Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC, Page 24 of 141  Not logged in ELOG logo
  ID Date Authordown Category Type Module Target/Number Subject
  430   Tuesday, August 27, 2013, 14:14 Travis CaveITWStandard OperationTM1UC#7module move

TM#1 with UCx#7 has been moved from the south hot cell to the west target station.

  432   Wednesday, August 28, 2013, 14:17 Travis CaveSouth Hot-CellStandard Operation UC#6Spent target move

Spent target move, UC#6 has been moved from the south hot cell to the target storage. The target is in pail 108 and in slot 8C of the vault. See attached PDF for details.

Attachment 1: Vault_Storage_August_28_2013.pdf
Vault_Storage_August_28_2013.pdf Vault_Storage_August_28_2013.pdf Vault_Storage_August_28_2013.pdf Vault_Storage_August_28_2013.pdf
  433   Wednesday, August 28, 2013, 14:25 Travis CaveConditioning StationStandard OperationTM3no targetmodule move

TM#3 with no target has been moved from the conditioning station to the south hot cell. The fields observed around the containment box of the module ranged from 0.80 mSv/hr to 1.8mSv/hr..

  448   Wednesday, September 11, 2013, 11:31 Travis CaveConditioning StationStandard OperationTM3no targetmodule move

TM#3 with no target has been moved to the conditioning station from the south hot cell.

  451   Thursday, September 12, 2013, 09:29 Travis CaveITWStandard OperationTM4SiC#29module move

TM#4 with SiC#29 has been moved to the south hot cell move went well.

  452   Thursday, September 12, 2013, 10:35 Travis CaveSouth Hot-CellStandard OperationTM4SiC#29Electrical check

TM#4 with SiC#29 post beam electrical check in the south hot cell see PDF for details.

Attachment 1: TM#4SiC#29FEBIADelechkpostbeam.PDF
TM#4SiC#29FEBIADelechkpostbeam.PDF
  456   Thursday, September 19, 2013, 09:08 Travis CaveSouth Hot-CellStandard OperationTM3no targetwiring harness

The wiring harness for TM#3 was made and a continuity and megger test was done on it and it passed, it has since been installed into the hot cell and placed on the module.

  457   Thursday, September 19, 2013, 11:09 Travis CaveSouth Hot-CellMaintenanceTM3no targetElectrical check

Electrical check of TM#3 with no target was performed and it failed. There is a 135M Ohm short between the coils and a 165M Ohm short between the coil and 60kV common.  All other circuits passed they were infinite in value.

  461   Tuesday, September 24, 2013, 08:15 Travis CaveSouth Hot-CellStandard OperationTM3no targetElectrical check

Electrical check was done on TM#3 yesterday and again the coil lines to the 60kV common and the coil line to each other failed, as in they had a resistance. Everything else passed as showing an infinite value, all meggering was done at 1000V unless noted other wise. See attached PDF for details.

Attachment 1: TM#3_elec_chk_no_target.PDF
TM#3_elec_chk_no_target.PDF
  464   Wednesday, September 25, 2013, 10:00 Travis CaveSouth Hot-CellStandard OperationTM3NiO#2module move

TM#3 with NiO#2 has been moved from the south hot cell to the conditioning station.

  465   Wednesday, September 25, 2013, 11:08 Travis CaveSouth Hot-CellStandard OperationTM3NiO#2Electrical check

The module was checked electrically this morning before the module move. See the attached PDF for details.

Attachment 1: TM#3_elec_chk_NiO#2_SHC.PDF
TM#3_elec_chk_NiO#2_SHC.PDF
  466   Wednesday, September 25, 2013, 13:48 Travis CaveConditioning StationStandard OperationTM3NiO#2Electrical check

Electrical check of TM#3 in the conditioning station under vacuum see attached PDF for details.

Attachment 1: TM#3_elec_chk_NiO#2_CS.PDF
TM#3_elec_chk_NiO#2_CS.PDF
  475   Friday, September 27, 2013, 10:54 Travis CaveConditioning StationStandard OperationTM3NiO#2module move

TM#3 with NiO#2 has been moved to the south hot cell from the conditioning station.

  477   Monday, September 30, 2013, 12:23 Travis CaveSouth Hot-CellStandard OperationTM3NiO#2Electrical check

Results of the various electrical checks done on TM#3 while at the hot cell since the 27th of September. View PDF for the details.

Attachment 1: TM#3_elec_chk_NiO#2_SHC2.PDF
TM#3_elec_chk_NiO#2_SHC2.PDF TM#3_elec_chk_NiO#2_SHC2.PDF TM#3_elec_chk_NiO#2_SHC2.PDF
  478   Monday, September 30, 2013, 14:00 Travis CaveConditioning StationStandard OperationTM3NiO#2module move

TM#3 with NiO#2 has been move from south hot cell to the conditioning station.

  483   Tuesday, October 01, 2013, 10:59 Travis CaveSouth Hot-CellStandard OperationTM4SiC#29Electrical check

TM#4 with SiC#29 electrical check post beam see pdf for details.

Attachment 1: TM#4_elec_chk_SiC#29_SHC_post2.PDF
TM#4_elec_chk_SiC#29_SHC_post2.PDF
  484   Tuesday, October 01, 2013, 11:00 Travis CaveConditioning StationStandard OperationTM3NiO#2Electrical check

TM#3 with NiO#2 electrical check at conditioning station under vacuum, see pdf for details.

Attachment 1: TM#3_elec_chk_NiO#2_CS2.PDF
TM#3_elec_chk_NiO#2_CS2.PDF
  487   Wednesday, October 02, 2013, 14:47 Travis CaveSouth Hot-CellStandard OperationTM4no targetElectrical check

Electrical check done on TM#4 with no target, see PDF.

Attachment 1: TM#4_elec_chk_No_Tgt_SHC.PDF
TM#4_elec_chk_No_Tgt_SHC.PDF
  488   Thursday, October 03, 2013, 10:18 Travis CaveSouth Hot-CellStandard OperationTM4no targetmodule move

TM#4 with no target has been moved from the south hot cell to the south west silo.

  496   Monday, October 07, 2013, 12:06 Travis CaveITEStandard OperationTM3NiO#2module move

TM#3 has been moved from the conditioning station to the east target station, move went well.

ELOG V2.9.2-2455