  121   Friday, June 08, 2012, 11:07 David WangConditioning StationStandard OperationTM1Ta38conditioning staion and TM1 is under TP1 and TP2 pumping now.

I connected vacuum system to TM1 and conditioning station and started two turbo pumps yesterday. The pumping an d vacuum readings  are verg good so far(all below 5xE-6 torr). Helium pressure test on heat shield circuit will be fulfilled next week.

  123   Friday, June 08, 2012, 15:03 Don JacksonSouth Hot-CellStandard OperationTM1Ta38Electrical Check on new Ta38 at hot cell

Megger checks were exceptionally high (good).  Readings taken less than 2 hours after reading low values from end of run on Nb#6.  Tests on Ta38 will be repeated at conditioning station later.

Attachment 1: Ta38_New_Target.JPG
Ta38_New_Target.JPG
  126   Monday, June 11, 2012, 14:41 David WangConditioning StationStandard OperationTM1Ta38Heat shield helium pressure test

Connected leak detector to TM1 and CS vacuum system. The vacuum readings on TM1 and CS:PNG1 1.3 xE-6 Torr, IG1 4.7xE-7torr, IG4(diagnostic box)1.5xE-6 Torr. Leak detector base pressure:0.0xE-4 torr, base leak rate: 0.0xE-9 atm.cc/sec. Applied 80 psi helium to heat shield circuit for 5 mins . There is no response on leak detector. The heat shield circuit is leak tight.

  128   Tuesday, June 19, 2012, 16:18 David WangITWStandard OperationTM1Ta38TM1connected in ITW

 We moved TM1 to ITW today, I connected TM1 to ITW, and started all turbo pumps this afternoon. TP4s is very difficult to bring to 38 KRMP now. I have to use soft start model and tried twice to get this pump started (1.5 hours). This pump always had a difficult start time during the past 2-3 runs. I talked with Friedhelm and we think it should be replaced after this run. I will issue an e-fault on this pump and try to get a new pump from vacuum group. It will take 2 hours to change this pump. I could do this job with another person help. Or, vacuum group could do it. Don can schedule a time for this job before next run. Anyway, it should work fine for this run.  The water interlock check related to TM1 is done. I will do the rest before blocks on. All TM1 water signals are strong and good. All vacuum gauge readings are good so far(below5.0xe-5 torr).

 

  151   Tuesday, July 31, 2012, 09:52 David WangITWStandard OperationTM1Ta38TM1 disconnected in ITW

I disconnected TM1 in ITW.  Heat shield line has been purged .

  8   Tuesday, July 19, 2011, 12:25 maicodallavalleSouth Hot-CellStandard OperationTM4Ta36TM4 Ta36 Target was put into the south hot cell.

Ta36 was check by Maico and Chad.It was then carried into the anteroom.From the anteroom it was transferred into the south hot cell.

  2700   Tuesday, October 08, 2024, 11:46 David WangITEStandard OperationTM2Ta#68.Tm2 has been moved form SHC to ITE.

Tm2 has been moved form SHC to ITE. The move is smooth.

  2675   Friday, September 06, 2024, 14:28 Aaron TamSouth Hot-CellStandard Operation Ta#68(Spare)Ta#68(Spare) removed from TM4 and into Anteroom

September 5, 2024 -AT

  • Plastic and clean target tray added to SHC 
  • TM4 moved to SHC 
  • TM4 containment box cover removed

September 6, 2024 - AT

  • Ta#68(Spare) removed from TM4 onto clean tray 
    • top left mounting bolt fell under source tray in containment box - unretrievable
  • Ta#68(Spare) moved out of SHC via toolport door 
    • SHC lift table was lower than tool port tunnel by 2". Target-on-Tray slipped back onto lift table when trying to drag it up to the tool port. Target bounced out of one locating pin, but stayed within boundaries of the tray 
    • Water also leaked out from the VCR fitting and on to the SHC lift table, and toolport. 
  • Target-on-tray slid into a clean plastic bag, and then into a plastic box. 

