  2278   Friday, November 26, 2021, 10:52 Adam NewsomeSpent Target VaultStandard Operation UC#35Spent Target Move

The spent UC#35 target has been moved from the south hot cell to the spent target vault. It was placed in pail #264 and put in spot 6A of the vault. See attached PDF for more details.

Attachment 1: Target_Index_2021-11-26.pdf
Target_Index_2021-11-26.pdf
  2248   Tuesday, September 21, 2021, 13:47 Travis CaveNorth Hot-CellStandard OperationTM2UC#34Module move

 TM#2 with UC#34 has been moved from ITW to the north hot cell had the target removed and then moved to the south west silo.

  2249   Wednesday, September 22, 2021, 11:13 Travis CaveSpent Target VaultStandard Operation UC#34Spent Target Move

 The spent UC#34 target was moved from the north hot cell to the spent target vault. See attached PDF for details.

Attachment 1: Target_Index_2021-09-22.pdf
Target_Index_2021-09-22.pdf Target_Index_2021-09-22.pdf Target_Index_2021-09-22.pdf
  2239   Friday, August 06, 2021, 11:52 Travis CaveNorth Hot-CellStandard Operation UC#33Spent Target Move
UC#33 has been packed and moved from the north hot cell to the spent target vault. See attached PDF for 
deatails
Attachment 1: Target_Index_2021-08-06.pdf
Target_Index_2021-08-06.pdf Target_Index_2021-08-06.pdf Target_Index_2021-08-06.pdf
  2146   Wednesday, September 23, 2020, 10:56 chad fisherSouth Hot-CellStandard OperationTM4UC#31 P2NUc#30 removed UC#31 P2N installed

UCx#30 has been removed from TM#4 and put in a can with argon. 5(10) pin connector had to have guide screws removed to be uninstalled.

UCx#31 P2N installed.

  2148   Thursday, September 24, 2020, 11:25 David WangConditioning StationStandard OperationTM4UC#31TM4 HS line leak check at SHC and TCS.

Both helium spray and helium pressurize on TM4 HS line withUCx31 target are done at SHC and TCS. No leak.

  2150   Tuesday, September 29, 2020, 12:29 Travis CaveITEStandard OperationTM4UC#31Module move

 Module move of TM#4 with UC#31 was finished to today at around 10:30AM.

  2151   Tuesday, September 29, 2020, 14:28 David WangSouth Hot-CellStandard OperationTM4UC#31TM4 UC#31 Electrical check and HS leak check

Tm4 UCx 31# electrical check result. See attachment.

Attachment 1: TM4_UCx31_elctrical_and_leak_check_at_SHC..pdf
TM4_UCx31_elctrical_and_leak_check_at_SHC..pdf
Attachment 2: Scanned_from_a_Xerox_Multifunction_Printer.pdf
Scanned_from_a_Xerox_Multifunction_Printer.pdf
  2153   Tuesday, October 13, 2020, 10:16 Travis CaveITERepairTM4UC#31Module move

 TM#4 is now in the south hot cell from the east target station.

  2154   Thursday, October 15, 2020, 12:48 Travis CaveITEStandard OperationTM4UC#31Module move

 TM#4 is now back in the east target station.

  2160   Tuesday, November 03, 2020, 10:52 Travis CaveSouth Hot-CellStandard OperationTM4UC#31Module move

 TM#4 with UC#31 has been moved from the east target station to the south hot cell.

  2163   Thursday, November 12, 2020, 10:02 Travis CaveSpent Target VaultStandard Operation UC#31Spent Target Move

 UC#31 has been moved from the south hot cell to the spent target vault. It is in spot 8B of the vault in pail # 224 and was 3.71mSv/hr upon removal from the south hot cell.

  2119   Friday, July 03, 2020, 14:08 Travis CaveITEStandard OperationTM4UC#30Module move

 TM#4 with UC#30 has been moved from the south hot cell to the east target station.

  2145   Tuesday, September 22, 2020, 10:56 Travis CaveSouth Hot-CellStandard OperationTM4UC#30Module move

 TM#4 with UC#30 has been moved from ITE to the south hot cell.

  2147   Thursday, September 24, 2020, 10:34 Travis CaveSpent Target VaultStandard Operation UC#30Spent Target Move

 UC#30 has been placed into the spent target vault, it was placed in pail 238 and in spot 1A of the vault. It was 81.5 mSv/hr when removed from the south hot cell. 

Attachment 1: Target_Index_2020-09-24.pdf
Target_Index_2020-09-24.pdf Target_Index_2020-09-24.pdf Target_Index_2020-09-24.pdf
  74   Monday, March 12, 2012, 10:03 chad fisherSouth Hot-CellStandard OperationTM1UC#3UC#3 Removal

UC#3 was removed from TM1 this morning. Upon removing the oven heater bolts BOTH legs fell demonstrating that both sides of the oven tube have broken off from the central block.

Target was put into a can under argon for disposal after the module is removed from the cell.

The source tray looked to be in very good, clean condition.

IMG_0610.JPG

Attachment 2: IMG_0616.JPG
IMG_0616.JPG
  2013   Thursday, October 24, 2019, 14:11 Travis CaveITWStandard OperationTM4UC#29Module move

 TM#4 with UC29 has been moved from the south hot cell to the west target station.

  2058   Tuesday, February 04, 2020, 14:22 Travis CaveSouth Hot-CellStandard OperationTM4UC#29Module move

 TM#4 with UC#29 has been moved from the west target station to the south hot cell.

  2063   Thursday, February 06, 2020, 13:31 Adam NewsomeSpent Target VaultStandard Operation UC#29UC#29 moved to vault location 6A, in pail 225

 UC#29 in pail 225 was moved to the storage vault, location 6A. Field measured at 22.4 mSv/hr at ~1m. 

  1999   Friday, October 04, 2019, 14:53 Travis CaveSouth Hot-CellStandard OperationTM4UC#28Module move

 TM#4 with UC#28 has been moved from the south hot cell to the west target station.