ID Date Author Category Type Moduledown Target/Number Subject
  2235   Tuesday, July 20, 2021, 09:46 Adam NewsomeITEStandard OperationTM4 Remotely moved TM4 from TCS to ITE

TM4 was moved from the conditioning station to the East target station.

  2236   Friday, July 30, 2021, 16:19 Carla BabcockITERepairTM4Ta#62Electrical issues on Ta62
TLDR: TBHT voltage too high and rising too quickly with TGHT current - voltage limited. TGHT power supply tripped breakers somehow. ITE:EL not outputting voltage.

 

A short between feedthroughs A and P developed at the end of the p2n run in this module, and was fixed by Chad prying apart the lines in the source tray with a long teflon bar. We did not take the containment box off to fix it properly for reasons of time and also potential damage to the containment box. This seemed to fix it and David measured around 13MOhms between A-P when the module was installed in ITE. To make sure we could recover if the short reappeared during the run, David did not connect the P/Q feedthrough to HV common on the module top as usual, but it was connected in the electrical room. I also unhooked the busbar from the coil power supply.

When trying to start the TGHT ramp up, it was discovered that ITE:TGHT had a fault in its readback circuit, which was showing negative voltages. Not sure how this happened, since the power supply was not used for the previous p2n run, maybe an HV spark? This supply was replaced with the spare (SN 1161-9894).

When TGHT and TBHT were able to be ramped up, we found that the tube heater voltage was increasing too much with the target current. Normally the rate of increase is about 0.0004 V per amp on TGHT. This time it was 0.004 V/A. This was causing the TBHT to be voltage limited, which I thought could be related to the AP short. So I re-wired it such that the P feedthrough (#7 in the electrical room) was disconnected from everything except it was tied to feedthrough A (#1) using a 100 Ohm resistor. This should prevent it from floating and also prevent current from going through. See documentation in the Target Records folder (https://documents.triumf.ca/docushare/dsweb/Get/Document-204373/July272021_ITETM4_electricalissues.pdf).

During the subsequent ramp up, the TGHT power supply tripped the breakers when it was at 500A, 8V. The cause of this is still uncertain, and the TBHT voltage issue persisted after the wiring change. In the interest of time we decided to stay conservative on the currents used and continue to run like this. It may also be possible that the copper block which is supposed to reference TBHT negative to HV common is not attached.

Finally ITE:EL is still not working. It shows a value on the front of the PSU but doesn't draw enough current and doesn't affect the beam. We are running without it and it will hopefully be fixed on the Aug. 4 maintenance day.

These electrical issues bear some resemblance to those with Ta61, but I don't think we ever determined the cause there.

  2243   Tuesday, September 14, 2021, 09:18 Travis CaveSouth Hot-CellRepairTM4SiC#40Module move
TM#4 with SiC#40 has been moved from the east target station to the south hot cell.
  2244   Wednesday, September 15, 2021, 08:39 Travis CaveITEStandard OperationTM4SiC#41Module move

TM#4 with SiC#41 has been moved from the NHC to ITE.

  2245   Friday, September 17, 2021, 12:20 Frank SongNorth Hot-CellStandard OperationTM4Sic#41TM4 SIS with Target and No external Connections

 TM4 electric check with new target was done by David. A pic attached here for ref.

Attachment 1: IMG_3603.jpg
IMG_3603.jpg
  2246   Friday, September 17, 2021, 12:34 Frank SongITEStandard OperationTM4Sic#41Module Connection

 TM4 with a new target was moved back from NHC to ITE and reconnected at pit. The 5 shielding blocks were installed as well. Copies of connection checklist are attached here.

Attachment 1: IMG_3602.jpg
IMG_3602.jpg
Attachment 2: IMG_3601.jpg
IMG_3601.jpg
Attachment 3: IMG_3600.jpg
IMG_3600.jpg
Attachment 4: IMG_3599.jpg
IMG_3599.jpg
  2254   Monday, October 04, 2021, 09:37 Frank SongITEStandard OperationTM4Sic#41module disconnection

 TM4 was disconnected and moved to NHC. 

Attachment 1: IMG_3715.jpg
IMG_3715.jpg
Attachment 2: IMG_3716.jpg
IMG_3716.jpg
Attachment 3: IMG_3717.jpg
IMG_3717.jpg
  2255   Monday, October 04, 2021, 10:52 Travis CaveNorth Hot-CellStandard OperationTM4SiC#41Module move

 TM#2 moved from ITE to NHC SiC#41 removed and then moved back to ITE.

