2175
|
Monday, January 04, 2021, 12:13 |
Adam Newsome | Conditioning Station | Development | TM3 | | TM3 Move |
TM3 was remotely moved from the South Hot Cell to the conditioning station. No containment box. |
2174
|
Thursday, December 24, 2020, 09:00 |
Matthew Gareau | North Hot-Cell | Development | | | NHC USB connection |
24/Noc/2020
USB was discovered to be in the reverse direction and will need to be change around to become operational
01/Dec/2020
USB was pulled from conduit
While attempting to re-pull the USB in the correction direction, the ethernet cable was damaged and need to be replaced,
(thanks to the Hubert's team for the wire help)
It was decided that it was too problematic to re-pull the wires with all other wires in the way. Therefore all the wires were removed from the operator control panel, and pulled so that the USB, USB power cord, and ethernet could be re-pulled all together.
However, even once all the wires were re-pulled and reconnected it was discovered that the USB had become damaged, and was removed again.
23/Dec/2020
- A new conduit was added through to the NHC, for only the USB
- USB was fed through, reconnected, and tested
- Putty will need to be added around the conduit to ensure a good seal into NHC |
2173
|
Monday, December 21, 2020, 11:22 |
Adam Newsome | Crane | Standard Operation | | | Crane Shutdown for Power Outage |
The Target Hall Crane has been shut down in preparation for the power outage tomorrow (Dec 22). Power will be restored on Dec 23.
Dec 23 update: power has been restored. The crane appears to be in working condition as there is no fault indicator on the PLC. |
2172
|
Thursday, December 10, 2020, 15:07 |
Adam Newsome | South Hot-Cell | Development | TM3 | | TM3 Move |
TM3 was remotely moved from the conditioning station to the South Hot Cell. No containment box. |
2171
|
Monday, December 07, 2020, 12:20 |
Adam Newsome | Conditioning Station | Development | TM3 | | TM3 Move |
TM3 has been moved from the South Hot Cell to the Conditioning Station. No containment box. |
2170
|
Wednesday, November 25, 2020, 09:05 |
Adam Newsome | South Hot-Cell | Standard Operation | TM3 | | Module Move |
TM3 has been moved from the Silo to the South Hot Cell. |
2169
|
Tuesday, November 24, 2020, 12:56 |
David Wang | ITW | Standard Operation | TM2 | Nb#9 | TM2 has been connected in ITW |
TM2 has been connected to ITW. Turbo pumps are stared. ITW pumping down is fine so far. |
Attachment 1: TM2_Nb#9_module_connection_checklist.pdf
|
|
2168
|
Tuesday, November 24, 2020, 09:37 |
Adam Newsome | ITW | Standard Operation | TM2 | | Module Move |
TM2 has been moved from the Conditioning Station to ITW. |
2167
|
Thursday, November 19, 2020, 12:00 |
Adam Newsome | Spent Target Vault | Standard Operation | | C#2 | Spent Target Move |
C#2 has been moved from the south hot cell to the spent target vault. It is in spot 8A of the vault in pail # 235 and was 185 mSv/hr upon removal from the south hot cell.
The Target Index spreadsheet has been updated on DocuShare. |
2166
|
Thursday, November 19, 2020, 09:00 |
David Wang | Conditioning Station | Standard Operation | TM2 | Nb#6 | Helium pressure check on TM2 HS line at TCS. |
LD 0.0 Xe-9 atm.cc/sec , 70 psi helium 3 minutes. No leak. |
2165
|
Wednesday, November 18, 2020, 15:28 |
David Wang | South Hot-Cell | Standard Operation | TM2 | Nb#6 | electrical check and HS leak check. |
Everything looks good. A still short to P before target installation. We will float P,Q as before on module top. |
Attachment 1: Screenshot_2020-11-18_Mail_-_David_Wang_-_Outlook.png
|
|
2164
|
Tuesday, November 17, 2020, 10:17 |
Adam Newsome | South Hot-Cell | Standard Operation | TM2 | | Module Move |
TM2 has been moved from ITW to the South Hot Cell.
Reading at ITW: 114 mSv/hr
Reading at SHC: 85 mSv/hr |
2163
|
Thursday, November 12, 2020, 10:02 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#31 | Spent Target Move |
UC#31 has been moved from the south hot cell to the spent target vault. It is in spot 8B of the vault in pail # 224 and was 3.71mSv/hr upon removal from the south hot cell. |
2162
|
Thursday, November 05, 2020, 10:48 |
Travis Cave | ITE | Standard Operation | TM4 | Ta#61 | Module move |
TM#4 with Ta#61 has been moved from the south hot cell to the east target station. |
2161
|
Thursday, November 05, 2020, 10:23 |
David Wang | Spent Target Vault | Standard Operation | | | TM2 old source tray and TM4 optic tray in vault tray#9. |
TM2 old source tray and TM4 optic tray are stored together in vault tray#9. The fielding measurement at SHC post 0.5 meter distance:
March 1st 2019, maximum 14.6msv/hr, minimum 4.78 msv/hr
Nov 2nd 2020, max 7.11m sv/hr, min 2.5msv/hr. |
2160
|
Tuesday, November 03, 2020, 10:52 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#31 | Module move |
TM#4 with UC#31 has been moved from the east target station to the south hot cell. |
2159
|
Friday, October 30, 2020, 09:02 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#48,51,54 SiC#35, and UC#25 | Repacking of the targets. |
Targets Ta#48,51,54 SiC#35, and UC#25 were repacked and placed in the mini vault. In the following order back to front. SiC#35 (240), Ta#54(241), UC#25(244), Ta#48(243), Ta#51(242).
Also during this repacking Ta#60 was also placed in the Spent Target Vault in spot 7B in pail# 239. |
Attachment 1: Target_Index_2020-10-30.pdf
|
|
2158
|
Tuesday, October 27, 2020, 11:46 |
Matthew Gareau | North Hot-Cell | Repair | | | Ratcheting repair issues with both left and right master |
The were issues with both left and right master ratcheting;
- the left handle was getting stuck in a close position when there was a higher ratcheting tension added
- the right ratcheting was not tightening preventing proper use of the manipulator
Chad and myself were able to identify a missing set screw for the tong cable.
Once this was added the issue with the left master ratcheting seems to be solved.
Lubricant was added to the left master ratchet and this seems to solve this problem as well.
There was also an observation of missing set screws on the spare manipulator for attaching the wrist to the ratcheting handle, which will need to be ordered and attached.
|
2157
|
Tuesday, October 20, 2020, 10:14 |
Travis Cave | ITW | Standard Operation | TM2 | C#2 | Module move |
TM#2 with C#2 has been moved from the south hot cell to the West Target Station. |
2156
|
Monday, October 19, 2020, 12:52 |
David Wang | South Hot-Cell | Standard Operation | TM2 | C#2 | TM2 electrical and leak check at SHC |
TM2 electrical check and leak check are done at SHC with C#2 target installed. The results are good. |
Attachment 1: Tm3_bunker_set_up_018.JPG
|
|