  2372   Monday, October 03, 2022, 14:58 Matthew GareauNorth Hot-CellRepairTM4SiC#43 and C#4Loose multipin guide pin

 Today while I was removing the SiC#43 it was noticed that the multipin guide pin was loose.

This made it difficult to remove the target, and the multipin shoulder bolts removal was required.

With the loose pin it was not possible to attach the multipin for the target C#4.

Chad was able to tighten the multipin guide pin enough, however it became obvious that the pin could not be removed when it was attempted.

With the pin tightened, the target C#4 was installed and all checks were good.

It was recommend that once the C#4 target is removed the TM4 will need some repair to remove the multipin guide pin. 

 

Chad - Also it was noted that the guide pin (ITA6453) in question showed signs of plating or heat (see pictures I've added)

Attachment 1: MicrosoftTeams-image.png
MicrosoftTeams-image.png
Attachment 2: MicrosoftTeams-image_(1).png
MicrosoftTeams-image_(1).png
Attachment 3: MicrosoftTeams-image_(2).png
MicrosoftTeams-image_(2).png
  2373   Tuesday, October 04, 2022, 07:19 Frank SongNorth Hot-CellStandard OperationTM4C#4electrical check

 an electrical was done for TM4 with target C#4 installed on NHC.

Attachment 1: tm4_with_C#4_installed.png
tm4_with_C#4_installed.png
  2374   Wednesday, October 05, 2022, 09:31 David WangConditioning StationStandard OperationTM4C#4HS line helium pressure test. TM4 with C#4 at TCS.

TM4 HS line helium pressure test is done. 70psi helium pressure@ 3XE-8 atm.cc/sec . No leak.

  2376   Tuesday, October 11, 2022, 12:39 Frank SongITEStandard OperationTM4C#4Module Connection

 TM4 with Target C#4 was connected in ITE.

Attachment 1: TM4_with_C#4_connection_in_ITE.png
TM4_with_C#4_connection_in_ITE.png
  2378   Monday, October 17, 2022, 08:07 David WangITE/ITWRepairTM4 A small leak on target station secondaryvacuum back up line by ITH MP1S.
A small leak in target station secondary vacuum back up line is observed. It affects ITH CG2S,CG1S and CG4SA. Current draw on TP1s and TP4S is getting higher(above 1A) because of it. An internal leak in ITH MP1S is suspected by first round investigation. Close watching on system and further investigation are needed.
Initial Action Taken: none

17-Oct-2022 Comment by David Wang: On OCt 14th, Replaced a flexible hose on MP1S pump exhaust port,but did not solve the issue. High frequency vibration was sensed by hand on MP1S pump inlet and outlet ports. Pump height and position in pit are adjusted slightly in pit to reduce vibration. After, ITHCG2 and ITW CG4SA got a huge improvement in past 3 days. All back up line pressure are stabilized at normal operation status. Still, close watching on this issue is needed to ensure the present status is stabilized in long term.

The issue was returned after shielding block installation Monday morning at 8:30am. Investigated further,  I temporarily installed a turbopump used cooling fan on MP1s to improve pump heat dissipation. And a room fan is put outside on shielding blocks opening hole to increase air circulation into pit. Since then,  everything is perfect. All secondary turbo pumps current draw is around 0.5 to 0.6A which is the best.  I guess that short duo 10 pump life we observed in past could be related to high pump operation temperature in pit as well. We may increase the pump life if air circulation around the pump could be improved. A permanent solution is needed for it.

  2379   Wednesday, October 19, 2022, 12:00 Carla BabcockNorth Hot-CellStandard OperationTM4SiC#44PIE on SiC#44

Conducted PIE on SiC#44, which failed online. It had a cathode short, a target short and an anode short by the time we called the experiment off. In the post irradiation examination, two clear marks where the target legs touched the heat shield were found (see attachments 1 and 2). No marks were found to indicate where the cathode short would have been. The fibreglass sheath covering the anode wire where it passes over top of the coil was destroyed, must have been a result of sparking (see attachment 3). No other issues noticed, grid looked fine, though close inspection is difficult.

Attachment 1: SiC44_PIE_20221012_150145.jpg
SiC44_PIE_20221012_150145.jpg
Attachment 2: SiC44_PIE_20221012.jpg
SiC44_PIE_20221012.jpg
Attachment 3: SiC44_PIE_20221012_161755.jpg
SiC44_PIE_20221012_161755.jpg
  2388   Tuesday, November 22, 2022, 09:44 Frank SongITEStandard OperationTM4C#4module disconnection

TM4 with C#4 was disconnected in ITE

Attachment 1: TM4_with_C#4_disconnected_in_ITE.png
TM4_with_C#4_disconnected_in_ITE.png
  2389   Tuesday, November 22, 2022, 10:37 Adam NewsomeNorth Hot-CellStandard OperationTM4 TM4 Move - ITE to NHC

TM4 was moved from ITE to NHC with C#4.

  2390   Tuesday, November 22, 2022, 12:41 Frank SongNorth Hot-CellStandard OperationTM4C#4electrical check

 TM4 with C#4 is checked on NHC right after moving from ITE.

