  2157   Tuesday, October 20, 2020, 10:14 Travis CaveITWStandard OperationTM2C#2Module move

 TM#2 with C#2 has been moved from the south hot cell to the West Target Station.

  2156   Monday, October 19, 2020, 12:52 David WangSouth Hot-CellStandard OperationTM2C#2TM2 electrical and leak check at SHC

TM2 electrical check and leak check are done at SHC with C#2 target installed. The results are good.  

Attachment 1: Tm3_bunker_set_up_018.JPG
Tm3_bunker_set_up_018.JPG
  2155   Friday, October 16, 2020, 10:36 Travis CaveITWStandard OperationTM2Ta#60Module move

 TM#2 with Ta#60 is now in the south hot cell.

  2154   Thursday, October 15, 2020, 12:48 Travis CaveITEStandard OperationTM4UC#31Module move

 TM#4 is now back in the east target station.

  2153   Tuesday, October 13, 2020, 10:16 Travis CaveITERepairTM4UC#31Module move

 TM#4 is now in the south hot cell from the east target station.

  2152   Wednesday, September 30, 2020, 09:54 Travis CaveSouth Hot-CellStandard OperationTM3no targetModule move

 TM#3 is now in the south hot cell.

  2151   Tuesday, September 29, 2020, 14:28 David WangSouth Hot-CellStandard OperationTM4UC#31TM4 UC#31 Electrical check and HS leak check

Tm4 UCx 31# electrical check result. See attachment.

Attachment 1: TM4_UCx31_elctrical_and_leak_check_at_SHC..pdf
TM4_UCx31_elctrical_and_leak_check_at_SHC..pdf
Attachment 2: Scanned_from_a_Xerox_Multifunction_Printer.pdf
Scanned_from_a_Xerox_Multifunction_Printer.pdf
  2150   Tuesday, September 29, 2020, 12:29 Travis CaveITEStandard OperationTM4UC#31Module move

 Module move of TM#4 with UC#31 was finished to today at around 10:30AM.

  2149   Tuesday, September 29, 2020, 12:12 David WangITERepairTM4 TM4 steerers staus after" left " grounding issue, and first stage investigation

Left (short) is switched with bottom. So on module:

"Top" is still top.

"Left" is bottom in module actually

"Bottom and Right" is Left and right in module actually.

 For the connection in ITE:

Left  cable is connected to "left" ( bottom  in module actually)

Top cable is connected to " Bottom and Right"( left and right in module actually)

Bottom and Right cable is connected to "Top" which is top in module.

Frank and I removed the panel, disconnected the "Left"cable  inside panel,  and checked  cable to ground resistance. "Left "is dead short to ground on ohmmeter check still. So the short could be on cable or inside source tray.  Further investigation is planned to confirm the short  location.

  2148   Thursday, September 24, 2020, 11:25 David WangConditioning StationStandard OperationTM4UC#31TM4 HS line leak check at SHC and TCS.

Both helium spray and helium pressurize on TM4 HS line withUCx31 target are done at SHC and TCS. No leak.

  2147   Thursday, September 24, 2020, 10:34 Travis CaveSpent Target VaultStandard Operation UC#30Spent Target Move

 UC#30 has been placed into the spent target vault, it was placed in pail 238 and in spot 1A of the vault. It was 81.5 mSv/hr when removed from the south hot cell. 

Attachment 1: Target_Index_2020-09-24.pdf
Target_Index_2020-09-24.pdf Target_Index_2020-09-24.pdf Target_Index_2020-09-24.pdf
  2146   Wednesday, September 23, 2020, 10:56 chad fisherSouth Hot-CellStandard OperationTM4UC#31 P2NUc#30 removed UC#31 P2N installed

UCx#30 has been removed from TM#4 and put in a can with argon. 5(10) pin connector had to have guide screws removed to be uninstalled.

UCx#31 P2N installed.

  2145   Tuesday, September 22, 2020, 10:56 Travis CaveSouth Hot-CellStandard OperationTM4UC#30Module move

 TM#4 with UC#30 has been moved from ITE to the south hot cell.

  2144   Friday, September 11, 2020, 11:25 Travis CaveITWStandard OperationTM2Ta#60Module move

 Both the west entrance module and TM#2 with Ta#60 have been moved back into ITW.

  2143   Tuesday, September 08, 2020, 10:37 Travis CaveITWStandard Operation no targetEntrance module move

 The West Entrance module has been moved to the south hot cell for repairs.

  2142   Thursday, August 27, 2020, 13:18 Anders MjosConditioning StationMaintenanceTM2 New Power Supply installed for TGHT

Arthur installed a new Magna Power PS for the TGHT yesterday. The old power supply has been moved to Evaporator 2. The power supply was configured for remote operation and tested successfully with low current (30 A).

  2141   Thursday, August 27, 2020, 11:14 Travis CaveSpent Target VaultStandard Operation Graphite #1Spent Target Move

 Graphite #1 along with the broke 2A2M19 wire scanner have been placed in the spent target vault see attached PDF for deatails.

Attachment 1: Target_Index_2020-08-27.pdf
Target_Index_2020-08-27.pdf Target_Index_2020-08-27.pdf Target_Index_2020-08-27.pdf
  2140   Thursday, August 27, 2020, 09:42 Anders MjosConditioning StationMaintenanceTM2Ta#60Refilled TK2

Refilled TCS:TK2 from 10 in to 22 in using the newly installed valve.

  2139   Thursday, August 27, 2020, 08:21 David WangConditioning StationStandard OperationTM2Ta#60Helium pressure check on TM2 HS line at TCS.

Helium pressurize on TM2 HS line at TCS is done.    Base LR is 0.0X E-9 atm.cc/sec.  70 psi helium 3 minutes.   No response.   Also, The TCS vacuum pumping down over night is good. 

  2138   Wednesday, August 26, 2020, 09:52 David WangSouth Hot-CellStandard OperationTM2Ta#60Ta#60 target electrical check and leak check at SHC.

Electrical check and leak check at SHC. NO leak. electrical check ok.   Before target on, A is short to PQ, RU is short to HS ( 60KV bias) as we measured before.

Attachment 1: Ta_60_electrical_checklist.pdf
Ta_60_electrical_checklist.pdf