|
ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
|
465
|
Wednesday, September 25, 2013, 11:08 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | NiO#2 | Electrical check |
The module was checked electrically this morning before the module move. See the attached PDF for details. |
Attachment 1: TM#3_elec_chk_NiO#2_SHC.PDF
|
|
|
466
|
Wednesday, September 25, 2013, 13:48 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | NiO#2 | Electrical check |
Electrical check of TM#3 in the conditioning station under vacuum see attached PDF for details. |
Attachment 1: TM#3_elec_chk_NiO#2_CS.PDF
|
|
|
475
|
Friday, September 27, 2013, 10:54 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | NiO#2 | module move |
TM#3 with NiO#2 has been moved to the south hot cell from the conditioning station. |
|
477
|
Monday, September 30, 2013, 12:23 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | NiO#2 | Electrical check |
Results of the various electrical checks done on TM#3 while at the hot cell since the 27th of September. View PDF for the details. |
Attachment 1: TM#3_elec_chk_NiO#2_SHC2.PDF
|
|
|
478
|
Monday, September 30, 2013, 14:00 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | NiO#2 | module move |
TM#3 with NiO#2 has been move from south hot cell to the conditioning station. |
|
483
|
Tuesday, October 01, 2013, 10:59 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | SiC#29 | Electrical check |
TM#4 with SiC#29 electrical check post beam see pdf for details. |
Attachment 1: TM#4_elec_chk_SiC#29_SHC_post2.PDF
|
|
|
484
|
Tuesday, October 01, 2013, 11:00 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | NiO#2 | Electrical check |
TM#3 with NiO#2 electrical check at conditioning station under vacuum, see pdf for details. |
Attachment 1: TM#3_elec_chk_NiO#2_CS2.PDF
|
|
|
487
|
Wednesday, October 02, 2013, 14:47 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | Electrical check |
Electrical check done on TM#4 with no target, see PDF. |
Attachment 1: TM#4_elec_chk_No_Tgt_SHC.PDF
|
|
|
488
|
Thursday, October 03, 2013, 10:18 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | module move |
TM#4 with no target has been moved from the south hot cell to the south west silo. |
|
496
|
Monday, October 07, 2013, 12:06 |
Travis Cave | ITE | Standard Operation | TM3 | NiO#2 | module move |
TM#3 has been moved from the conditioning station to the east target station, move went well. |
|
497
|
Tuesday, October 08, 2013, 13:11 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#29 | Spent target move |
SiC#29 has been moved to the spent target vault. The target was placed in Pail #109 and placed into slot 2B it was 24.7mS/hr upon removal from the south hot cell. See attached PDF of the vault details. |
Attachment 1: Vault_Storage_October_8_2013.pdf
|
|
|
498
|
Tuesday, October 08, 2013, 14:55 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | module move |
TM#4 with no target was to be moved today but the move was aborted when the crane failed to move in the East - West direction. The crane does not preform this function in either remote or pendant operation. |
|
504
|
Wednesday, October 16, 2013, 10:12 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | module move |
TM#4 with no target has been moved from the south west silo to the south hot cell. |
|
512
|
Friday, October 18, 2013, 14:56 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | Electrical check |
With the coil line removed an electrical check was done on TM#4 at the South Hot Cell see attached pdf. |
Attachment 1: TM#4_no_target_post_coilelectest.PDF
|
|
|
516
|
Tuesday, October 22, 2013, 11:18 |
Travis Cave | ITW | Standard Operation | TM1 | UC#7 | module move |
TM#1 with UC#7 has been moved from the ITW to the south west silo. |
|
521
|
Wednesday, October 23, 2013, 09:28 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | UC#7 | module move |
TM#1 with UC #7 has been moved from the south west silo to the south hot cell. |
|
522
|
Wednesday, October 23, 2013, 12:07 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | no target | module move |
TM#1 with no target has been moved back to the south west silo from the south hot cell. |
|
523
|
Thursday, October 24, 2013, 11:31 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#7 | Spent target move |
UC #7 has been moved from the south hot cell to the spent target vault, it was placed in pail #110 and put in slot 8B of the vault, it was 22.6mSv/hr upon removal from the hot cell. See attached PDF for vault details. |
Attachment 1: Vault_Storage_October_24_2013.pdf
|
|
|
524
|
Thursday, October 24, 2013, 11:32 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | module move |
TM#4 with no target has been moved from the conditioning station to the south hot cell. |
|
528
|
Friday, October 25, 2013, 10:26 |
Travis Cave | ITW | Standard Operation | TM4 | Ta#41 | module move |
TM#4 with Ta#41 has been moved from the south hot cell to the west target station. |