Friday, August 16, 2024, 15:32, Aaron Tam, South Hot-Cell, Standard Operation, TM4, Ta#68 LP-SIS, Target Ta#68 loaded onto TM4
|
Target Ta#68 loaded onto TM4
-leak check passed
-Target electrode conductor screws torqued to 130 in-lbs |
Monday, August 19, 2024, 09:32, David Wang, Conditioning Station, Standard Operation, TM4, Ta#68 , TM4 has been moved from SHC to TCS.
|
TM4 has been moved from SHC to TCS. The move is successful. |
Friday, September 06, 2024, 10:01, David Wang, South Hot-Cell, Standard Operation, TM4, Ta#67 back up. , TM4 has been moved from SMP to SHC.
|
TM4 has been moved from SMP to SHC. The move is smooth. |
Tuesday, September 10, 2024, 12:41, Aaron Tam, South Hot-Cell, Standard Operation, TM4, TiC#9, Target TiC#9 HP-SIS installed onto TM4
|
September 9, 2024 - Aaron Tam
Water from waterline found puddled on source-tray and containment box.
Water was wiped up as much as possible, but
likely still in containment box
leaving to dry overnight
Target inserted into Hotcell with nuts for the parasitic target. |
Tuesday, September 10, 2024, 12:41, Frank Song, South Hot-Cell, Standard Operation, TM4, TiC#9 , electrical check/leak check
|
TM4 with new target TiC#9 Surface installed in SHC was leak/electric checked before moving to TCS. See attached pic pls. |
Wednesday, September 11, 2024, 07:59, David Wang, Conditioning Station, Standard Operation, TM4, TiC#9, TM4 has been moved from SHC to TCS.
|
TM4 has been moved from SHC to TCS. The move is smooth. |
Tuesday, September 17, 2024, 11:16, David Wang, ITW, Standard Operation, TM4, TiC#9, TM4 has been moved from TCS to ITW.
|
TM4 has been moved from TCS to ITW. The move is smooth. |
Tuesday, September 17, 2024, 13:42, Frank Song, ITW, Standard Operation, TM4, TiC#9 , Module Connection
|
TM4 with target TiC#9 is connected in ITW. See attachment. |
Monday, September 23, 2024, 11:35, David Wang, ITW, Standard Operation, TM4, TiC #9., vacuum leak check on TM4 service cap in ITW.
|
vacuum leak check on TM4 service cap in ITW was done this morning. leak detector leak rate 0.0XE-9 atm.cc/sec. No leak on TM4 service cap
module top. |
Tuesday, November 05, 2024, 09:49, Frank Song, ITW, Standard Operation, TM4, TiC#9 , module disconnection
|
TM4 with spent target TiC#9 was disconnected in 29-10-2024 and it is being moved from ITW to SHC. |
Wednesday, November 06, 2024, 08:29, Aaron Tam, South Hot-Cell, Standard Operation, TM4, TiC#9, Target and Parasitic assemblies removal from TiC#9 17x
|
November 5, 2024 - Aaron Tam
TiC#9 HP-SIS removed from TM4
Top left fixing bolt shows signs of heating on it (Comparison photos attached Bolt_profile.jfif & Bolt_Tops.jfif)
|
Wednesday, November 06, 2024, 16:33, David Wang, South Hot-Cell, Standard Operation, TM4, UCX46, TM4 with UCx46 electrical and leak check at SHC
|
TM4 with UCx46 electrical and leak check at SHC is done. Everything is good. |
Friday, November 08, 2024, 10:44, Aaron Tam, South Hot-Cell, Standard Operation, TM4, UCx#46, UCx#46 Install and Parasitic Target Status
|
November 6, 2024 - Aaron Tam
UCx#46 Target handover from TPO
Target insertion: successful |
Tuesday, November 12, 2024, 12:30, Frank Song, ITW, Standard Operation, TM4, UCx#46, Module Connection
|
TM4 with new target UCx#46 was moved from TCS to ITW and has been re-connected right after. see attachment pls. |
Thursday, November 21, 2024, 14:11, Frank Song, 5 Shielding Blocks, Standard Operation, TM4, UCx#46, shielding blocks transfer
|
Shielding blocks have been moved from ITE to ITW and MAA is secured. |
Friday, January 03, 2025, 10:41, David Wang, ITW, Standard Operation, TM4, UCX46, ITW primary and secondary vacuum vessel leak check for 2025 shut down
|
ITW primary and secondary vacuum vessel leak check for 2025 shut down has been done. Also,TM4 internal water line helium pressure test has been
finished. Both results are normal. There are two small old leak on EXit 1 and Exit2 module top plate o-ring under 1Xe-8 atm.cc/sec which we
knoew in past years test. resin spray on leak area reduce the leak ratee below 5Xe-9 atm.cc/sec. No concern on these small leak. See attachment |
Monday, January 06, 2025, 08:38, Frank Song, ITW, Standard Operation, TM4, UCx#46, module disconnection
|
TM4 WITH UCx#46 was disconnected in 2025-01-02 in ITW. Forms attached. |
Wednesday, January 08, 2025, 07:37, chad fisher, South Hot-Cell, Standard Operation, TM4, UCx#46, UCx#46 removal
|
UCx#46 removed from TM4 and placed into a pail back-filled with argon. Nothing visually unusual; no issues. |
Thursday, January 09, 2025, 11:46, David Wang, Safe Module Parking, Standard Operation, TM4, No target, SMP is under vacuum for TM4 storage during shut down.
|
SMP:MP1 is started with SMP BV1 is opened. SMP is under vacuum for TM4 storage during shut down. |