  2278   Friday, November 26, 2021, 10:52 Adam NewsomeSpent Target VaultStandard Operation UC#35Spent Target MoveThe spent UC#35 target has been moved from
the south hot cell to the  spent target vault.
It was placed in pail #264 and put in spot
 Target_Index_2021-11-26.pdf 
  2248   Tuesday, September 21, 2021, 13:47 Travis CaveNorth Hot-CellStandard OperationTM2UC#34Module move TM#2 with UC#34 has been moved from
ITW to the north hot cell had the target
removed and then moved to the south west
  
  2249   Wednesday, September 22, 2021, 11:13 Travis CaveSpent Target VaultStandard Operation UC#34Spent Target Move The spent UC#34 target was moved
from the north hot cell to the spent target
vault. See attached PDF for details.
 Target_Index_2021-09-22.pdf 
  2239   Friday, August 06, 2021, 11:52 Travis CaveNorth Hot-CellStandard Operation UC#33Spent Target MoveUC#33 has been packed and moved from the north
hot cell to the spent target vault. See attached
PDF for 
 Target_Index_2021-08-06.pdf 
  2146   Wednesday, September 23, 2020, 10:56 chad fisherSouth Hot-CellStandard OperationTM4UC#31 P2NUc#30 removed UC#31 P2N installedUCx#30 has been removed from TM#4 and put
in a can with argon. 5(10) pin connector
had to have guide screws removed to be uninstalled.
  
  2148   Thursday, September 24, 2020, 11:25 David WangConditioning StationStandard OperationTM4UC#31TM4 HS line leak check at SHC and TCS.Both helium spray and helium pressurize
on TM4 HS line withUCx31 target are done
at SHC and TCS. No leak.
  
  2150   Tuesday, September 29, 2020, 12:29 Travis CaveITEStandard OperationTM4UC#31Module move Module move of TM#4 with UC#31 was
finished to today at around 10:30AM.
  
  2151   Tuesday, September 29, 2020, 14:28 David WangSouth Hot-CellStandard OperationTM4UC#31TM4 UC#31 Electrical check and HS leak checkTm4 UCx 31# electrical check result. See
attachment.
 TM4_UCx31_elctrical_and_leak_check_at_SHC..pdfScanned_from_a_Xerox_Multifunction_Printer.pdf 
  2153   Tuesday, October 13, 2020, 10:16 Travis CaveITERepairTM4UC#31Module move TM#4 is now in the south hot cell
from the east target station.
  
  2154   Thursday, October 15, 2020, 12:48 Travis CaveITEStandard OperationTM4UC#31Module move TM#4 is now back in the east target
station.
  
  2160   Tuesday, November 03, 2020, 10:52 Travis CaveSouth Hot-CellStandard OperationTM4UC#31Module move TM#4 with UC#31 has been moved from
the east target station to the south hot
cell.
  
  2163   Thursday, November 12, 2020, 10:02 Travis CaveSpent Target VaultStandard Operation UC#31Spent Target Move UC#31 has been moved from the south
hot cell to the spent target vault. It is
in spot 8B of the vault in pail # 224 and
  
  2119   Friday, July 03, 2020, 14:08 Travis CaveITEStandard OperationTM4UC#30Module move TM#4 with UC#30 has been moved from
the south hot cell to the east target station.
  
  2145   Tuesday, September 22, 2020, 10:56 Travis CaveSouth Hot-CellStandard OperationTM4UC#30Module move TM#4 with UC#30 has been moved from
ITE to the south hot cell.
  
  2147   Thursday, September 24, 2020, 10:34 Travis CaveSpent Target VaultStandard Operation UC#30Spent Target Move UC#30 has been placed into the spent
target vault, it was placed in pail 238 and
in spot 1A of the vault. It was 81.5 mSv/hr
 Target_Index_2020-09-24.pdf 
  74   Monday, March 12, 2012, 10:03 chad fisherSouth Hot-CellStandard OperationTM1UC#3UC#3 RemovalUC#3 was removed from TM1 this morning.
Upon removing the oven heater bolts BOTH
legs fell demonstrating that both sides of
 IMG_0610.JPGIMG_0616.JPG 
  2013   Thursday, October 24, 2019, 14:11 Travis CaveITWStandard OperationTM4UC#29Module move TM#4 with UC29 has been moved from
the south hot cell to the west target station.
  
  2058   Tuesday, February 04, 2020, 14:22 Travis CaveSouth Hot-CellStandard OperationTM4UC#29Module move TM#4 with UC#29 has been moved from
the west target station to the south hot
cell.
  
  2063   Thursday, February 06, 2020, 13:31 Adam NewsomeSpent Target VaultStandard Operation UC#29UC#29 moved to vault location 6A, in pail 225 UC#29 in pail 225 was moved to the
storage vault, location 6A. Field measured
at 22.4 mSv/hr at ~1m. 
  
  1999   Friday, October 04, 2019, 14:53 Travis CaveSouth Hot-CellStandard OperationTM4UC#28Module move TM#4 with UC#28 has been moved from
the south hot cell to the west target station.
  