Friday, September 17, 2021, 14:28, Travis Cave, Spent Target Vault, Standard Operation, , Ta#62, Spent Target Move
|
The spent Ta#62 target along with 2A2M19 were placed in pail #256 and placed in spot 7A of the spent target vault. See attached PDF for vault details. |
Friday, September 17, 2021, 12:34, Frank Song, ITE, Standard Operation, TM4, Sic#41, Module Connection
|
TM4 with a new target was moved back from NHC to ITE and reconnected at pit. The 5 shielding blocks were installed as well. Copies of connection
checklist are attached here. |
Friday, September 17, 2021, 12:20, Frank Song, North Hot-Cell, Standard Operation, TM4, Sic#41, TM4 SIS with Target and No external Connections
|
TM4 electric check with new target was done by David. A pic attached here for ref. |
Wednesday, September 15, 2021, 08:39, Travis Cave, ITE, Standard Operation, TM4, SiC#41, Module move
|
TM#4 with SiC#41 has been moved from the NHC to ITE. |
Tuesday, September 14, 2021, 09:18, Travis Cave, South Hot-Cell, Repair, TM4, SiC#40, Module move
|
TM#4 with SiC#40 has been moved from the east target station to the south hot cell. |
Thursday, August 12, 2021, 14:13, Adam Newsome, ITW, Repair, , , West Entrance Module Move to ITW
|
The West Entrance Module has been moved from the South Hot Cell to the West Target Station. |
Wednesday, August 11, 2021, 11:15, Adam Newsome, Spent Target Vault, Development, , , Mini-Storage: Cable track for e-chain installed
|
A cable track was installed between the mini-storage vault and the silos, for the purpose of implementing a retractable cable chain (e-chain). This will
allow for cables to be managed during door opening/closing, so that remote control operation of the door will be possible in the future. See Work Permit
I2021-08-11-2 (Aug 11) |
Tuesday, August 10, 2021, 10:16, Adam Newsome, South Hot-Cell, Repair, , , West Entrance Module Move to South Hot Cell
|
The West Entrance Module has been moved to the South Hot Cell for repair. |
Friday, August 06, 2021, 11:52, Travis Cave, North Hot-Cell, Standard Operation, , UC#33, Spent Target Move
|
UC#33 has been packed and moved from the north hot cell to the spent target vault. See attached PDF for
deatails |
Wednesday, August 04, 2021, 17:24, David Wang, North Hot-Cell, Standard Operation, TM2, UCx34#, UCX 34# on TM2 electical check and HS leak check at NHC.
|
The job is done with Matt at NHC. All TGHT and TBHT bolts are torque wrench tight in NHC. HS leak check result is good.
helium pressurized HS line at TCS. No leak. |
Friday, July 30, 2021, 16:31, Carla Babcock, ITE, Repair, , , ITE re-wire
|
See the attached for the way ITE has been re-wired for the Ta62 run. Note also that the copper block in the schematic on TBHT negative may not actually
be connected. Wiring verification on Aug. 4. |
Friday, July 30, 2021, 16:19, Carla Babcock, ITE, Repair, TM4, Ta#62, Electrical issues on Ta62
|
TLDR: TBHT voltage too high and rising too quickly with TGHT current - voltage
limited. TGHT power supply tripped breakers somehow. ITE:EL not outputting voltage.
|
Tuesday, July 20, 2021, 09:46, Adam Newsome, ITE, Standard Operation, TM4, , Remotely moved TM4 from TCS to ITE
|
TM4 was moved from the conditioning station to the East target station. |
Thursday, July 15, 2021, 09:02, Adam Newsome, Spent Target Vault, Standard Operation, , , Emergency Close Mechanism Test
|
The emergency close mechanism for the Storage Vault door was tested by Adam Newsome and Travis Cave. The door was opened to its fully open limit, then
closed with the emergency system.
The test was successful. |
Thursday, July 08, 2021, 11:45, David Wang, South Hot-Cell, Standard Operation, TM4, Ta#62, TM4 Ta#62 leak check and lectrical check result at SHC and TCS.
|
At SHC: HS line no leak . electrical check result is fine. At TCS: helium pressurized HS line to 70psi, 3 minutes. LD leak rate 0.0xE-9atm.cc/sec
, no response. |
Thursday, July 08, 2021, 11:36, David Wang, Conditioning Station, Standard Operation, TM4, Ta#62, Remotely remove TM4(Ta#62) from SHC to TCS.
|
Remotely remove TM4 (ta# 62) from SHC to TCS. The moving is smooth. |
Wednesday, July 07, 2021, 11:59, Adam Newsome, Safe Module Parking, Maintenance, , , Annual Electrical and Mechanical Inspection
|
An annual electrical and mechanical inspection was performed on the SMP today by Adam Newsome, Dan McDonald, and Jason Zhang as per Work Permit I2021-07-07-3.
The following items were checked:
Check condition of wiring for physical/radiation/UV damage
OK, no signs of significant damage
|
Wednesday, June 30, 2021, 14:11, Matthew Gareau, North Hot-Cell, Standard Operation, , , North Hot Cell Commemorative Opening
|
Yesterday a bottle of Cava (sparkling wine) was place, opened, and poured in the NHC, to commemorate its new operational status.
The NHC is now a functional hot cell and is ready for many years of target exchanges to come. |
Tuesday, June 22, 2021, 15:35, David Wang, ITW, Standard Operation, TM2, UCX33#, TM2 has been connected it ITW.
|
TM2 has been connected it ITW. All turbo pumps are started. |
Friday, June 11, 2021, 10:36, David Wang, Conditioning Station, Standard Operation, TM2, UCX33#, TM2 leak check at TCS
|
Leak checked TM2 service cap at TCS. helium pressure checked containment box window and HS cooling lines. No leak on service cap and waterlines.
|
|