 15:03 Don JacksonSouth Hot-CellStandard OperationTM1Ta38Electrical Check on new Ta38 at hot cellMegger checks were exceptionally high (good). 
Readings taken less than 2 hours after reading low
values from end of run on Nb#6.  Tests
 Ta38_New_Target.JPG 
  126   Monday, June 11, 2012, 14:41 David WangConditioning StationStandard OperationTM1Ta38Heat shield helium pressure testConnected leak detector to TM1 and CS vacuum
system. The vacuum readings on TM1 and CS:PNG1
1.3 xE-6 Torr, IG1 4.7xE-7torr, IG4(diagnostic
  
  128   Tuesday, June 19, 2012, 16:18 David WangITWStandard OperationTM1Ta38TM1connected in ITW
 

 Normal
  0

 
   
  
  151   Tuesday, July 31, 2012, 09:52 David WangITWStandard OperationTM1Ta38TM1 disconnected in ITWI disconnected TM1 in ITW.  Heat shield
line has been purged .
  
  8   Tuesday, July 19, 2011, 12:25 maicodallavalleSouth Hot-CellStandard OperationTM4Ta36TM4 Ta36 Target was put into the south hot cell.Ta36 was check by Maico and Chad.It was
then carried into the anteroom.From the anteroom
it was transferred into the south hot cell.
  
  2700   Tuesday, October 08, 2024, 11:46 David WangITEStandard OperationTM2Ta#68.Tm2 has been moved form SHC to ITE.Tm2 has been moved form SHC to ITE. The
move is smooth. 
  
  2675   Friday, September 06, 2024, 14:28 Aaron TamSouth Hot-CellStandard Operation Ta#68(Spare)Ta#68(Spare) removed from TM4 and into Anteroom September 5, 2024 -AT

    Plastic and clean target
tray added to SHC 
    TM4
  
  2664   Friday, August 16, 2024, 15:32 Aaron TamSouth Hot-CellStandard OperationTM4Ta#68 LP-SISTarget Ta#68 loaded onto TM4  Target Ta#68 loaded onto TM4 
-leak check passed
-Target electrode conductor screws
 Ta-68_Installed.jfif 
  2665   Monday, August 19, 2024, 09:32 David WangConditioning StationStandard OperationTM4Ta#68 TM4 has been moved from SHC to TCS.TM4 has been moved from SHC to TCS. The
move is successful. 
  
  2662   Friday, August 16, 2024, 13:29 Frank SongSouth Hot-CellStandard OperationTM4Ta#68electrical check/leak check New target Ta#68 is installed on
TM4 and be leak/electric checked. Pls see
attachment.
 TM4_with_Ta#68_electric_and_leak_check_on_SHC_2028-08-16.pdf 
  2698   Tuesday, October 08, 2024, 11:20 Aaron TamSouth Hot-CellStandard OperationTM2Ta#68Ta#68 install onto TM2, w/ Troubleshooting October 7, 2024 - Aaron Tam 
Ta#68 HP-SIS checks performed at
B1 lab, moved to anteroom, and inserted into
 17x 
  2701   Wednesday, October 09, 2024, 14:04 Frank SongITEStandard OperationTM2Ta#68Module Connection TM2 with new target Ta#68 installed
is connected in ITE. Pls see form attached.
 TM2_with_new_target_Ta#68_connection_in_ITE.pdf 
  2725   Tuesday, December 03, 2024, 10:10 Frank SongITEStandard OperationTM2Ta#68module disconnectionTM2 with spent target TA#68 was disconnected 
in ITE and is being moved to SHC. All water
lines are purged for module storage.
 TM2_with_spent_target_TA#68_disconnection_in_ITE_2024-12-03.pdf 
  2728   Tuesday, December 03, 2024, 15:53 Aaron TamSouth Hot-CellStandard OperationTM2Ta#68Ta#68 Removal  Note: Ta#68 had a difficult
install. See E-log ID# 2698 for more info 
First look:
 22x 
  2732   Wednesday, December 04, 2024, 14:30 Aaron TamSouth Hot-CellStandard Operation Ta#68Ta#68 PIE Abstract:
This target has seen some irregular
beam patterns 
 32x 
  2733   Thursday, December 05, 2024, 11:43 Aaron TamSouth Hot-CellStandard Operation Ta#68 Pail loading - Ta#68 & Others into Pail#300December 5, 2024 - Aaron Tam w/ help from
Chad, Peter and Adam at the Crane  
Hot Cell Prep:
 Pail_Landing.jpgLoaded_Pail.jpgParasitic_Lid_that_was_missed.jpgLocation_of_all_parasitic_type_targets_and_fasteners.jpgParastics_and_Target_stuff_that_went_inside_this_pail.jpg 
ELOG V2.9.2-2455