Entry  Tuesday, November 23, 2021, 10:46, Frank Song, ITE, Standard Operation, TM4, UCx#35, module disconnection IMG_4456_(2).JPG

 the TM4 with UCx#35 was disconnected in ITE.

Entry  Monday, November 22, 2021, 12:44, Adam Newsome, Crane, Repair, , , Crane PLC Fault: 0004h Fault_code_when_connecting_Nov_22_2021.png

An issue was observed in which the target hall crane was not functioning: the N-E-S-W and up/down motions did not work, however the rotation motion did work. These symptoms were similar to what was observed in the past under https://elog.triumf.ca/TIS/RH-ISAC/2039 and https://elog.triumf.ca/TIS/RH-ISAC/1845

The crane control console was not powered (i.e. pressing the ON/OFF buttons when the selector switch was set to remote mode, even when safety conditions were met, did not enable/disable remote functionality). The power supplies were checked and everything appeared to be powered as would be expected, except for items which depended on the main contactor (O-K1) being energized. This contactor needs the PLC to be in an operational state, fault-free. The PLC was checked and the red fault light was flashing. The battery light was not on (i.e. battery was OK).

The program was re-downloaded to the PLC. During an attempt to go online with the PLC, error code 0004h appeared (see attached image for description). This is an unfamiliar error code - typically the aforementioned symptoms arise due to a battery failure and the program being lost. In this case it is uncertain at this time what the cause of this fault is. It will be monitored in the future to determine if it occurs again, and further investigation will be performed.

After re-downloading the program and placing the PLC in RUN mode, the crane was fully restored to its operating state - the main contactor was able to be energized once again. The crane was put into remote mode and a brief functionality test on the motion axes was performed: OK.

 

 

Entry  Friday, November 19, 2021, 12:48, Adam Newsome, South Hot-Cell, Development, , , Vertical motion limit switch installation PXL_20211119_172142852.jpg

A rotary limit switch was installed, attached to the shaft adjacent to the drive motor for the vertical drive system. This limit switch is not yet wired to the control system and operational - this will be done at a future date and the e-log will be updated.

Relevant electrical drawings: IRH2083 to IRH2085

 

Edit (2022-03-02): see e-log https://elog.triumf.ca/TIS/RH-ISAC/2309

Entry  Thursday, November 18, 2021, 09:47, Travis Cave, Spent Target Vault, Standard Operation, , SiC#38 and UC#29, Spent Target Move Target_Index_2021-11-18.pdfTarget_Index_2021-11-18_mini_vault.pdf

 The spent targets SiC#38 and UC#29 have been removed from the spent target vault and placed into the mini storage. See attached PDF for details.

Entry  Wednesday, November 17, 2021, 11:42, Travis Cave, Spent Target Vault, Standard Operation, , Ta#57, Repacking of the targets. Target_Index_2021-11-17.pdfTarget_Index_2021-11-17_mini_vault.pdf

 Ta#57 was repacked and placed in the mini vault. The pail was changed from #174 to #263. See attached PDF for more details.

Entry  Monday, November 15, 2021, 12:15, Adam Newsome, South Hot-Cell, Repair, , , Squeaking noise during turntable rotation - chain misalignment and improper tension PXL_20211119_190640081.jpg

It was noted on Nov. 9 that a squeaking noise was present when the turntable was rotated CCW with a module present.

 

Upon inspection, it appears the issue could be due to drive chain misalignment and improper tension. Furthermore, it was noted that a shaft collar on one of the existing chain tensioners was broken (a replacement was ordered).

 

Repairs will be performed on Nov. 19 to resolve these issues by re-aligning the chain, and resetting the tensioners. The turntable will be tested. This e-log will be updated once the work is complete and the system is returned to a functioning state. See Work Permit I2021-11-09--3

 

Edit, Nov. 19: the aforementioned repairs were completed and the turntable has been tested and is operating correctly. No squeaking noise is present. It is suggested to increase the diameter of the two chain tensioner shafts (and thus modify related bearing and shaft collar components) in order to prevent bending of the shaft which was observed. This will be done in the near future.

