121
|
Friday, June 08, 2012, 11:07 |
David Wang | Conditioning Station | Standard Operation | TM1 | Ta38 | conditioning staion and TM1 is under TP1 and TP2 pumping now. | I connected vacuum system to TM1 and conditioning
station and started two turbo pumps yesterday.
The pumping an d vacuum readings are |
|
123
|
Friday, June 08, 2012, 15:03 |
Don Jackson | South Hot-Cell | Standard Operation | TM1 | Ta38 | Electrical Check on new Ta38 at hot cell | Megger checks were exceptionally high (good).
Readings taken less than 2 hours after reading low
values from end of run on Nb#6. Tests |
|
126
|
Monday, June 11, 2012, 14:41 |
David Wang | Conditioning Station | Standard Operation | TM1 | Ta38 | Heat shield helium pressure test | Connected leak detector to TM1 and CS vacuum
system. The vacuum readings on TM1 and CS:PNG1
1.3 xE-6 Torr, IG1 4.7xE-7torr, IG4(diagnostic |
|
128
|
Tuesday, June 19, 2012, 16:18 |
David Wang | ITW | Standard Operation | TM1 | Ta38 | TM1connected in ITW |
Normal
0
|
|
151
|
Tuesday, July 31, 2012, 09:52 |
David Wang | ITW | Standard Operation | TM1 | Ta38 | TM1 disconnected in ITW | I disconnected TM1 in ITW. Heat shield
line has been purged . |
|
8
|
Tuesday, July 19, 2011, 12:25 |
maicodallavalle | South Hot-Cell | Standard Operation | TM4 | Ta36 | TM4 Ta36 Target was put into the south hot cell. | Ta36 was check by Maico and Chad.It was
then carried into the anteroom.From the anteroom
it was transferred into the south hot cell. |
|
2700
|
Tuesday, October 08, 2024, 11:46 |
David Wang | ITE | Standard Operation | TM2 | Ta#68. | Tm2 has been moved form SHC to ITE. | Tm2 has been moved form SHC to ITE. The
move is smooth. |
|
2675
|
Friday, September 06, 2024, 14:28 |
Aaron Tam | South Hot-Cell | Standard Operation | | Ta#68(Spare) | Ta#68(Spare) removed from TM4 and into Anteroom | September 5, 2024 -AT
Plastic and clean target
tray added to SHC
TM4 |
|
2664
|
Friday, August 16, 2024, 15:32 |
Aaron Tam | South Hot-Cell | Standard Operation | TM4 | Ta#68 LP-SIS | Target Ta#68 loaded onto TM4 | Target Ta#68 loaded onto TM4
-leak check passed
-Target electrode conductor screws |
|
2665
|
Monday, August 19, 2024, 09:32 |
David Wang | Conditioning Station | Standard Operation | TM4 | Ta#68 | TM4 has been moved from SHC to TCS. | TM4 has been moved from SHC to TCS. The
move is successful. |
|
2662
|
Friday, August 16, 2024, 13:29 |
Frank Song | South Hot-Cell | Standard Operation | TM4 | Ta#68 | electrical check/leak check | New target Ta#68 is installed on
TM4 and be leak/electric checked. Pls see
attachment. |
|
2698
|
Tuesday, October 08, 2024, 11:20 |
Aaron Tam | South Hot-Cell | Standard Operation | TM2 | Ta#68 | Ta#68 install onto TM2, w/ Troubleshooting | October 7, 2024 - Aaron Tam
Ta#68 HP-SIS checks performed at
B1 lab, moved to anteroom, and inserted into |
17x |
2701
|
Wednesday, October 09, 2024, 14:04 |
Frank Song | ITE | Standard Operation | TM2 | Ta#68 | Module Connection | TM2 with new target Ta#68 installed
is connected in ITE. Pls see form attached. |
|
2725
|
Tuesday, December 03, 2024, 10:10 |
Frank Song | ITE | Standard Operation | TM2 | Ta#68 | module disconnection | TM2 with spent target TA#68 was disconnected
in ITE and is being moved to SHC. All water
lines are purged for module storage. |
|
2728
|
Tuesday, December 03, 2024, 15:53 |
Aaron Tam | South Hot-Cell | Standard Operation | TM2 | Ta#68 | Ta#68 Removal | Note: Ta#68 had a difficult
install. See E-log ID# 2698 for more info
First look: |
22x |
2732
|
Wednesday, December 04, 2024, 14:30 |
Aaron Tam | South Hot-Cell | Standard Operation | | Ta#68 | Ta#68 PIE | Abstract:
This target has seen some irregular
beam patterns |
32x |
2733
|
Thursday, December 05, 2024, 11:43 |
Aaron Tam | South Hot-Cell | Standard Operation | | Ta#68 | Pail loading - Ta#68 & Others into Pail#300 | December 5, 2024 - Aaron Tam w/ help from
Chad, Peter and Adam at the Crane
Hot Cell Prep: |
|
2734
|
Thursday, December 05, 2024, 12:00 |
Adam Newsome | Spent Target Vault | Standard Operation | | Ta#68 | Spent target move - Ta#68 in Pail 300 | Ta#68 spent target was moved in Pail 300
to storage vault location 5A. The dose rate
measured at the South Hot Cell was 429 mSv/h |
|
2658
|
Tuesday, August 13, 2024, 14:23 |
David Wang | ITE | Standard Operation | TM3 | Ta#67. | TM2 with Ta#target has been moved from SHC to ITE. | TM2 with Ta#target has been moved from
SHC to ITE. the move is smooth. |
|
2674
|
Friday, September 06, 2024, 10:01 |
David Wang | South Hot-Cell | Standard Operation | TM4 | Ta#67 back up. | TM4 has been moved from SMP to SHC. | TM4 has been moved from SMP to SHC. The
move is smooth. |
|