 September 9, 2024 - AT

  • Ta#68(Spare) taken out of plastic bag and water drained from waterlines
    • Target was rotated in every direction several times until no more water poured out from the VCR joints
  • Ta#68(Spare) put back in box without the bag (to promote evaporation) 

 

  2664   Friday, August 16, 2024, 15:32 Aaron TamSouth Hot-CellStandard OperationTM4Ta#68 LP-SISTarget Ta#68 loaded onto TM4

 Target Ta#68 loaded onto TM4 

-leak check passed

-Target electrode conductor screws torqued to 130 in-lbs

-electrical check passed

Containment box cover re-installed 

photo attached 

Attachment 1: Ta-68_Installed.jfif
  2665   Monday, August 19, 2024, 09:32 David WangConditioning StationStandard OperationTM4Ta#68 TM4 has been moved from SHC to TCS.

TM4 has been moved from SHC to TCS. The move is successful.

  2662   Friday, August 16, 2024, 13:29 Frank SongSouth Hot-CellStandard OperationTM4Ta#68electrical check/leak check

 New target Ta#68 is installed on TM4 and be leak/electric checked. Pls see attachment.

Attachment 1: TM4_with_Ta#68_electric_and_leak_check_on_SHC_2028-08-16.pdf
TM4_with_Ta#68_electric_and_leak_check_on_SHC_2028-08-16.pdf
  2698   Tuesday, October 08, 2024, 11:20 Aaron TamSouth Hot-CellStandard OperationTM2Ta#68Ta#68 install onto TM2, w/ Troubleshooting

October 7, 2024 - Aaron Tam 

Ta#68 HP-SIS checks performed at B1 lab, moved to anteroom, and inserted into SHC via tool port w/ Aaron Schmidt. 

Ta#68 fixed to source tray with 4 mounting bolts in order of: Right manip. holding, Top left, Right manip. removed, Bottom right, Top right, bottom left. w/ Aaron Schmidt and Brady Borrmann

  • Motion was smooth, no resistance when positioning onto pins

VCR fittings done up with ample force, leak check passed

Conductor bolts installed in order of: 2 Target electrode conductors (Checked washers), 3 target Inner and outer conductors.

All bolts checked for full contact with mirror and binos. 

Electrical check failed: Dead short (look for David's ELOG for more detail when available) 

Troubleshooting while David is checking resistance: w/ Ferran

  • Intermittent success with heavy manipulation of water lines
    • Loosening off Waterline bracket-to-source-tray 
    • Loosening off Bracket to water line bolts 5/32 hex's 
    • Rotating bracket towards operator (effectively raising waterlines in the back upwards) seems to yield more intermittent success, but never passing megger @ 250V 
    • Tube was inadvertently dented when handling the tube in a wrenching motion with manip tong. counterclockwise
  • Target removed while David is still on the multimeter (calling for any sign of success)
    • Starting to remove Target in order of: Tightening back waterline-to-bracket 5/32 hex screws, loosening off waterline bracket, loosening off VCR nuts, 2 Target electrode conductor bolts, 3 Target inner and outer conductor bolts, Fixing bolts Top left (dropped below source tray), Bottom right...
      • (At this time David called with some success with electrical check)
    • Reversing course to verify fault has passed, target was reassembled, only finger loose on the VCR nuts.
    • Faults no longer present
    • Target removed
      •  As target was being pulled off source tray locating pins, a piece of ceramic fell onto the source tray just behind window waterlines.

Target taken out of Hotcell by Ferran. New VCR gaskets installed. Target reinserted 

Target installed no issues. Used fixing bolt used to replace dropped one. 

Leak check passed, Electrical check passed

  • Notably don't have a photo of reinstalled target or source tray before 2nd install attempt. 

