Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC, Page 36 of 138  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Author Category Type Moduledown Target/Number Subject
  2664   Friday, August 16, 2024, 15:32 Aaron TamSouth Hot-CellStandard OperationTM4Ta#68 LP-SISTarget Ta#68 loaded onto TM4

 Target Ta#68 loaded onto TM4 

-leak check passed

-Target electrode conductor screws torqued to 130 in-lbs

-electrical check passed

Containment box cover re-installed 

photo attached 

Attachment 1: Ta-68_Installed.jfif
  2665   Monday, August 19, 2024, 09:32 David WangConditioning StationStandard OperationTM4Ta#68 TM4 has been moved from SHC to TCS.

TM4 has been moved from SHC to TCS. The move is successful.

  2674   Friday, September 06, 2024, 10:01 David WangSouth Hot-CellStandard OperationTM4Ta#67 back up. TM4 has been moved from SMP to SHC.

TM4 has been moved from SMP to SHC. The move is smooth.

  2676   Tuesday, September 10, 2024, 12:41 Aaron TamSouth Hot-CellStandard OperationTM4TiC#9Target TiC#9 HP-SIS installed onto TM4

September 9, 2024 - Aaron Tam 

  • Water from waterline found puddled on source-tray and containment box. 
  • Water was wiped up as much as possible, but likely still in containment box 
  • leaving to dry overnight
  • Target inserted into Hotcell with nuts for the parasitic target. 4/4 socket nuts installed on upstream flange, and 3/4 installed on downstream flange

September 10, 2024 - Aaron Tam

  • TiC#9 HP-SIS installed onto TM4 
  • Leak check passed after retightening VCR joint
  • Target Electrode Conductor screws torqued to 130 inch-lbs 
  • Electrical test passed 
  • Containment box cover reinstalled

Photos attached

Attachment 1: 089c5872-091d-484b-9b9c-dda8444b217b.jfif
Attachment 2: 566cae27-5562-4934-b23a-5c99af810900.jfif
Attachment 3: cc853ae8-5896-46f3-9f21-f6ede8c82626.jfif
Attachment 4: ffdf443c-2656-499a-9d0a-01ddef2f954a.jfif
  2677   Tuesday, September 10, 2024, 12:41 Frank SongSouth Hot-CellStandard OperationTM4TiC#9 electrical check/leak check

 TM4 with new target TiC#9 Surface installed in SHC was leak/electric checked before moving to TCS. See attached pic pls.

Attachment 1: TM4_with_TiC#9_Surface_electric(leak)_cheak_on_SHC_2024-09-10.pdf
TM4_with_TiC#9_Surface_electric(leak)_cheak_on_SHC_2024-09-10.pdf
  2678   Wednesday, September 11, 2024, 07:59 David WangConditioning StationStandard OperationTM4TiC#9TM4 has been moved from SHC to TCS.

TM4 has been moved from SHC to TCS. The move is smooth.

  2683   Tuesday, September 17, 2024, 11:16 David WangITWStandard OperationTM4TiC#9TM4 has been moved from TCS to ITW.

TM4 has been moved from TCS to ITW. The move is smooth.

  2684   Tuesday, September 17, 2024, 13:42 Frank SongITWStandard OperationTM4TiC#9 Module Connection

 TM4 with target TiC#9 is connected in ITW. See attachment.

Attachment 1: TM4_with_TiC#9_connection_in_ITW_2024-09-17.pdf
TM4_with_TiC#9_connection_in_ITW_2024-09-17.pdf TM4_with_TiC#9_connection_in_ITW_2024-09-17.pdf TM4_with_TiC#9_connection_in_ITW_2024-09-17.pdf TM4_with_TiC#9_connection_in_ITW_2024-09-17.pdf
  2689   Monday, September 23, 2024, 11:35 David WangITWStandard OperationTM4TiC #9.vacuum leak check on TM4 service cap in ITW.

vacuum leak check on TM4 service cap in ITW was done this morning.   leak detector leak rate 0.0XE-9 atm.cc/sec. No leak on TM4 service cap module top.

  2710   Tuesday, November 05, 2024, 09:49 Frank SongITWStandard OperationTM4TiC#9 module disconnection

 TM4 with spent target TiC#9 was disconnected in 29-10-2024 and it is being moved from ITW to SHC.

