1157
|
Thursday, February 25, 2016, 06:52 |
David Wang | Conditioning Station | Standard Operation | | | stop CS vacuum pumps. | I stopped the conditioning station vacuum
pumps. The CS is still under vacuum without
venting. |
|
|
1190
|
Tuesday, April 05, 2016, 07:12 |
David Wang | Conditioning Station | Standard Operation | TM1 | UC#15 | stop CS vacuum pumps. | Stop TCS vacuum pumps . Preparing argon
venting on TM1 and TCS.
7:34 AM, Disconnected TM1 at TCS, |
|
|
1418
|
Wednesday, January 04, 2017, 14:27 |
David Wang | Conditioning Station | Standard Operation | | | started TCS vacuum pump | TCS TP1S has been started.
2017-01-23 afternoon: Stopped TP1S.
We will use TCS to take TM2 tomorrow afternoon. |
|
|
1081
|
Thursday, September 24, 2015, 14:59 |
Friedhelm Ames | Conditioning Station | Standard Operation | TM4 | Ta#46 | start high voltage conditioning | |
|
|
2047
|
Monday, January 13, 2020, 14:19 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#49 and Ta#52 | spent target repackaging and moved to mini vault. | Targeta Ta#49 and Ta#52 have been
repackaged anf moved to the mini vault. Ta#49
was taken out of pail number 146 and placed |
|
|
201
|
Friday, November 02, 2012, 13:18 |
Travis Cave | Spent Target Vault | Standard Operation | | | spent target assay | This week six targets and the two source
trays were assayed and surveyed from the
storage vault. see attached PDF for details. |
|
|
377
|
Wednesday, June 12, 2013, 10:39 |
Travis Cave | South Hot-Cell | Standard Operation | | | spent source tray removal | The spent source tray for TM#3 has been
removed from the south hot cell and well
be placed in the the hot cell ante room. |
|
|
1524
|
Friday, May 05, 2017, 11:53 |
David Wang | Conditioning Station | Repair | TM3 | | sparking on TM3 serice cap top. | Sparking was found this morning inside
HV cover on TCS in TH while TM3 was HV conditioning
at TCS. The TCS bias was set to 50KV when |
|
|
1640
|
Wednesday, October 11, 2017, 15:50 |
Keith C Ng | Assembly/Bench Test | Standard Operation | | | spare source tray build alignment |
Spare |
|
|
1592
|
Wednesday, August 02, 2017, 15:41 |
Keith C Ng | Assembly/Bench Test | Development | | | spare source tray build | After re zeroing alignment telescope to
master jig and adjusted parts into place:
|
|
|
1642
|
Friday, October 13, 2017, 11:14 |
Keith C Ng | Assembly/Bench Test | Standard Operation | | | source tray alignment/build | Source tray is complete for brazing, gas
line bracket is currently missing but can
be made in parallel with tube bending operations. |
|
|
1471
|
Wednesday, March 29, 2017, 14:11 |
David Wang | Conditioning Station | Standard Operation | TM4 | | small leak on TM4 Ta(-) water line. | A small leak has been found on TM4 Ta(-)
which is marked as "B" on terminal
blocks. The LD base Leak rate is 1.2XE-8 |
|
|
2654
|
Sunday, August 11, 2024, 11:25 |
Carla Babcock | South Hot-Cell | Repair | TM3 | TiC#8 | short on multipin wires to TBHT discovered | With the new TiC#8 target installed on
TM3, there was a ~7kOhm connection between
TGHT/TBHT (A/B/C/D) and HV common. The standard |
|
|
2260
|
Tuesday, October 26, 2021, 11:01 |
Frank Song | ITE | Standard Operation | TM4 | UCx#35 | shielding blocks transfer | the five shielding blocks have been
moved from ITW to ITE. |
|
|
2597
|
Thursday, May 23, 2024, 10:59 |
Frank Song | ITE | Standard Operation | TM3 | UCx#44 | shielding blocks transfer | the five shielding blocks have been
moved from storage area to ITE and is ready
for beam delivery. |
|
|
2607
|
Monday, June 10, 2024, 11:02 |
Frank Song | ITW | Standard Operation | TM4 | UCx#45 | shielding blocks transfer | 5 shielding blocks have been transferred
from ITE to ITW.
Doc # 181007 |
|
|
2628
|
Tuesday, July 02, 2024, 11:38 |
Frank Song | ITE/ITW/Storage Area | Standard Operation | | | shielding blocks transfer | 5 shielding blocks have been moved
from ITW to ITE, MAA area has been secured. |
|
|
2645
|
Wednesday, July 24, 2024, 10:10 |
Frank Song | ITE/ITW/Storage Area | Standard Operation | | | shielding blocks transfer | 5 shielding blocks have been transferred
from ITE to ITW. MAA is secured again after
moving. |
|
|
2666
|
Monday, August 19, 2024, 15:29 |
Frank Song | ITW/ITE | Standard Operation | TM2 | Ta#67 | shielding blocks transfer | 5 shielding blocks have been transferred
from ITW to ITE, MAA has been secured after
moving. |
|
|
2691
|
Tuesday, September 24, 2024, 09:37 |
Frank Song | ITE/ITW | Standard Operation | | | shielding blocks transfer | 5 shielding blocks have been moved
from ITE to ITW. |
|