Containment cover reinstalled 

Ceramic piece moved into Pail #285 (suspect this is a very hot piece)

TM2 ready for move to ITE

Attachment 1: 1st_Install_Leak_check_passed.jfif
Attachment 2: 1st_Install_Complete_waiting_for_electrical_check.jfif
Attachment 3: Troubleshooting_1st_install_(dent_in_tube_visible).jfif
Attachment 4: Water_Line_Dent_Face.jfif
Attachment 5: Water_Line_Dent_profile.jfif
Attachment 6: Waterline_alignment_after_removing_VCR_connection.jfif
Attachment 7: Ceramic_piece_fell_untouched_position.jfif
Attachment 8: Ceramic_Piece.jfif
Attachment 9: 285_Pail_location.jfif
Attachment 10: Closer_look_Below_Target_between_electrodes.jfif
Attachment 11: Closer_Look_Taget_Electrode_Conductor_LEFT_(2).jfif
Attachment 12: Closer_Look_Taget_Electrode_Conductor_LEFT.jfif
Attachment 13: Closer_Look_Taget_Electrode_Conductor_RIGHT_(2).jfif
Attachment 14: Closer_Look_Taget_Electrode_Conductor_RIGHT.jfif
Attachment 15: Closer_Look_Target_Inner_and_Outer_conductors.jfif
Attachment 16: Closer_Look_waterline_bracket_after_manipulation.jfif
Attachment 17: TM2_Cover_Closed_completed_ready_for_move.jfif
  2701   Wednesday, October 09, 2024, 14:04 Frank SongITEStandard OperationTM2Ta#68Module Connection

 TM2 with new target Ta#68 installed is connected in ITE. Pls see form attached.

Attachment 1: TM2_with_new_target_Ta#68_connection_in_ITE.pdf
TM2_with_new_target_Ta#68_connection_in_ITE.pdf TM2_with_new_target_Ta#68_connection_in_ITE.pdf TM2_with_new_target_Ta#68_connection_in_ITE.pdf TM2_with_new_target_Ta#68_connection_in_ITE.pdf
  2725   Tuesday, December 03, 2024, 10:10 Frank SongITEStandard OperationTM2Ta#68module disconnection

TM2 with spent target TA#68 was disconnected  in ITE and is being moved to SHC. All water lines are purged for module storage.

Attachment 1: TM2_with_spent_target_TA#68_disconnection_in_ITE_2024-12-03.pdf
TM2_with_spent_target_TA#68_disconnection_in_ITE_2024-12-03.pdf TM2_with_spent_target_TA#68_disconnection_in_ITE_2024-12-03.pdf TM2_with_spent_target_TA#68_disconnection_in_ITE_2024-12-03.pdf
  2728   Tuesday, December 03, 2024, 15:53 Aaron TamSouth Hot-CellStandard OperationTM2Ta#68Ta#68 Removal

  Note: Ta#68 had a difficult install. See E-log ID# 2698 for more info 

First look:

  • Containment box cover looks the same as previous (See:ID: 2697)
  • Target shows large amount of soot-like deposits (See photos for locations)
  • Deposits seem to have been left on parts of the service tray as well ie.: Multipin connector 

Removal:

  • Removal was smooth
  • Water-line bracket fixing bolts seemed loose even before I put a tool to them 

Eyes of sides:

