2453
|
Tuesday, June 06, 2023, 17:36 |
Carla Babcock | ITW | Standard Operation | TM2 | TiC#6 | Module conditioning | Conditioned TM2 up to 48kV in ITW. Some
sparks and current is not very stable. Drawing
about 178uA at 48kV. |
|
2473
|
Tuesday, August 08, 2023, 13:01 |
David Wang | North Hot-Cell | Standard Operation | TM2 | TiC#6 | TM2 TiC#6 post run electrical check at NHC. | TM2 TiC#6 post run electrical check has
been done at TCS. See attachment |
|
2476
|
Wednesday, August 09, 2023, 13:43 |
Carla Babcock | North Hot-Cell | Standard Operation | TM2 | TiC#6 | TiC#6 PIE | PIE on TiC#6 was done in the NHC. The target
assembly looked brand new when we took it
out, no heating spots or deposits (pictures |
|
2478
|
Wednesday, August 23, 2023, 10:45 |
Travis Cave | Spent Target Vault | Standard Operation | | TiC#6 | Spent Target Move | TiC #6 moved from north hot cell
to spent target vault placed in pail #232
put in spot 6A and the field was 151mSv/hr |
|
2439
|
Monday, May 08, 2023, 10:59 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | TiC#5 | electrical check/leak check | TM4 with target TiC#5 installed has
been leak checked and electric checked on
NHC. |
|
2440
|
Wednesday, May 10, 2023, 08:40 |
Frank Song | ITE | Standard Operation | TM4 | TiC#5 | Module Connection | TM4 was connected in ITE. pics
attached FYI. |
|
2443
|
Monday, May 22, 2023, 15:06 |
Carla Babcock | ITE | Standard Operation | TM4 | TiC#5 | Module conditioning | Yesterday and today module conditioning
was done on Tm4 in ITE. This is the first
ramp up after the shutdown and ITE is planned |
|
2445
|
Wednesday, May 24, 2023, 17:25 |
Carla Babcock | ITE | Repair | TM4 | TiC#5 | Issues with anode short | When I tried to raise the anode voltage
in cathode bias mode on May 23 evening, I
found the target or tube shorted to HV common. |
|
2448
|
Tuesday, May 30, 2023, 12:23 |
Frank Song | ITE | Standard Operation | TM4 | TiC#5 | gas lines pump out in ITE Faraday Cage | argon is being supplied at 6 psi to TM4. |
|
2455
|
Tuesday, June 13, 2023, 09:55 |
Frank Song | ITE | Standard Operation | TM4 | TiC#5 | module disconnection | TM4 with TiC#5 was disconnected in
ITE and moved to NHC. |
|
2456
|
Tuesday, June 13, 2023, 11:45 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | TiC#5 | electrical check | TM4 with spent target TiC#5 electric
check after moving from ITE to NHC. |
|
2461
|
Wednesday, June 21, 2023, 09:51 |
Travis Cave | Spent Target Vault | Standard Operation | | TiC#5 | Spent Target Move | TiC#5 moved to the spent target vault
from the north hot cell. Placed in pail#279
in spot 3A, 40mSv/h when removed from NHC. |
|
2463
|
Wednesday, July 12, 2023, 22:21 |
Carla Babcock | North Hot-Cell | Standard Operation | | TiC#5 | TiC#5 post irradiation inspection results | The TiC#5 post irradiation inspection was
done on Wed. June 14 and Mon. June 19. This
target didn't have any obvious issues but |
|
641
|
Monday, April 07, 2014, 11:49 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | TiC#4 | Electrical check | Electrical test of TM#3 with TiC#4 attached.
See PDF. |
|
642
|
Monday, April 07, 2014, 14:13 |
chad fisher | South Hot-Cell | Standard Operation | TM3 | TiC#4 | TiC#4 installation | TiC#4 has been installed onto TM3 |
|
643
|
Tuesday, April 08, 2014, 09:05 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | TiC#4 | module move | TM#3 with TiC#4 has been moved from the
south hot cell to the conditioning station. |
|
645
|
Thursday, April 10, 2014, 14:03 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | TiC#4 | HV conditioning | The TiC#4 target that is on TM3 was
conditioned to 25kV today with the EINZEL
lens at 12.5kV. There was one spark shortly |
|
650
|
Tuesday, April 15, 2014, 08:53 |
Travis Cave | ITE | Standard Operation | TM3 | TiC#4 | module move | TM#3 with TiC#4 has been moved from the
conditioning station to the east target station. |
|
654
|
Monday, May 05, 2014, 10:40 |
Travis Cave | ITE | Standard Operation | TM3 | TiC#4 | module move | TM#3 with TiC#4 has been moved from the
east station to the south west silo. |
|
684
|
Tuesday, June 24, 2014, 11:12 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | TiC#4 | module move | TM#4 with TiC#4 has been moved from the
east target station to the south hot cell. |
|