Attachment 1: TM4_with_spent_target_TiC#9_disconnection_in_ITW_20241029.pdf
TM4_with_spent_target_TiC#9_disconnection_in_ITW_20241029.pdf TM4_with_spent_target_TiC#9_disconnection_in_ITW_20241029.pdf TM4_with_spent_target_TiC#9_disconnection_in_ITW_20241029.pdf
  2712   Wednesday, November 06, 2024, 08:29 Aaron TamSouth Hot-CellStandard OperationTM4TiC#9Target and Parasitic assemblies removal from TiC#9

November 5, 2024 - Aaron Tam

TiC#9 HP-SIS removed from TM4

  • Top left fixing bolt shows signs of heating on it (Comparison photos attached Bolt_profile.jfif  & Bolt_Tops.jfif)
  • Location and orientation of darker bolt (Darker_bolt.jfif)

Parasitic Targets Removed

  • Left target has residue left from ablation 

See photos attached for detail 

Attachment 1: Target_first_look.jfif
Attachment 2: Target_first_look_ETTR.jfif
Attachment 3: Inside_Panel.jfif
Attachment 4: Darker_bolt.jfif
Attachment 5: VCR_and_conductor_bolts_removed.jfif
Attachment 6: Top.jfif
Attachment 7: target_left.jfif
Attachment 8: Right.jfif
Attachment 9: Bottom.jfif
Attachment 10: Parasitic_Target_right.jfif
Attachment 11: Parasitic_Target_right_(2).jfif
Attachment 12: Left_side_without_parasitic.jfif
Attachment 13: Back_of_target_left.jfif
Attachment 14: Back_of_target_right.jfif
Attachment 15: Extraction_electrode.jfif
Attachment 16: Bolt_profile.jfif
Attachment 17: Bolt_Tops.jfif
  2713   Wednesday, November 06, 2024, 16:33 David WangSouth Hot-CellStandard OperationTM4UCX46TM4 with UCx46 electrical and leak check at SHC

TM4 with UCx46 electrical and leak check at SHC is done. Everything is good.

Attachment 1: TM4_UCx46_electrical_check.pdf
TM4_UCx46_electrical_check.pdf TM4_UCx46_electrical_check.pdf
  2715   Friday, November 08, 2024, 10:44 Aaron TamSouth Hot-CellStandard OperationTM4UCx#46UCx#46 Install and Parasitic Target Status

November 6, 2024 - Aaron Tam 

UCx#46 Target handover from TPO 

Target insertion: successful 

Parasitic Install: All Parasitic targets left off target

  • Left side In-beam array type parasitic install attempt #1 
    • Parasitic assembly is too thin/studs too tall for the socket nut to fasten onto target. Stud protrudes through the length of socket section, not allowing tool to insert 
    • previously a 3/4 spacer was used to give space for thermal couple to enter 
    • Install of 3/4 spacer was difficult because it does not hold its shape when handled (pivots around 1/2 ad 1/4 portions) 
    • With spacer installed, parasitic assembly is too thick for socket nuts to fasten onto studs. 
      • It may have been possible to back out studs to use, but left off in the interest of time UCx is exposed. 
  • Right side In-beam window type parasitic install
    • Similarly to Left side, studs were too short for install, studs could be backed out, but was left off in the interest of time UCx exposed
  • PEEK seal parasitic targets were left off as per schedule, and will be leak checked at another date (after tong cable has been repaired) 
    • Order of PEEK seal locations preserved and follows order as seen with target installed (Photo attached)

Target install: successful 

Leak Check: Successful 

Electrical Check: Successful 

  • Initially failed due to wiring diagram being different between production wiring diagram and electrical test sheet

Containment box panel closed 

 

 

Attachment 1: Left_side_Array_Parasitic_with_floppy_spacer.jfif
Attachment 2: Right_side_Window_Parasitic.jfif
Attachment 3: Lid_Parasitics_order.jfif
  2717   Tuesday, November 12, 2024, 12:30 Frank SongITWStandard OperationTM4UCx#46Module Connection

 TM4 with new target UCx#46 was moved from TCS to ITW and has been re-connected right after. see attachment pls.

Attachment 1: TM4_with_new_target_UCx#46_connection_in_ITW_2024-11-12.pdf
TM4_with_new_target_UCx#46_connection_in_ITW_2024-11-12.pdf TM4_with_new_target_UCx#46_connection_in_ITW_2024-11-12.pdf TM4_with_new_target_UCx#46_connection_in_ITW_2024-11-12.pdf TM4_with_new_target_UCx#46_connection_in_ITW_2024-11-12.pdf
  2719   Thursday, November 21, 2024, 14:11 Frank Song5 Shielding BlocksStandard OperationTM4UCx#46shielding blocks transfer

 Shielding blocks have been moved from ITE to ITW and MAA is secured.

  2739   Friday, January 03, 2025, 10:41 David WangITWStandard OperationTM4UCX46ITW primary and secondary vacuum vessel leak check for 2025 shut down

ITW primary and secondary vacuum vessel leak check for  2025 shut down has been done. Also,TM4 internal water line helium pressure test has been finished.  Both results are normal. There are two small old leak on EXit 1 and Exit2 module top plate  o-ring under 1Xe-8 atm.cc/sec which we knoew in past years test. resin spray on leak  area reduce the leak ratee below 5Xe-9 atm.cc/sec. No concern on these small leak.   See attachment  for detail results.