Entry  Monday, November 15, 2021, 12:00, Travis Cave, Spent Target Vault, Standard Operation, , Ta#53, Repacking of the target. Target_Index_2021-11-15.pdfTarget_Index_2021-11-15_mini_vault.pdf

 Ta#53 was repacked and placed in the mini vault it was changed from pail#164 to pail#262. See attached PDF for further details.

Entry  Wednesday, November 10, 2021, 11:06, Travis Cave, Spent Target Vault, Standard Operation, , C#3, Spent Target Move Target_Index_2021-11-10.pdf

 The spent C#3 target has been moved from the south hot cell to the spent target vault it was placed in pail #270 and put in spot 2C of the vault. See attached PDF for more details.

Entry  Wednesday, November 10, 2021, 08:32, Frank Song, ITW, Standard Operation, TM2, UC#36, Module Connection IMG_4323.JPG

 TM2 with target UC#36 was connected at ITW.

Entry  Wednesday, November 10, 2021, 08:29, Frank Song, South Hot-Cell, Standard Operation, TM2, UC#36, electrical check IMG_4322.JPG

 An electrical check of TM2 with target UC#36 and no external connections was finished at SHC. 

Entry  Tuesday, November 09, 2021, 14:35, Adam Newsome, South Hot-Cell, Standard Operation, TM2, UCX#36, Module Move 

TM#2 was moved from ITW to SHC, then moved back to ITW.

Entry  Tuesday, November 09, 2021, 09:58, Frank Song, ITW, Standard Operation, TM2, C#3, module disconnection IMG_4315.jpg

 the module TM2 with target C#3 was disconnected at ITW and is being remoted moving to SHC.

Entry  Friday, October 29, 2021, 12:27, Travis Cave, Spent Target Vault, Standard Operation, , Ta#56, Repacking of the target. Target_Index_2021-10-29.pdfTarget_Index_2021-10-29_mini_vault.pdf

 Ta#56 in pail #169 was repacked and placed into #269 and was placed in the mini vault at the back. It was 3.86mSv/hr upon removal from the NHC. See attached files for details.

Entry  Tuesday, October 26, 2021, 11:01, Frank Song, ITE, Standard Operation, TM4, UCx#35, shielding blocks transfer 

 the five shielding blocks have been moved from ITW to ITE. 

Entry  Wednesday, October 13, 2021, 11:54, Travis Cave, North Hot-Cell, Standard Operation, , SiC#41, Spent Target Move Target_Index_2021-10-13.pdf

 The spent SiC#41 target has been placed in pail #260 and placed in spot 5B of that spent target vault. See attached PDF for details. 

Entry  Friday, October 08, 2021, 12:39, Frank Song, ITE, Standard Operation, TM4, UCx#35, Module Connection IMG_3742.jpgIMG_3741.jpgIMG_3743.jpgIMG_3744.jpg

 the module with target UC#35 was connected in ITE and being pumped down.

Entry  Friday, October 08, 2021, 11:19, Frank Song, North Hot-Cell, Standard Operation, TM4, UCx#35, TM4 IGLIS target electrical tests IMG_3739.jpgIMG_3740.jpg

 the tests were done when TM4 was on NHC. see attached photos please.

Entry  Wednesday, October 06, 2021, 10:42, David Wang, ITE, Repair, , , ITE IG1S cable end connector replacement 

ITE IG1S cable end connector replacement has been finished by Roy Huang.

Entry  Monday, October 04, 2021, 10:52, Travis Cave, North Hot-Cell, Standard Operation, TM4, SiC#41, Module move 

 TM#2 moved from ITE to NHC SiC#41 removed and then moved back to ITE.

Entry  Monday, October 04, 2021, 09:37, Frank Song, ITE, Standard Operation, TM4, Sic#41, module disconnection IMG_3715.jpgIMG_3716.jpgIMG_3717.jpg

 TM4 was disconnected and moved to NHC. 