ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
Text |
 |
889
|
Friday, April 17, 2015, 14:04 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | UC#12 | Module move | TM#1 with UCx#12 has been moved from the
south hot cell to the conditioning station. |
|
894
|
Tuesday, April 21, 2015, 17:14 |
Isaac Earle | South Hot-Cell | Standard Operation | TM1 | UC#12 | UC#12 Installed in TM1 | On Friday April 17th, UC#12 target was
installed in TM1. One of the copper
water lines was bent slightly as the target |
 |
899
|
Monday, April 27, 2015, 16:12 |
Keith C Ng | South Hot-Cell | Development | TM2 | | Ceramic Standoffs in TM2 source tray steerer assembly | On drawing ITA6008 for the Encole 0.5"
ceramic standoffs there is a note to match
pairs of ceramics to within +/-0.001". |
|
906
|
Thursday, April 30, 2015, 08:50 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | No target | Module move | TM#2 with no source tray has been moved
from the north east silo to the south hot
cell. |
|
907
|
Friday, May 01, 2015, 08:27 |
chad fisher | South Hot-Cell | Repair | TM2 | | Containment Box Removal | Containment box has been removed in preparation
for wire replacement. |
|
908
|
Friday, May 01, 2015, 13:48 |
David Wang | South Hot-Cell | Standard Operation | TM2 | | Target Hall Scheduled Activities April 07 - June 26 2015 update | Target Hall Scheduled Activities
April 07 - June 26 2015 update.
2015-05-01. All TH scheduled |
 |
910
|
Tuesday, May 05, 2015, 10:57 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Wiring | Old wiring was removed yesterday, new wiring
run thru the vacuum chase. Old IMG gauge
removed today, new cable trays installed |
 |
911
|
Wednesday, May 06, 2015, 14:30 |
Travis Cave | South Hot-Cell | Repair | TM2 | No target | Wiring of TM#2 | Wires for TM#2 steering elements, and png
gauge have been run down to the containment
box level. Chad has placed them in the little |
 |
912
|
Thursday, May 07, 2015, 11:02 |
Travis Cave | South Hot-Cell | Repair | TM2 | No target | Wiring of TM#2 | Wires in TM#2 have been terminated at the
top of the module. |
|
914
|
Monday, May 11, 2015, 11:20 |
David Wang | South Hot-Cell | Standard Operation | TM2 | | Target Hall Scheduled Activities April 07 - June 26 2015 | The schedule has some changes due to
new TM2 source tray coil cooling line leaking
at test stand. Now,It is re-scheduled in |
6x |
915
|
Wednesday, May 13, 2015, 13:55 |
chad fisher | South Hot-Cell | Repair | TM2 | | Shutter removal | TM2 has been successfully de-shuttered.
All went pretty much according to
plan except I had to remove one fastener |
 |
918
|
Tuesday, May 26, 2015, 14:34 |
chad fisher | South Hot-Cell | Repair | TM2 | | Shutter replacement | The shutter in TM2 was successfully replaced
today.
New lock washer and nut were installed |
|
922
|
Monday, June 01, 2015, 14:24 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#45 | Electrical Check | Post beam electrical check on the Ta#45
target installed on TM#4. See attached PDF. |
|
923
|
Tuesday, June 02, 2015, 06:51 |
David Wang | South Hot-Cell | Standard Operation | TM4 | | Target Hall Scheduled Activities April 07 - June 26 2015 | Target Hall schedule weekly update. All
jobs are finished on time so far. |
 |
924
|
Tuesday, June 02, 2015, 09:43 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | SiC#31 | SiC#31 installed | Ta #45 has been removed from TM4 and SIC#31installed. |
|
925
|
Tuesday, June 02, 2015, 10:39 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | SiC#31 | Electrical Check | Electrical check on TM#4 with SiC#31. See
attached PDF for details. |
|
927
|
Tuesday, June 02, 2015, 14:32 |
David Wang | South Hot-Cell | Standard Operation | TM4 | SiC #31 | Leak check on TM4 HS water line with new SiC #31 target. at SHC | Chad and I leak checked TM4 HS water line
with SiC #31 target installed. leak rate:0.0xE-9atm.cc/sec.
No leak. The line will be helium pressurized |
  |
945
|
Friday, June 12, 2015, 13:27 |
David Wang | South Hot-Cell | Standard Operation | | | TM2 new source tray has been remotely transferred from TH into SHC successfully. | TM2 new source tray has been remotely transferred
into SHC successfully. The transfer table
has been moved back to TH within 1 hour. |
|
946
|
Monday, June 15, 2015, 09:42 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | Module moved | TM#2 is now in the south hot cell. |
|
947
|
Monday, June 15, 2015, 10:16 |
chad fisher | South Hot-Cell | Repair | TM2 | | C.B. off | As per scedule TM2 containment box has
been removed.
|
|