Attachment 1: ITW_primary_and_secondary_vacuum_leak_check_2025.pdf
ITW_primary_and_secondary_vacuum_leak_check_2025.pdf ITW_primary_and_secondary_vacuum_leak_check_2025.pdf
  2741   Monday, January 06, 2025, 08:38 Frank SongITWStandard OperationTM4UCx#46module disconnection

 TM4 WITH UCx#46 was disconnected in 2025-01-02 in ITW. Forms attached.

Attachment 1: TM4_with_UCx#46_disconnection_in_ITW_2025-01-02.pdf
TM4_with_UCx#46_disconnection_in_ITW_2025-01-02.pdf TM4_with_UCx#46_disconnection_in_ITW_2025-01-02.pdf TM4_with_UCx#46_disconnection_in_ITW_2025-01-02.pdf
  2743   Wednesday, January 08, 2025, 07:37 chad fisherSouth Hot-CellStandard OperationTM4UCx#46UCx#46 removal

UCx#46 removed from TM4 and placed into a pail back-filled with argon. Nothing visually unusual; no issues.

Attachment 1: TM4_UCx46_07012024.jpeg
TM4_UCx46_07012024.jpeg
Attachment 2: TM4_UCx46_2_07012024.jpeg
TM4_UCx46_2_07012024.jpeg
  2745   Thursday, January 09, 2025, 11:46 David WangSafe Module ParkingStandard OperationTM4No targetSMP is under vacuum for TM4 storage during shut down.

 SMP:MP1 is started with SMP BV1 is opened. SMP is under vacuum for TM4 storage during shut down.

  129   Wednesday, June 20, 2012, 11:39 Grant MinorSouth Hot-CellDevelopmentTM3N/ATM3 Planned Activites at South Hot Cell Jun 20 to 29 2012

(Copy of e-mail correspondence sent June 20th 2012)

After some discussions this morning I’ve decided on the following best path forward for TM3 at the Hot Cell leading up to the Canada Day long weekend.

 

General Goals:

-          Blank-off TM3 water line terminations (coil, heat shield, water-cooled window)

-          Test sliding tray removal tool to determine fit on TM3 chassis

 

We will skip the Conditioning Station leak tests and return TM3 directly to a silo for the following reasons:

-          We will have a visitor next week and this will impact Chad’s time available to do Hot Cell work

-          Helium pressure leak checks on the blanked-off circuits are only one small portion of a large set of diagnostic tests (leak, electrical, HV, etc.) that must ultimately be performed on TM3 to determine its fitness. This full set of tests must be carefully documented in a procedure and executed systematically when there is adequate time at the CS to do all of them, with results recorded.  There is currently not adequate time for this work between now and Canada Day.

-          If we were to detect a leak from one of these tests, it would not tell us anything about where the leak is in that given circuit (there are multiple possible points).  The service cap would have to be opened regardless, which we don’t have time for.

-          The aforementioned bullets above lead me to conclude that the extra work required for two module moves for one set of partial leak checks is not a value-added exercise: In other words, the module will have to go back to the CS, regardless of what we do over the next week for more tests.  The time savings of trying to squeeze it in next week are really negligible and it makes for a tight schedule for not much benefit.

 

Chad:  Please prepare a detailed work plan for your hot cell jobs including a list of the tools required and what leak checks you will do specifically after you have installed the blank-offs.  You may refer to existing procedures if you already have these written.  I would like to review this plan and I am expecting that an e-log will be filed daily and this work plan should be referred to as an attachment.

 

Proposed Schedule Jun 20 to 29

 

Wednesday Jun 20 (1 working day)

-          Setup for TM3 move from Silo to HC (Travis, David)

 

Thursday Jun 21 (1 working day)

-          TM3 moved from silo to HC (Travis, Don Dale, David)

 

Friday Jun 22 to Wednesday Jun 27 (4 working days)

-          Chad performs the following HC work on TM3:

·         Removes containment box

·         Installs water-line blank-offs

·         Checks Sliding Tray Removal Tool Fit

-          Vacuum leak checks of blanked-off lines at the HC (Chad, David, VG)

-          Chad buttons up TM3

-          In parallel - David performs block moves as required

 

Thursday Jun 28 (1 working day)

-          TM3 moved from HC to Silo (Travis, Don Dale, David)

 

Friday Jun 29 (1 working day)

-          Contingency

 

RH Group: Please move ahead with the work as outlined above.  Please comment if you have any concerns or proposed changes to this plan.  Thanks very much to all for your assistance,

 

Grant

 

-------------------------------------------------

Grant Minor, M.A.Sc., P.Eng.

TRIUMF Remote Handling Group Leader

Nuclear Engineer

4004 Wesbrook Mall, Vancouver

BC, Canada, V6T2A3

gminor@triumf.ca

(604) 222-7359

http://www.triumf.ca/profiles/4557

-------------------------------------------------

ELOG V2.9.2-2455