  • Better photos of where deposits are 
  • Everything else seems normal 
Attachment 1: Containment_Cover_Internal.jpg
Containment_Cover_Internal.jpg
Attachment 2: First_Look.jpg
First_Look.jpg
Attachment 3: First_look_Water_Lines_and_bracket.jpg
First_look_Water_Lines_and_bracket.jpg
Attachment 4: First_look_Water_Lines_and_bracket.jpg
First_look_Water_Lines_and_bracket.jpg
Attachment 5: First_Look_water_line_bracket_closer.jpg
First_Look_water_line_bracket_closer.jpg
Attachment 6: First_Look_Triplet_Conductos.jpg
First_Look_Triplet_Conductos.jpg
Attachment 7: Triplet_conductors_2.jpg
Triplet_conductors_2.jpg
Attachment 8: Multi_Pin.jpg
Multi_Pin.jpg
Attachment 9: Top.jpg
Top.jpg
Attachment 10: Top_Closer.jpg
Top_Closer.jpg
Attachment 11: Top_Closer_(2).jpg
Top_Closer_(2).jpg
Attachment 12: Right.jpg
Right.jpg
Attachment 13: Left.jpg
Left.jpg
Attachment 14: Bottom.jpg
Bottom.jpg
Attachment 15: Bottom_Closer.jpg
Bottom_Closer.jpg
Attachment 16: Extraction_electrode.jpg
Extraction_electrode.jpg
Attachment 17: Extraction_electrode2.jpg
Extraction_electrode2.jpg
Attachment 18: Extraction_electrode3.jpg
Extraction_electrode3.jpg
Attachment 19: Extraction_electrode4.jpg
Extraction_electrode4.jpg
Attachment 20: Deposit.jpg
Deposit.jpg
Attachment 21: Deposit2.jpg
Deposit2.jpg
Attachment 22: Deposit_3.jpg
Deposit_3.jpg
  2732   Wednesday, December 04, 2024, 14:30 Aaron TamSouth Hot-CellStandard Operation Ta#68Ta#68 PIE

 Abstract:
This target has seen some irregular beam patterns 
Possibility that the beam hit the walls of the target tube or even the cooling fins
This PIE we want to investigate how the irregular beam physically affected the target 

Related ELOGS: 
ID: 2728
ID: 2698

PIE was performed by Aaron Tam, Directed by Aurelia Laxdal, Observed by Lucas Backes, Special help from Chad Fisher 

External views:

  • Windows are clear of any irregularities 
  • More pictures of this can be found in RH-ISAC E-log 2728

Internal Views:

  • Heatshield internal
    • Some discolouration from heat and soot deposits.
    • This seems to be fairly clean to normal amounts - not concerning 
  • Target tube
    • tube is bent with the middle higher than the sides
    • Target tube was not removed 9/64ths allen wrench could not be located for this operation 
  • Target tube Exit
    • Heatshield windows were punctured to reveal the target tube entraces/exits
    • Entrance is waterline side (ITE)
  • Extraction electrode parts were removed from the back off the target
    • These parts look normal
    • some of the extraction electrode would not pull out due to tight fitting parts and the investigation stopped here.