  2257   Friday, October 08, 2021, 11:19 Frank SongNorth Hot-CellStandard OperationTM4UCx#35TM4 IGLIS target electrical tests

 the tests were done when TM4 was on NHC. see attached photos please.

Attachment 1: IMG_3739.jpg
IMG_3739.jpg
Attachment 2: IMG_3740.jpg
IMG_3740.jpg
  2258   Friday, October 08, 2021, 12:39 Frank SongITEStandard OperationTM4UCx#35Module Connection

 the module with target UC#35 was connected in ITE and being pumped down.

Attachment 1: IMG_3742.jpg
IMG_3742.jpg
Attachment 2: IMG_3741.jpg
IMG_3741.jpg
Attachment 3: IMG_3743.jpg
IMG_3743.jpg
Attachment 4: IMG_3744.jpg
IMG_3744.jpg
  2260   Tuesday, October 26, 2021, 11:01 Frank SongITEStandard OperationTM4UCx#35shielding blocks transfer

 the five shielding blocks have been moved from ITW to ITE. 

  2273   Tuesday, November 23, 2021, 10:46 Frank SongITEStandard OperationTM4UCx#35module disconnection

 the TM4 with UCx#35 was disconnected in ITE.

Attachment 1: IMG_4456_(2).JPG
IMG_4456_(2).JPG
  2274   Tuesday, November 23, 2021, 10:58 Adam NewsomeSouth Hot-CellStandard OperationTM4 TM4 Move

TM4 was moved from ITE to SHC. Shield plug installed in ITE.

  2275   Wednesday, November 24, 2021, 07:17 Frank SongSouth Hot-CellStandard OperationTM4Ta #63TM4 SIS with Target and No external Connections

the TM4 with new target Ta #63 installed in SHC and an electric check was made by David. 

Attachment 1: IMG_4469.JPG
IMG_4469.JPG
  2276   Wednesday, November 24, 2021, 09:08 Adam NewsomeConditioning StationStandard OperationTM4 Remotely moved TM4 from SHC to TCS

TM4 was moved from the South Hot Cell to the Conditioning Station.

  2277   Thursday, November 25, 2021, 10:33 David WangConditioning StationStandard OperationTM4Ta#63. helium pressure test on TM4 HS line at TCS.

Helium pressure test on TM4 HS line at TCS is done.  LD base leak rate 0.0 xE-9 atm.cc/sec. Helium pressure 70psi. HS line had been helium pressurized for 5 minutes during the test. No response on LD. HS line with Ta#63 is leak free.

  2280   Tuesday, November 30, 2021, 11:03 David WangITEStandard OperationTM4Ta#63.Remotely remove TM4(Ta#63) from TCS to ITE.

Remotely remove TM4(Ta#63) from TCS to ITE. The move is smooth and successful.

  2281   Tuesday, November 30, 2021, 12:51 David WangITEStandard OperationTM4Ta#63.Tm4 has been connected in ITE.

TM4 has been connected in ITE. See attachment for checklist.

Attachment 1: from_my_cellphone_2598_647.jpg
from_my_cellphone_2598_647.jpg
Attachment 2: from_my_cellphone_2598_648.jpg
from_my_cellphone_2598_648.jpg
Attachment 3: from_my_cellphone_2598_649.jpg
from_my_cellphone_2598_649.jpg
Attachment 4: from_my_cellphone_2598_650.jpg
from_my_cellphone_2598_650.jpg
  2282   Wednesday, January 05, 2022, 09:38 Frank SongITEMaintenanceTM4Ta #63TM4 SIS with Target and No external Connections

 electric check done in ITE. 

Attachment 1: tm4_with_Ta#63.jpg
tm4_with_Ta#63.jpg
  2285   Thursday, January 06, 2022, 13:54 David WangITEStandard OperationTM4 helium pressure test on TM4 internal cooloing lsine at ITE.

Helium pressure 70 psi. 3 minutes on each circle untill LR on LD is balanced. Base leak rate on LD:0.0xE-9 atm.cc/sec.   The result:

A:   slowly to1.8Xe-8atm.cc/sec after 2 minutes and balanced there. 

B:   slowly to 2.0XE-8 atm.cc/sec after 2 minutes and balanced there.

C:  quickly response  to 3.1XE-8 atm.cc/sec and balance there.

D : slowly to 3.0X E-9 atm.cc/sec and balanced there.

All others including coil1, coil 2 ,MSP, EE, HS, window are perfectly leak tight. No response on LD.

 The leak rate on A,B,C,D are in low E-8 or E-9 atm.cc/sec range.  They should seal cooling water without leak.    No concern. 

 