Entry  Tuesday, November 24, 2020, 12:56, David Wang, ITW, Standard Operation, TM2, Nb#9, TM2 has been connected in ITW TM2_Nb#9_module_connection_checklist.pdf
TM2 has been connected to ITW. Turbo pumps are stared. ITW pumping down is fine so far.
Entry  Tuesday, November 24, 2020, 09:37, Adam Newsome, ITW, Standard Operation, TM2, , Module Move 
TM2 has been moved from the Conditioning Station to ITW. 
Entry  Thursday, November 19, 2020, 12:00, Adam Newsome, Spent Target Vault, Standard Operation, , C#2, Spent Target Move 
C#2 has been moved from the south hot cell to the spent target  vault. It is in spot 8A of the vault in pail # 235 and was 185 mSv/hr  upon removal from
the south hot cell.
The Target Index spreadsheet has been updated on DocuShare.
Entry  Thursday, November 19, 2020, 09:00, David Wang, Conditioning Station, Standard Operation, TM2, Nb#6, Helium pressure check on TM2 HS line at TCS. 
LD 0.0 Xe-9 atm.cc/sec , 70 psi helium 3 minutes.  No leak.
Entry  Wednesday, November 18, 2020, 15:28, David Wang, South Hot-Cell, Standard Operation, TM2, Nb#6, electrical check and HS leak check. Screenshot_2020-11-18_Mail_-_David_Wang_-_Outlook.png
Everything looks good. A still short to P before target installation. We will float P,Q as before on module top. 
Entry  Tuesday, November 17, 2020, 10:17, Adam Newsome, South Hot-Cell, Standard Operation, TM2, , Module Move 
TM2 has been moved from ITW to the South Hot Cell. 

Reading at ITW: 114 mSv/hr
Entry  Thursday, November 12, 2020, 10:02, Travis Cave, Spent Target Vault, Standard Operation, , UC#31, Spent Target Move 
 UC#31 has been moved from the south hot cell to the spent target vault. It is in spot 8B of the vault in pail # 224 and was 3.71mSv/hr upon removal
from the south hot cell.
Entry  Thursday, November 05, 2020, 10:48, Travis Cave, ITE, Standard Operation, TM4, Ta#61, Module move 
 TM#4 with Ta#61 has been moved from the south hot cell to the east target station.
Entry  Thursday, November 05, 2020, 10:23, David Wang, Spent Target Vault, Standard Operation, , , TM2 old source tray and TM4 optic tray in vault tray#9. 
TM2 old source tray and TM4 optic tray are stored together in vault tray#9. The fielding measurement at SHC post 0.5 meter distance:
 
March 1st 2019, maximum 14.6msv/hr, minimum 4.78 msv/hr
Entry  Tuesday, November 03, 2020, 10:52, Travis Cave, South Hot-Cell, Standard Operation, TM4, UC#31, Module move 
 TM#4 with UC#31 has been moved from the east target station to the south hot cell.
Entry  Friday, October 30, 2020, 09:02, Travis Cave, Spent Target Vault, Standard Operation, , Ta#48,51,54 SiC#35, and UC#25, Repacking of the targets. Target_Index_2020-10-30.pdf
 Targets Ta#48,51,54 SiC#35, and UC#25 were repacked and placed in the mini vault. In the following order back to front. SiC#35 (240), Ta#54(241),
UC#25(244), Ta#48(243), Ta#51(242).
Also during this repacking Ta#60 was also placed in the Spent Target Vault in spot 7B in pail# 239.
Entry  Tuesday, October 27, 2020, 11:46, Matthew Gareau, North Hot-Cell, Repair, , , Ratcheting repair issues with both left and right master  
  
The were issues with both left and right master
ratcheting;
Entry  Tuesday, October 20, 2020, 10:14, Travis Cave, ITW, Standard Operation, TM2, C#2, Module move 
 TM#2 with C#2 has been moved from the south hot cell to the West Target Station.
Entry  Monday, October 19, 2020, 12:52, David Wang, South Hot-Cell, Standard Operation, TM2, C#2, TM2 electrical and leak check at SHC Tm3_bunker_set_up_018.JPG
TM2 electrical check and leak check are done at SHC with C#2 target installed. The results are good.  
Entry  Friday, October 16, 2020, 10:36, Travis Cave, ITW, Standard Operation, TM2, Ta#60, Module move 
 TM#2 with Ta#60 is now in the south hot cell.
Entry  Thursday, October 15, 2020, 12:48, Travis Cave, ITE, Standard Operation, TM4, UC#31, Module move 
 TM#4 is now back in the east target station.
Entry  Tuesday, October 13, 2020, 10:16, Travis Cave, ITE, Repair, TM4, UC#31, Module move 
 TM#4 is now in the south hot cell from the east target station.
Entry  Wednesday, September 30, 2020, 09:54, Travis Cave, South Hot-Cell, Standard Operation, TM3, no target, Module move 
 TM#3 is now in the south hot cell.
Entry  Tuesday, September 29, 2020, 14:28, David Wang, South Hot-Cell, Standard Operation, TM4, UC#31, TM4 UC#31 Electrical check and HS leak check TM4_UCx31_elctrical_and_leak_check_at_SHC..pdfScanned_from_a_Xerox_Multifunction_Printer.pdf
Tm4 UCx 31# electrical check result. See attachment.
Entry  Tuesday, September 29, 2020, 12:29, Travis Cave, ITE, Standard Operation, TM4, UC#31, Module move 
 Module move of TM#4 with UC#31 was finished to today at around 10:30AM.