Conclusion: Target physical condition is normal as far as we could investigate 

Attachment 1: Waterline_disconnect.jpg
Waterline_disconnect.jpg
Attachment 2: Heatshield_inside.jpg
Heatshield_inside.jpg
Attachment 3: Target_tube_first_look.jpg
Target_tube_first_look.jpg
Attachment 4: Heatshield2.jpg
Heatshield2.jpg
Attachment 5: Heatshield3.jpg
Heatshield3.jpg
Attachment 6: Target_tube_2.jpg
Target_tube_2.jpg
Attachment 7: Target_tube_3.jpg
Target_tube_3.jpg
Attachment 8: Couldn't_undo_this_bolt.jpg
Couldn't_undo_this_bolt.jpg
Attachment 9: Exit_tube.jpg
Exit_tube.jpg
Attachment 10: Exit_tube2.jpg
Exit_tube2.jpg
Attachment 11: Exit_tube3.jpg
Exit_tube3.jpg
Attachment 12: Exit_tube4.jpg
Exit_tube4.jpg
Attachment 13: Exit_tube5.jpg
Exit_tube5.jpg
Attachment 14: Exit_tube6.jpg
Exit_tube6.jpg
Attachment 15: Exit_tube7.jpg
Exit_tube7.jpg
Attachment 16: Exit_tube8.jpg
Exit_tube8.jpg
Attachment 17: Exit_tube9.jpg
Exit_tube9.jpg
Attachment 18: Exit_tube10.jpg
Exit_tube10.jpg
Attachment 19: entrance_tube.jpg
entrance_tube.jpg
Attachment 20: entrance_tube2.jpg
entrance_tube2.jpg
Attachment 21: entrance_tube3.jpg
entrance_tube3.jpg
Attachment 22: entrance_tube4.jpg
entrance_tube4.jpg
Attachment 23: Exit_tube5.jpg
Exit_tube5.jpg
Attachment 24: entrance_tube6.jpg
entrance_tube6.jpg
Attachment 25: entrance_tube7.jpg
entrance_tube7.jpg
Attachment 26: entrance_tube8.jpg
entrance_tube8.jpg
Attachment 27: entrance_tube9.jpg
entrance_tube9.jpg
Attachment 28: entrance_tube10.jpg
entrance_tube10.jpg
Attachment 29: entrance_tube11.jpg
entrance_tube11.jpg
Attachment 30: Extraction_electrode.jpg
Extraction_electrode.jpg
Attachment 31: entrance_tube1.jpg
entrance_tube1.jpg
Attachment 32: Extraction_electrode2.jpg
Extraction_electrode2.jpg
  2733   Thursday, December 05, 2024, 11:43 Aaron TamSouth Hot-CellStandard Operation Ta#68 Pail loading - Ta#68 & Others into Pail#300

December 5, 2024 - Aaron Tam w/ help from Chad, Peter and Adam at the Crane  

Hot Cell Prep:

  • Tools organized, working space cleared, spot for clean tool to sit placed, Air tool is open and spinning clockwise for tightening 

Loading:

  • Ta#68 was loaded into pail# 300
  • PEEK seal parasitic assemblies loaded (PEEK seals were removed in ID: 2724)
  • Farran had some old samples that also went in (More details to come when Farran sends the info)

Lid/latching:

  • This went smoothly

Bail attachment:

  • Some difficulty in attaching the Lifting Bail, but went on smoothly with the help of Chad

Notes:

  • One of the PEEK seal parasitic Target assembly lids was missed in the loading. This will have to be loaded next time. 
  • All parasitic type targets remain in the yellow container shown in photos below. 
Attachment 1: Pail_Landing.jpg
Pail_Landing.jpg
Attachment 2: Loaded_Pail.jpg
Loaded_Pail.jpg
Attachment 3: Parasitic_Lid_that_was_missed.jpg
Parasitic_Lid_that_was_missed.jpg
Attachment 4: Location_of_all_parasitic_type_targets_and_fasteners.jpg
Location_of_all_parasitic_type_targets_and_fasteners.jpg
Attachment 5: Parastics_and_Target_stuff_that_went_inside_this_pail.jpg
Parastics_and_Target_stuff_that_went_inside_this_pail.jpg
  2734   Thursday, December 05, 2024, 12:00 Adam NewsomeSpent Target VaultStandard Operation Ta#68Spent target move - Ta#68 in Pail 300

Ta#68 spent target was moved in Pail 300 to storage vault location 5A. The dose rate measured at the South Hot Cell was 429 mSv/h at 1m. The target index spreadsheet has been updated and the current vault configuration is attached to this e-log. At this time, the storage vault is getting quite full - it is planned to remove five pails in January 2025.

Attachment 1: Storage_Vault_Contents_2024-12-05.pdf
Storage_Vault_Contents_2024-12-05.pdf
  2658   Tuesday, August 13, 2024, 14:23 David WangITEStandard OperationTM3Ta#67.TM2 with Ta#target has been moved from SHC to ITE.

TM2 with Ta#target has been moved from SHC to ITE. the move is smooth.

  2674   Friday, September 06, 2024, 10:01 David WangSouth Hot-CellStandard OperationTM4Ta#67 back up. TM4 has been moved from SMP to SHC.

TM4 has been moved from SMP to SHC. The move is smooth.