779
|
Tuesday, November 04, 2014, 13:17 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | ThO#1 | TM1 w/ ThO#1 ready | Tm1 with ThO#1 is buttoned up and ready
for transport. |
|
|
780
|
Wednesday, November 05, 2014, 10:20 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | ThO#1 | module move | TM#1 with ThO#1 has been moved from the
south hot cell to the west target station. |
|
|
789
|
Monday, November 17, 2014, 13:45 |
chad fisher | South Hot-Cell | Repair | | | Jig for roof install of target | Jig for installation of target through
hot cell roof has been assembled and placed
in the target hall. |
|
|
790
|
Tuesday, November 18, 2014, 10:28 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#44 | module move | TM#4 with Ta#44 has been moved from the
east target station to the south hot cell. |
|
|
791
|
Tuesday, November 18, 2014, 11:14 |
David Wang | South Hot-Cell | Standard Operation | | UCx11 | crane down UCx 11 target into SHC from TH | I craned down UCx11 target from TH into
SHC. Chad was in SHC service area watching
on it. The source tray moving jig was installed |
|
|
793
|
Wednesday, November 19, 2014, 08:49 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | UCx#11 | Ta#44 Removed Ucx#11 Installed | Ta#44 has been removed from TM4 and UCx#11
has been installed and is ready for testing.
New fasteners were installed for |
|
|
794
|
Wednesday, November 19, 2014, 09:18 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#11 | Electrical check | TM#4 with UC#11 electrical check done.
See attached PDF for the results. |
|
|
800
|
Tuesday, November 25, 2014, 11:33 |
David Wang | South Hot-Cell | Development | | | Remove UCX 11 target transfer stand from SHC back to TH. | The stand was used for transferring UCX11
targte from TH to SHC. The stand wit target
was craned down from TH into SHC last week |
|
|
803
|
Friday, November 28, 2014, 13:06 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | module move | TM#2 with no target or source tray has
been moved from the north east silo to the
south hot cell. |
|
|
805
|
Monday, December 01, 2014, 14:06 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 REFURB. WATER LOOP TEST | Some issues with the turntable and having
to wait for a decision on whether to remove
TM2 from the hot cell so that TM4 with dead |
|
|
807
|
Tuesday, December 02, 2014, 10:15 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Reburb. Loop Install | Final polish, clean with methanol and clean
compressed air.
Loop installed and torqued to 90 |
|
|
808
|
Tuesday, December 02, 2014, 13:33 |
David Wang | South Hot-Cell | Development | TM2 | | Leak check on TM2 tube heater +(D) at SHC | Chad and I leak checked TM2 tube heater+(D)
circuit at SHC with water bypass loop and
new seals installed on the water block. The |
|
|
810
|
Thursday, December 04, 2014, 09:54 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | Electrical check | Results of electrical check of TM#2 with
no source tray and no containment box attached.
See PDF for results. |
|
|
831
|
Thursday, January 08, 2015, 10:34 |
chad fisher | South Hot-Cell | Standard Operation | | | TM2 Tray Build Status and Problems | Final assembly of the source tray for TM2
was started this morning.
Sliding tray was received from keensert |
|
|
833
|
Monday, January 12, 2015, 14:29 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Tray Build Status | Countersink problem with supports has been
remedied. Scratches, dings, and pitting has
been buffed out and supports re-cleaned and |
|
|
834
|
Tuesday, January 20, 2015, 13:45 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Tray Alignment | TM2 Tray Alignment is complete except for
verification with alignment tray.
First attempt results were: |
|
|
835
|
Monday, January 26, 2015, 09:36 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Tray Alignment | TM2 tray alignment was confirmed with the
alignment tray this morning:
Front target 0.000 vertically, 0.000 |
|
|
837
|
Thursday, January 29, 2015, 11:31 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Tray Build | On Tuesday morning I attempted to complete
assembly of the source tray for TM2 however
discovered that 3 1/4-20 x 0.25 titanium |
|
|
838
|
Monday, February 02, 2015, 09:59 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Tray Build | Missing heli coils installed this morning.
Threads had to be chased with tap
for 1/4-20 heli coil and missing countersinks |
|
|
839
|
Monday, February 02, 2015, 14:06 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Tray build | Master target jig installed to locate attachment
bracket ITA3389 as well as conductor insulator
block b (aluminum / for soldering version) |
|