Entry  Monday, January 13, 2020, 14:19, Travis Cave, Spent Target Vault, Standard Operation, , Ta#49 and Ta#52, spent target repackaging and moved to mini vault. 
 Targeta Ta#49 and Ta#52 have been repackaged anf moved to the mini vault. Ta#49 was taken out of pail number 146 and placed into pail 229. Ta#52
was taken out of pail number 152 and placed into pail 230.
Entry  Friday, January 10, 2020, 10:26, David Wang, ITE, Standard Operation, , , ITE water signal inerlock check. 
ITE water  signal interlock   check is done.  Everything is good. It is a annual check we do in winter shut down time. 
Entry  Thursday, January 09, 2020, 14:14, David Wang, Conditioning Station, Standard Operation, TM3, , Start of TCS roughing pump for TM3. 
I started TCS roughing pump. TM3 TP1 and TP2 will be started tomorrow morning. 
Entry  Thursday, January 09, 2020, 13:49, Travis Cave, Conditioning Station, Standard Operation, TM3, no target, Module move 
 TM#3 has been moved from the south west silo to the conditioning station.
Entry  Wednesday, January 08, 2020, 10:34, David Wang, Assembly/Bench Test, Development, , , Module lifting assembly ITA0490 
The second module lifting assembly ITA0490 is moved into TH and installed onto TM3 . It will stay with TM3. I adjusted the  CofG on the assembly.
It is same to the first lifting assembly we are using now. After adjustment, The installation of assembly on TM3 are smooth.  
Entry  Tuesday, January 07, 2020, 09:37, David Wang, ITW, Standard Operation, , , 5 shielding blocks are moved out of ITW top. 
5 shielding blocks are moved out of itw top. 
Entry  Tuesday, January 07, 2020, 08:02, David Wang, Cooling, Standard Operation, , , Switch on HALCW MP2 
HALCW MP2 is switched on this morning after yesterday cooling tower maintenance. LALCW P5 and P6 pumps are started by isac operator  as well. The
system is good so far. 
Entry  Friday, January 03, 2020, 13:15, Adam Newsome, Crane, Repair, , , Target Hall Crane PLC Module/Battery Replacement 
The Target Hall Crane bridge and trolley motion was lost after a period of the crane having power disconnected over winter holidays. This is reported in
the following e-log: https://elog.triumf.ca/TIS/RH-ISAC/2039. This issue is a duplicate of what happened in 2019 at this time: https://elog.triumf.ca/TIS/RH-ISAC/1845
Entry  Thursday, January 02, 2020, 10:10, David Wang, Crane, Standard Operation, , , TH crane issue. 
Target hall crane does not work properly after TH crane main power is switched off during  Christmas time in control room. I switched the main power
back this morning. The only movement could be operated is crane rotation.  Power is supplied crane. The control  on N-S, E-W and up-down  movements
do not work. We had the same problem last year. After trouble shooting, It was pointed to a PLC battery issue. Control group changed the battery and reloaded
Entry  Thursday, January 02, 2020, 09:55, David Wang, Cooling, Standard Operation, , , I turned on HALC water pump MP2. 
HALCW MP2 is switched onnow. There is a small amount of air trapped in system. The pump works fine.  Water level and system resistivity will be
monitored for a while.
LALCW P5 and P6 are switched on  for cooling HALCW.  HALCW MP2 is in operation now. 
Entry  Thursday, December 12, 2019, 14:39, Isaac Earle, Safe Module Parking, Development, , , SMP assembly shifted 1.0" north 
The SMP assembly was shifted approximately 1.0" north today by pushing it, braced against the south wall, using a 100 Ton capacity air lifting bag
supplied by Beamlines Group.  The move was one of the action items identified at the Gate 4A/4B close-out review.  During commissioning of the
SMP, TM3 was installed into the vacuum vessel, which required the crane to be all the way at its south limit, so the move is to provide some margin for
Entry  Tuesday, December 03, 2019, 12:45, Adam Newsome, Spent Target Vault, Standard Operation, , SiC#38, SiC#38 in Pail 205 moved to Storage Vault: 4B Target_Index_2019-12-03.pdf
SiC#38 in Pail 205 was moved to section 4B of the storage vault. Dose rate when retrieving from Hot Cell was 22.2 mSv/h. 
Entry  Friday, November 29, 2019, 13:10, David Wang, ITE, Standard Operation, TM2, SiC 39# febiad, TM2 SiC#39 connection check list. SiC_#_39_febiad_connection_checklist.pdf
TM2 has been connected  in ITE.  All turbo-pumps are started.
Entry  Friday, November 29, 2019, 11:03, Travis Cave, South Hot-Cell, Standard Operation, TM2, SiC#39, Module move 
 TM#2 with the SiC#39 target has been moved from the south hot cell to the east target station.
Entry  Friday, November 29, 2019, 11:02, Travis Cave, South Hot-Cell, Standard Operation, TM2, SiC#38 SiC#39, Electrical Check Elec_chk_SiC#38_SHC_post_beam_TM2_11-26-2019.pdfElec_chk_SiC#39_SHC_TM2_11-29-2019.pdf
 Results from the electrical check with the old SiC#38 target and the new SiC#39.
Entry  Wednesday, November 27, 2019, 13:46, David Wang, Conditioning Station, Standard Operation, TM2, SiC 38# febiad, TM2 SiC #38 disconnection checklist. SiC_#_38_febiad_disconnection_checklist.pdf
TM2 was disconnected in ITE yesterday.
Entry  Tuesday, November 26, 2019, 10:24, Travis Cave, South Hot-Cell, Standard Operation, TM2, SiC#38, Module move 
 TM#2 with SiC#38 has been moved from ITE to the south hot cell.
Entry  Tuesday, November 19, 2019, 13:41, David Wang, ITE, Standard Operation, TM2, SiC 38# febiad, TM2 SiC#38 connection check list. SiC_#_38_febiad_connection_checklist.pdf
TM2 was connected in ITE 12th Nov. attach checklist
Entry  Thursday, November 14, 2019, 13:52, Travis Cave, Spent Target Vault, Standard Operation, , UC#22,23,24, Targets repackaged Target_Index_2019-11-14_Mini_Vault.pdf
 The targets UC#22,23,24 have been repackaged into the newer stronger pails, and have been placed back in the mini vault with new numbers. See attached
PDF for details.
Entry  Tuesday, November 12, 2019, 10:07, Travis Cave, Spent Target Vault, Standard Operation, , Ta#59, Spent Target Move Target_Index_2019-11-08.pdf
 The spent Ta#59 was moved from the south hot cell to the spent target vault. See the attached for details.