  2759   Thursday, January 30, 2025, 07:07 David WangCraneStandard Operation  target hall crane annual inspection.Tom Kauss finished TH crane annual inspection
yesterday. The crane woks  fine. Tom  has
this inspection record in his file. The crane
  
  2530   Thursday, January 25, 2024, 07:24 David WangCraneStandard Operation  targe hall annual crane inspectionTom Kauss finished TH crane annual inspection
yesterday. The crane woks fine. Tom  has
this inspection record in his file. The crane
  
  1157   Thursday, February 25, 2016, 06:52 David WangConditioning StationStandard Operation  stop CS vacuum pumps.I stopped the conditioning station vacuum
pumps. The CS is still under vacuum without
venting.
  
  1190   Tuesday, April 05, 2016, 07:12 David WangConditioning StationStandard OperationTM1UC#15stop CS vacuum pumps.Stop TCS vacuum pumps . Preparing argon
venting on TM1 and TCS.
7:34 AM, Disconnected TM1 at TCS,
  
  1418   Wednesday, January 04, 2017, 14:27 David WangConditioning StationStandard Operation  started TCS vacuum pumpTCS TP1S has been started.
2017-01-23 afternoon: Stopped TP1S.
We will use TCS to take TM2 tomorrow afternoon.
  
  1081   Thursday, September 24, 2015, 14:59 Friedhelm AmesConditioning StationStandard OperationTM4Ta#46start high voltage conditioning    
  2047   Monday, January 13, 2020, 14:19 Travis CaveSpent Target VaultStandard Operation Ta#49 and Ta#52spent target repackaging and moved to mini vault. Targeta Ta#49 and Ta#52 have been
repackaged anf moved to the mini vault. Ta#49
was taken out of pail number 146 and placed
  
  2788   Friday, April 04, 2025, 09:35 David WangCraneDevelopment  spent target pail and its lifting jigs load test Adam and I did  spent target pail
and its lifting jigs load test this morning. 
The load for full pail test is 263 lbs and
  
  201   Friday, November 02, 2012, 13:18 Travis CaveSpent Target VaultStandard Operation  spent target assayThis week six targets and the two source
trays were assayed and surveyed from the
storage vault. see attached PDF for details.
 Vault_Storage_November_2_2012.pdf 
  377   Wednesday, June 12, 2013, 10:39 Travis CaveSouth Hot-CellStandard Operation  spent source tray removalThe spent source tray for TM#3 has been
removed from the south hot cell and well
be placed in the the hot cell ante room.
  
  1524   Friday, May 05, 2017, 11:53 David WangConditioning StationRepairTM3 sparking on TM3 serice cap top.Sparking was found this morning inside
HV cover on TCS in TH while TM3 was HV conditioning
at TCS. The TCS bias was set to 50KV when
  
  1640   Wednesday, October 11, 2017, 15:50 Keith C NgAssembly/Bench TestStandard Operation  spare source tray build alignment 
 
Spare
  
  1592   Wednesday, August 02, 2017, 15:41 Keith C NgAssembly/Bench TestDevelopment  spare source tray buildAfter re zeroing alignment telescope to
master jig and adjusted parts into place:
 
 20170802_sourcetray_RHB_8264.JPG20170802_sourcetray_RHB_8266.JPG 
  1642   Friday, October 13, 2017, 11:14 Keith C NgAssembly/Bench TestStandard Operation  source tray alignment/buildSource tray is complete for brazing, gas
line bracket is currently missing but can
be made in parallel with tube bending operations.
 20171013_sourcetray_P1030815.JPG20171013_sourcetray_P1030816.JPG20171013_sourcetray_P1030817.JPG20171013_sourcetray_P1030818.JPG 
  1471   Wednesday, March 29, 2017, 14:11 David WangConditioning StationStandard OperationTM4 small leak on TM4 Ta(-) water line.A small leak has been found on TM4 Ta(-)
which is marked as "B" on terminal
blocks. The LD base Leak rate is 1.2XE-8
 TM4_2017_leak_check_in_ITE.png 
  2654   Sunday, August 11, 2024, 11:25 Carla BabcockSouth Hot-CellRepairTM3TiC#8short on multipin wires to TBHT discoveredWith the new TiC#8 target installed on
TM3, there was a ~7kOhm connection between
TGHT/TBHT (A/B/C/D) and HV common. The standard
  
  2260   Tuesday, October 26, 2021, 11:01 Frank SongITEStandard OperationTM4UCx#35shielding blocks transfer the five shielding blocks have been
moved from ITW to ITE. 
  
  2597   Thursday, May 23, 2024, 10:59 Frank SongITEStandard OperationTM3UCx#44shielding blocks transfer the five shielding blocks have been
moved from storage area to ITE and is ready
for beam delivery.
  
  2607   Monday, June 10, 2024, 11:02 Frank SongITWStandard OperationTM4UCx#45shielding blocks transfer 5 shielding blocks have been transferred
from ITE to ITW. 
Doc # 181007
  
  2628   Tuesday, July 02, 2024, 11:38 Frank SongITE/ITW/Storage AreaStandard Operation  shielding blocks transfer 5 shielding blocks have been moved
from ITW to ITE, MAA area has been secured.
  