Entry  Tuesday, July 20, 2021, 09:46, Adam Newsome, ITE, Standard Operation, TM4, , Remotely moved TM4 from TCS to ITE 
TM4 was moved from the conditioning station to the East target station. 
Entry  Friday, July 30, 2021, 16:19, Carla Babcock, ITE, Repair, TM4, Ta#62, Electrical issues on Ta62 
TLDR: TBHT voltage too high and rising too quickly with TGHT current - voltage
limited. TGHT power supply tripped breakers somehow. ITE:EL not outputting voltage.
 
Entry  Tuesday, September 14, 2021, 09:18, Travis Cave, South Hot-Cell, Repair, TM4, SiC#40, Module move 
TM#4 with SiC#40 has been moved from the east target station to the south hot cell.
Entry  Wednesday, September 15, 2021, 08:39, Travis Cave, ITE, Standard Operation, TM4, SiC#41, Module move 
TM#4 with SiC#41 has been moved from the NHC to ITE.
Entry  Friday, September 17, 2021, 12:20, Frank Song, North Hot-Cell, Standard Operation, TM4, Sic#41, TM4 SIS with Target and No external Connections IMG_3603.jpg
 TM4 electric check with new target was done by David. A pic attached here for ref.
Entry  Friday, September 17, 2021, 12:34, Frank Song, ITE, Standard Operation, TM4, Sic#41, Module Connection IMG_3602.jpgIMG_3601.jpgIMG_3600.jpgIMG_3599.jpg
 TM4 with a new target was moved back from NHC to ITE and reconnected at pit. The 5 shielding blocks were installed as well. Copies of connection
checklist are attached here.
Entry  Monday, October 04, 2021, 09:37, Frank Song, ITE, Standard Operation, TM4, Sic#41, module disconnection IMG_3715.jpgIMG_3716.jpgIMG_3717.jpg
 TM4 was disconnected and moved to NHC. 
Entry  Monday, October 04, 2021, 10:52, Travis Cave, North Hot-Cell, Standard Operation, TM4, SiC#41, Module move 
 TM#2 moved from ITE to NHC SiC#41 removed and then moved back to ITE.
Entry  Friday, October 08, 2021, 11:19, Frank Song, North Hot-Cell, Standard Operation, TM4, UCx#35, TM4 IGLIS target electrical tests IMG_3739.jpgIMG_3740.jpg
 the tests were done when TM4 was on NHC. see attached photos please.
Entry  Friday, October 08, 2021, 12:39, Frank Song, ITE, Standard Operation, TM4, UCx#35, Module Connection IMG_3742.jpgIMG_3741.jpgIMG_3743.jpgIMG_3744.jpg
 the module with target UC#35 was connected in ITE and being pumped down.
Entry  Tuesday, October 26, 2021, 11:01, Frank Song, ITE, Standard Operation, TM4, UCx#35, shielding blocks transfer 
 the five shielding blocks have been moved from ITW to ITE. 
Entry  Tuesday, November 23, 2021, 10:46, Frank Song, ITE, Standard Operation, TM4, UCx#35, module disconnection IMG_4456_(2).JPG
 the TM4 with UCx#35 was disconnected in ITE.
Entry  Tuesday, November 23, 2021, 10:58, Adam Newsome, South Hot-Cell, Standard Operation, TM4, , TM4 Move 
TM4 was moved from ITE to SHC. Shield plug installed in ITE. 
Entry  Wednesday, November 24, 2021, 07:17, Frank Song, South Hot-Cell, Standard Operation, TM4, Ta #63, TM4 SIS with Target and No external Connections IMG_4469.JPG
the TM4 with new target Ta #63 installed in SHC and an electric check was made by David. 
Entry  Wednesday, November 24, 2021, 09:08, Adam Newsome, Conditioning Station, Standard Operation, TM4, , Remotely moved TM4 from SHC to TCS 
TM4 was moved from the South Hot Cell to the Conditioning Station. 
Entry  Thursday, November 25, 2021, 10:33, David Wang, Conditioning Station, Standard Operation, TM4, Ta#63. , helium pressure test on TM4 HS line at TCS.  
Helium pressure test on TM4 HS line at TCS is done.  LD base leak rate 0.0 xE-9 atm.cc/sec. Helium pressure 70psi. HS line had been helium pressurized
for 5 minutes during the test. No response on LD. HS line with Ta#63 is leak free. 
Entry  Tuesday, November 30, 2021, 11:03, David Wang, ITE, Standard Operation, TM4, Ta#63., Remotely remove TM4(Ta#63) from TCS to ITE. 
Remotely remove TM4(Ta#63) from TCS to ITE. The move is smooth and successful. 
Entry  Tuesday, November 30, 2021, 12:51, David Wang, ITE, Standard Operation, TM4, Ta#63., Tm4 has been connected in ITE.  from_my_cellphone_2598_647.jpgfrom_my_cellphone_2598_648.jpgfrom_my_cellphone_2598_649.jpgfrom_my_cellphone_2598_650.jpg
TM4 has been connected in ITE. See attachment for checklist.
Entry  Wednesday, January 05, 2022, 09:38, Frank Song, ITE, Maintenance, TM4, Ta #63, TM4 SIS with Target and No external Connections tm4_with_Ta#63.jpg
 electric check done in ITE. 
Entry  Thursday, January 06, 2022, 13:54, David Wang, ITE, Standard Operation, TM4, , helium pressure test on TM4 internal cooloing lsine at ITE. 
Helium pressure 70 psi. 3 minutes on each circle untill LR on LD is balanced. Base leak rate on LD:0.0xE-9 atm.cc/sec.   The result:
A:   slowly to1.8Xe-8atm.cc/sec after 2 minutes and balanced there.  
B:   slowly to 2.0XE-8 atm.cc/sec after 2 minutes and balanced there.