Attachment 1: TM4_with_C#4_electrical_check_right_after_moving_to_NHC.png
TM4_with_C#4_electrical_check_right_after_moving_to_NHC.png
  2391   Tuesday, November 22, 2022, 14:53 Carla BabcockNorth Hot-CellMaintenanceTM4 Multipin connector alignment pin on TM4 module loose

The pin on TM4 has become loose again, making it very difficult to remove the multipin connector with the last target, C#4. For the installation of the next target, UCx#41, we will drill out the hole on the target side bracket so that it doesn't contact the multipin pin. Will try to remove this pin by force in January, or if needed change out the whole multipin bracket.

  2392   Wednesday, November 23, 2022, 11:27 Frank SongNorth Hot-CellStandard OperationTM4UCx#41electric and leak check after new target installed

 an electric check and leak check done on NHC, TM4 with new target UCx#41 is ready moving to TCS.

Attachment 1: TM4_with_UCx#41_electric_and_leak_check_on_NHC.png
TM4_with_UCx#41_electric_and_leak_check_on_NHC.png
  2393   Wednesday, November 23, 2022, 12:10 Adam NewsomeConditioning StationStandard OperationTM4UCx#41TM4 Move - NHC to TCS

TM4 was moved from the North Hot Cell to the Target Conditioning Station with UCx#41.

  2394   Thursday, November 24, 2022, 11:32 Adam NewsomeSpent Target VaultStandard OperationTM4C#4C#4 Spent Target Moved to Storage Vault

C#4 spent target was moved to the storage vault, in pail 277. Dose rate at approximately 1 m when leaving the hot cell was 164 mSv/h. The pail has been placed in vault location 4C. See updated vault layout attached.

Attachment 1: Target_Index_2022-11-24.pdf
Target_Index_2022-11-24.pdf
  2395   Tuesday, November 29, 2022, 11:03 Adam NewsomeITEStandard OperationTM4C#4TM4 Move - TCS to ITE

TM4 was moved from the Conditioning Station to the East Target Station with C#4.

  2396   Thursday, December 01, 2022, 08:20 Frank SongITEStandard OperationTM4UCx#41Module Connection

 TM4 with UCx#41 was connected in ITE on Tuesday (2022-11-29) 

Attachment 1: TM4_with_UCx#41_connection_in_ITE.png
TM4_with_UCx#41_connection_in_ITE.png
  2397   Thursday, December 01, 2022, 13:45 Carla BabcockNorth Hot-CellStandard OperationTM4C#4Post irradiation inspection C#4

Post irradiation inspection of C#4 which was running in TM4/ITE was conducted at the NHC on Nov. 22 2022.

The yields from this target had been dropping and its behaviour was erratic, with the voltages on the tube and target jumping all over the place sometimes. The ion current on the FCs followed the voltages. We took this to mean the target container was breaking down.

Upon inspection we found the container looked pretty damaged - highly crystallized and distorted. The container had gone banana-shaped, but not in the usual direction. It had curved  in the direction of the ion source (see photos). The heat shield and other surrounding components were super clean, no deposits or marks at all.

Attachment 1: 20221122_152435.jpg
20221122_152435.jpg
Attachment 2: 20221122_153033.jpg
20221122_153033.jpg
Attachment 3: 20221122_152407.jpg
20221122_152407.jpg
  2405   Tuesday, January 24, 2023, 07:17 David WangITEStandard OperationTM4UCx#41TM4 water lines helium pressure test 2023.

TM4 water lines helium pressure test was done yesterday at ITE. All water lines were air purged one day ahead  for the test. No leak  has been found on TM4 waterlines during the test. See attachment for detail

Attachment 1: TM4_water_lines_helium_presuure_test_2023.pdf
TM4_water_lines_helium_presuure_test_2023.pdf
  2408   Tuesday, January 24, 2023, 08:46 David WangITEStandard OperationTM4UCx#41TM4 has been disconnected in ITE.

TM 4 has been disconnected in ITE.  See attachment for disconnection checklist.

Attachment 1: UCx#41_TM4_disconnection_checklist_in_ITE.pdf
UCx#41_TM4_disconnection_checklist_in_ITE.pdf UCx#41_TM4_disconnection_checklist_in_ITE.pdf UCx#41_TM4_disconnection_checklist_in_ITE.pdf
  2409   Tuesday, January 24, 2023, 14:22 David WangSouth Hot-CellStandard OperationTM4UCx#41TM4 electrical check with and without target at SHC

TM4 electrical check with UCX41target and without target at SHC.  The results are good. See attachment.

Attachment 1: TM4_electrical_check_with_UCX41_and_without_target_2023_Jan.pdf
TM4_electrical_check_with_UCX41_and_without_target_2023_Jan.pdf TM4_electrical_check_with_UCX41_and_without_target_2023_Jan.pdf
  2410   Wednesday, January 25, 2023, 06:52 David WangITEStandard OperationTM4UCx#41ITE primary and secondary vacuum vessel air to vacuum seals leak check.

ITE primary and secondary vacuum vessel air to vacuum seals leak check was done this week. One leak has been found on IG1S feed through to entrance module surface seal. It explains what we saw on ITE IG1S readings change(from low E-7 torr to 1Xe-6 torr) on December 22, 2022.  This leak seal will be replaced soon.

2023-Jan -27.  O-ring seal 229# was replaced on ITEIG1S feedthrough to entrance module surface sealing. Also o-ring seal 034# was replaced on the blank off cover beside the feed through to entrance module surface sealing. Since these o-rings are too close to each other. It is better to replace both of them to avoid misreading in leak check.

Attachment 1: ITE_vacuum_vessel_leak_check_2023..pdf